About this file
This document is a set of project drawings for the Kelly Gulch Culvert Replacement project on the Klamath National Forest. The key details are:
The project intends to provide volitional fish passage at the Kelly Gulch crossing on a USFS Level 2 gravel road by replacing the existing perched culvert with a 15-foot span x 6-foot 7-inch rise multi-plate arch culvert with a simulated streambed. The design includes details on the proposed arch layout, streambed construction, road rehabilitation, and erosion control measures. Estimated project quantities include 625 cubic yards of excavation, 95 cubic yards of streambed matrix, and 30 cubic yards of base and surface course materials. The project is located in Siskiyou County, California and supports populations of winter steelhead, fall chinook, and ESA-listed SONCC coho salmon. Construction notes, cross-sections, and other technical specifications are provided.
The related federal contract opportunity, Solicitation Number 127EAW24R0033 - Kelly Gulch Culvert, is a total small business set-aside with an estimated construction value between $100,000 and $250,000. Requests for Information are due by May 29th, 2024.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A00002 - Updated Drawings and SOW.pdf | ||
| 1. Statement of Work - REVISION 001.pdf | ||
| A00001 - Site Visit Information.pdf | ||
| 5. Fire Plan.pdf | ||
| 1. Statement of Work.pdf | ||
| 127EAW24R0033 - Kelly Gulch Culvert.pdf | ||
| 4. Supplemental Specifications.pdf | ||
| 6. Davis-Bacon Act WD # CA20240007.pdf | ||
| 3. Project Drawings.pdf | ||
| 2. Schedule of Items.docx | DOCX document | |
| 7. RFI Form.docx | DOCX document |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DRAWING NUMBER
PROJECT NUMBER
N O
D A T E
B Y
D E S C R
IP
T
IO
N
C H K
SW
J ef fe rs on
A ve nu e
C or va llis
, O R
1.
8.
1.0
RDG-20-087
PROJECT VICINITY MAP
1.0 COVER SHEET AND NOTES
2.0 EXISTING CONDITIONS
2.1 EXISTING CROSS SECTIONS
2.2 EXISTING CROSS SECTIONS
3.0 PROPOSED MULTI-PLATE ARCH LAYOUT
3.1 MULTI-PLATE ARCH AND STREAMBED DETAILS
3.2 PROPOSED MULTI-PLATE ARCH CROSS SECTIONS
4.0 ROAD REHABILITATION
5.0 EROSION CONTROL, ACCESS, AND STAGING
5.1 WORK AREA ISOLATION
DRAWING INDEX
SECTION OR DETAIL
SHEET WHERE SECTION
OR DETAIL IS SHOWN
DIRECTION OF
SECTION
CROSS-SECTION SHEET REFERENCE
SE 1/4 OF THE SW 1/4 OF SECTION 18, T.40N., R.11W., MT. DIABLO MERIDIAN
SISKIYOU COUNTY, CALIFORNIA
USGS QUADRANGLE: SAWYERS BAR, CA
Drawing of1 10
C O
V E
R S
H E
E T
A N
D N
O T
E S
KE
LL
Y G
U
LC
H C
U
LV
ER
T
R
EP
LA
C
EM
EN
T
SA
W
YE
R S
BA
R
, C A
KELLY GULCH CULVERT REPLACEMENT
SAWYERS BAR, CA
PERMIT
W is co ns in A ve nu e W hi te fis h, M T
6.
2.
THIS PROJECT INTENDS TO PROVIDE VOLITIONAL FISH PASSAGE AT THE KELLY GULCH CROSSING ON USFS ROAD #40N39, A USFS LEVEL 2 GRAVEL ROAD. KELLY GULCH IS A TRIBUTARY TO THE NF SALMON RIVER WHICH SUPPORTS POPULATIONS OF WINTER STEELHEAD, FALL CHINOOK, AND ESA-LISTED SONCC COHO SALMON. THE EXISTING CULVERT AT THE KELLY GULCH CULVERT IS PERCHED APPROXIMATELY 4 FEET AND CONSTITUTES A BARRIER TO PASSAGE. THESE PLANS PRESENT A CULVERT REPLACEMENT FOR FISH PASSAGE WITH A SIMULATED STREAMBED, FOLLOWING STREAM SIMULATION DESIGN
GUIDELINES FROM USFS (2008) AND ARBO II PROGRAMMATIC BIOLOGICAL OPINION .
PROJECT DESCRIPTION
PROJECT PARTNERS
SPATIAL REFERENCE
SURVEY CONTROL USED FOR THE PROJECT IS PROVIDED ON DRAWING 2.0 AND COORDINATES CORRESPOND TO THE TOP
CENTER OF CONTROL MARKERS.
LIDAR, GPS RTK, AND TOTAL STATION:
HORIZONTAL PROJECTION: CALIFORNIA STATE PLANE, ZONE 1 SURVEY DATE: 10/16/20
HORIZ DATUM: NAD 83 UNITS: US FEET
VERT DATUM: NAVD 88 UNITS: US FEET
REUSE OF DRAWINGS
THESE DRAWINGS, THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUMENT OF PROFESSIONAL SERVICE, ARE THE PROPERTY OF RIVER DESIGN GROUP, INC. (RDG) AND ARE NOT TO BE USED, IN WHOLE OR IN PART, FOR ANY OTHER PROJECT WITHOUT THE WRITTEN AUTHORIZATION OF RDG. LIKEWISE, THESE DRAWINGS MAY NOT BE ALTERED OR MODIFIED WITHOUT AUTHORIZATION OF RDG. DRAWING DUPLICATION IS ALLOWED IF THE ORIGINAL CONTENT IS NOT MODIFIED.
STANDARD OF PRACTICE
TF
PE
R M
IT
R
EV
IE
W
SW
/1
8/
RDG WORKS EXCLUSIVELY IN THE RIVER ENVIRONMENT AND EMPLOYS THE MOST CURRENT AND ACCEPTED PRACTICES AVAILABLE FOR PLANNING AND DESIGN OF FISH PASSAGE, RESTORATION, AND CHANNEL ENHANCEMENT PROJECTS. THE ANALYSIS FOR THE CULVERT DESIGN RELIED ON CURRENT FISH PASSAGE CRITERIA FROM CDFG AND NMFS/NOAA. ALL WORK WAS PERFORMED OR DIRECTED BY A REGISTERED PROFESSIONAL CIVIL ENGINEER WITH PAST EXPERIENCE IN FISH
PASSAGE DESIGN.
SIGNATURES
DESIGNED BY:
PROJECT ENGINEER DATE
APPROVED BY:
FOREST ENGINEER, KLAMATH N.F. DATE
APPROVED BY:
DISTRICT RANGER DATE
03/18/24 /s/ SCOTT WRIGHT
25852590
25952600
0+
1+
0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00 4+50 5+00 5+50
PI
PE
IN
VE
R T
ST
A
2+
, E
LE
V
.2
PI
PE
IN
VE
R T
ST
A
3+
, E
LE
V
.8
TOP OF BANK / OHW
(ORDINARY HIGH WATER), TYP
CONTROL NETWORK
POINT #
NORTHING
2367848.13
2367737.69
2367774.00
EASTING
6245156.48
6245162.74
6245003.23
ELEVATION
2584.80
2589.12
2573.39
DESCRIPTION
FND 5/8" REBAR
SET RDG CAP
FND 5/8" REBAR
DRAWING NUMBER
PROJECT NUMBER
N O
D A T E
B Y
D E S C R
IP
T
IO
N
C H K
SW
J ef fe rs on
A ve nu e
C or va llis
, O R
1.
8.
2.0 Drawing of2 10
W is co ns in A ve nu e W hi te fis h, M T
6.
2.
RDG-20-087
TF
PE
R M
IT
R
EV
IE
W
SW
/1
8/
N
W E
S
HORIZ 1" = 40'
VERT 1" = 40'
EXISTING LONG PROFILE2
1" = 40'
EXISTING CONDITIONS PLAN VIEW1
KELLY GULCH
flow
1' EXISTING
CONTOURS
EXISTING CREEK
ALIGNMENT
KELLY GULCH ROAD
TO SAWYERS BAR ROAD
EXISTING CHANNEL
PROFILE
E X
IS
T
IN
G
C O
N D
IT
IO
N S
KE
LL
Y G
U
LC
H C
U
LV
ER
T
R
EP
LA
C
EM
EN
T
SA
W
YE
R S
BA
R
, C A
DRAINAGE AREA 1.0 SQ. MILES
AVERAGE REACH SLOPE 0.0951 FT/FT
ACTIVE CHANNEL WIDTH ±10 FT
2-YEAR FLOW 72.6 cfs 10-YEAR FLOW 201 cfs 25-YEAR FLOW 274 cfs 50-YEAR FLOW 330 cfs 100-YEAR FLOW 390 cfs
STREAM REACH CHARACTERISTICS
KELLY GULCH
ROAD
EXISTING 5' CMP
WATER SURFACE
10/16/20
APPROX. REACHSLOPE = 0.0842 FT/FT
APPROX. REACHSLOPE = 0.1081 FT/FT
EXISTING 5'
CMP CULVERT
NOTE:
EXISTING CONDITION INFORMATION IS NOT A
LAND SURVEY AND IS PRIMARILY A
TOPOGRAPHIC ANALYSIS FOR RESTORATION
DESIGN PURPOSES.
COORDINATE SYSTEM: CALIFORNIA STATE
PLANES ZONE 1
HORIZ DATUM: NAD83
VERT DATUM: NAVD88
UNITS: US FEET
EXISTING ROAD
ORDINARY HIGH
WATER (OHW)
ORDINARY HIGH
WATER (OHW)
2+25
0 10 20 300-1
-2
-3
2+50
0 10 20 300-1
-2
-3
2+88
0 10 20 300-1
-2
-3
3+57
0 10 20 300-1
-2
-3
OHW
OHW
OHW
OHW
DRAWING NUMBER
PROJECT NUMBER
N O
D A T E
B Y
D E S C R
IP
T
IO
N
C H K
SW
J ef fe rs on
A ve nu e
C or va llis
, O R
1.
8.
2.1
RDG-20-087
Drawing of3 10
W is co ns in A ve nu e W hi te fis h, M T
6.
2.
TF
PE
R M
IT
R
EV
IE
W
SW
/1
8/
*HORIZ 1" = 10'
VERT 1" = 10'
EXISTING CROSS SECTIONS1
E X
IS
T
IN
G
C R
O S
S S
E C
T
IO
N S
KE
LL
Y G
U
LC
H C
U
LV
ER
T
R
EP
LA
C
EM
EN
T
SA
W
YE
R S
BA
R
, C A
EXISTING
GROUND, TYP
WATER SURFACE
10/16/20
WATER SURFACE
10/16/20
WATER SURFACE
10/16/20
WATER SURFACE
10/16/20
BANKFULL
WIDTH
BANKFULL
WIDTH
WIDENED SECTION
UPSTREAM OF CULVERT
SCOUR POOL
DOWNSTREAM
OF CULVERT
3+67
0 10 20 300-1
-2
-3
3+75
0 10 20 300-1
-2
-3
OHW
OHW
DRAWING NUMBER
PROJECT NUMBER
N O
D A T E
B Y
D E S C R
IP
T
IO
N
C H K
SW
J ef fe rs on
A ve nu e
C or va llis
, O R
1.
8.
2.2
RDG-20-087
Drawing of4 10
W is co ns in A ve nu e W hi te fis h, M T
6.
2.
TF
PE
R M
IT
R
EV
IE
W
SW
/1
8/
HORIZ 1" = 10'
VERT 1" = 10'
EXISTING CROSS SECTIONS1
E X
IS
T
IN
G
C R
O S
S S
E C
T
IO
N S
KE
LL
Y G
U
LC
H C
U
LV
ER
T
R
EP
LA
C
EM
EN
T
SA
W
YE
R S
BA
R
, C A
EXISTING
GROUND, TYP
WATER SURFACE
10/16/20
WATER SURFACE
10/16/20
BANKFULL
WIDTH
BANKFULL
WIDTH
25602565
256225632564
0+00 0+50 1+00 1+20
ST
AR
T
ST
R
EA
M
BE
D
ST
A 0+
, E
LE
V
.9
BO
TT
O M
O F
FO
O
TI
N
G
ST
A 0+
, E
LE
V
.2
BO
TT
O M
O F
FO
O
TI
N
G
ST
A 0+
, E
LE
V
.3
EN
D
S
TR
EA
M
BE
D
ST
A
1+
, E
LE
V
.1
DRAWING NUMBER
PROJECT NUMBER
N O
D A T E
B Y
D E S C R
IP
T
IO
N
C H K
SW
J ef fe rs on
A ve nu e
C or va llis
, O R
1.
8.
3.0 Drawing of5 10
P R
O P
O S
E D
M U
LT
I-
P
LA
T E
A R
C H
L A
Y O
U T
KE
LL
Y G
U
LC
H C
U
LV
ER
T
R
EP
LA
C
EM
EN
T
SA
W
YE
R S
BA
R
, C A
W is co ns in A ve nu e W hi te fis h, M T
6.
2.
RDG-20-087
TF
PE
R M
IT
R
EV
IE
W
SW
/1
8/
N
W
E
S
HORIZ 1" = 20'
VERT 1" = 20'
PROPOSED MULTI-PLATE ARCH PROFILE2
1" = 20'
PROPOSED MULTI-PLATE ARCH
PLAN VIEW1
KELLY GULCHflow
1' EXISTING
CONTOURS
DESIGN
ALIGNMENT
KELL
Y G
ULC
H R
OAD
EXISTING
CHANNEL
PROFILE
13.2
PROPOSED ROAD SURFACE,
SEE DRAWING 4.0
PROPOSED OPEN
BOTTOM ARCH CULVERT
PROPOSED 1'
CONTOURS
PROPOSED MULTI-PLATE
ARCH CULVERT, SEE
DETAILS SHEET 3.1
SIMULATED
STREAMBED
DESIGN
SURFACE
GENERAL NOTES
CONTRACTOR SHALL SUBMIT A DEWATERING AND ISOLATION (STREAM BYPASS) PLAN FOR
APPROVAL PRIOR TO BEGINNING CONSTRUCTION. WORK AREA ISOLATION TO COMPLY
WITH PROVISIONS ON DWG 5.0 AND 5.1.
REINFORCED CONCRETE FOOTINGS ARE DESIGNED BY PIPE SUPPLIER AS PART OF
SERVICES PERTAINING TO SUPPLY OF PIPE MATERIALS, DESIGN LOADS AND BEARING
ESTIMATE THIS SHEET. CONTRACTOR TO SUBMIT FOOTING DESIGN PRIOR TO
CONSTRUCTION MOBILIZATION. MINIMUM FOOTING DEPTH SPECIFIED ON DWG 3.1 AND 3.2
MUST BE MET FOR SCOUR PROTECTION.
BEARING CAPACITY OF FOUNDATION SOILS TO BE CONFIRMED BY FIELD ENGINEER
DURING CONSTRUCTION.
CONSTRUCTION NOTES
REMOVE EXISTING CORRUGATED PIPES AND DISPOSE OF OFF-SITE AT A LEGAL
DUMPING SITE.
INSTALL 15' SPAN x 6' - 7" RISE MULTI-PLATE ARCH, 60 FT LONG, PRECAST CONCRETE
FOOTINGS, SIMULATED STREAMBED PER DRAWINGS 3.0-3.2
CONTRACTOR TO SUPPLY PRECAST FOOTINGS, DIMENSIONS THESE DRAWINGS, TO
ANTICIPATED LOADS AND DRAWINGS THIS SHEET. CONTRACTOR SHALL SUBMIT
FOOTING DESIGN AND DRAWINGS TO ENGINEER PRIOR TO CONSTRUCTION.
PRESERVE AND PROTECT EXISTING TREES AROUND THE SITE TO THE MAXIMUM
EXTENT POSSIBLE.
INLET / OUTLET PROTECTION CONSISTS OF 3' THICK LAYER OF CLASS 3 (FP-14)
RIPRAP PROJECTING APPROXIMATELY 12' AROUND CULVERT ENDS ALONG ROAD FILL
SLOPES (50 CUBIC YARDS EACH END). INTENT OF INLET/OUTLET PROTECTION IS TO
PREVENT SCOUR OF ROAD FILL AT HIGH FLOWS AND GENERAL SLOPE STABILITY OF
ROAD FILL.
ROAD REHABILITATION AND SURFACING PER DRAWING 4.0.
1 2
4 5
1.5
1.5
EDGE OF
EXISTING ROAD
MULTI-PLATE ARCH AND ALL CONNECTIONS/FASTENERS SHALL BE INSTALLED IN
ACCORDANCE WITH THE DESIGN SPECIFICATIONS AND CURRENT AASHTO
STANDARD SPECIFICATIONS FOR HIGHWAY BRIDGES. THE FOLLOWING CRITERIA
MUST BE INCORPORATED INTO THE DESIGN FOR THE MULTI-PLATE ARCH AND
CONNECTIONS/FASTENERS:
DESIGN LOAD HL-93
SPAN 15 FT
RISE 6 FT -7 IN
CLEAR ROADWAY WIDTH 14 FT
NOMINAL BEARING CAPACITY 3,500 PSF
FOOTING LOADS FROM ARCH:
HORIZONTAL 3.8 KIPS/FT
VERTICAL 2.1 KIPS/FT
MULTI-PLATE ARCH SPECIFICATIONS
EXISTING EMBANKMENT, ROADBED, AND CHANNEL 625 CUBIC YARDS
DISPOSAL 325 CUBIC YARDS
EXCAVATED MATERIALS
SITE EXCAVATION
EST. VOLUME
*NOTE: ESTIMATED VOLUMES ARE "NEAT LINE" ESTIMATES
OHW
ORDINARY HIGH
WATER (OHW)
ORDINARY HIGH
WATER (OHW)
DESIGN SLOPE = ~0.1162 FT/FT
SPECIFIED TOP
FOOTING ELEVATION
DESIGNATED GRADATION OF
STREAMBED SIMULATION ROCK
4'
2'
10' WIDE LOW FLOW CHANNEL
±1 DEEP
3'
DESIGN FLOWLINE
PER PROFILE
0+20 0+30 0+40 0+50 0+60 0+70 0+80 0+90 1+00 1+10
R O
C K
R
IB
ST
A
0+
, E
LE
V
.5
R O
C K
R
IB
ST
A
0+
, E
LE
V
.5
R O
C K
R
IB
ST
A
1+
, E
LE
V
.2
R O
C K
R
IB
ST
A
0+
, E
LE
V
.8
R O
C K
R
IB
ST
A
0+
, E
LE
V
.0
R O
C K
R
IB
ST
A
0+
, E
LE
V
.3R O
C K
R
IB
ST
A
0+
, E
LE
V
.8
SLOPE = -0.1162 FT/FT
SPECIFIED TOP
FOOTING ELEVATION
DESIGNATED GRADATION OF
STREAMBED SIMULATION ROCK
4'
2'
2' - 3' DIA.
CAP BOULDER 10' WIDE LOW FLOW CHANNEL
±1 DEEP
DESIGN FLOWLINE
PER PROFILE
2561256225632564
DRAWING NUMBER
PROJECT NUMBER
N O
D A T E
B Y
D E S C R
IP
T
IO
N
C H K
SW
J ef fe rs on
A ve nu e
C or va llis
, O R
1.
8.
3.1 Drawing of6 10
M U
LT
I-
P
LA
T E
A R
C H
A N
D S
T R
E A
M B
E D
D E
T A
IL
S
KE
LL
Y G
U
LC
H C
U
LV
ER
T
R
EP
LA
C
EM
EN
T
SA
W
YE
R S
BA
R
, C A
W is co ns in A ve nu e W hi te fis h, M T
6.
2.
RDG-20-087
TF
PE
R M
IT
R
EV
IE
W
SW
/1
8/
N
W
E
S
KELLY GULCHflow
1' EXISTING
CONTOURS
DESIGN
ALIGNMENT
PARTICLE SIZE
DISTRIBUTION
MATRIX TABLE
D D D D
ROCK SIZE
(INCHES)
STREAMBED
ESTIMATED STREAMBED MATRIX
- 95 CUBIC YARDS
SCHEDULE
BOULDER
2'-3' 42 3'-4' 42
TOTAL BOULDERS - 84
BOULDERS QUANTITY
THE DESIGN INTENT IS TO MIMIC THE NATURAL STREAMBED BY SIMULATING IT THROUGH
THE CULVERT. THIS IS ACCOMPLISHED BY COUNTERSINKING AND PLACING THE SPECIFIED
ROCK/SEDIMENT IN THE MULTI-PLATE ARCH.
STREAMBED SIMULATION GRAVEL SHALL CONFORM TO THE ROCK GRADATION SPECIFIED.
GRAVELS MUST BE CLEAN MATERIALS FREE OF FINES.
GRAVELS SHALL BE THOROUGHLY MIXED AND PLACED IN THE MULTI-PLATE ARCH TO THE
DEPTH SPECIFIED. IN ADDITION, PLACE THIRTY 2'-3' PARTIALLY-BURIED OVER-SIZED ROCKS
NEAR THE SURFACE OF THE GRAVEL (50% BURIED) FOR HYDRAULIC SHADOW AREA.
AFTER GRAVEL IS IN PLACE, THE SURFACE SHALL BE WASHED WITH WATER TO ALLOW THE
FINES TO WORK INTO OPEN SPACES AND SEAL THE GRAVEL SUBSTRATE. SAND SHALL BE
ADDED UNTIL THE GRAVEL IS "SEALED" AND WASH WATER FLOWS ON TOP OF THE
GRAVELS.
AFTER GRAVEL PLACEMENT, CONTINUE "WASHING" SAND INTO ROCK UNTIL VOIDS IN ROCK
MATRIX ARE COMPLETELY FILLED WITH SAND AND WATER FLOWS OVER THE SURFACE OF
THE STREAMBED.
flow
1 STREAMBED LAYOUT
1" = 20'
3 TYPICAL ROCK RIB SECTION
HORIZ 1" = 5'
VERT 1" = 5'
4 TYPICAL STREAMBED SECTION
HORIZ 1" = 5'
VERT 1" = 5'
2 TYPICAL ROCK RIB SECTION
HORIZ 1" = 20'
VERT 1" = 20'
5 TYPICAL ROCK RIB PROFILE
HORIZ 1" = 5'
VERT 1" = 5'
LOW FLOW CHANNEL INVERT
CONCRETE FOOTING
2'-3' DIA. FOOTER
BOULDER
2'-3' DIA. CAP
BOULDER
STREAMBED SIMULATION BACKFILL
INSIDE MULTI-PLATE ARCH
ROCK RIB, TYP
LOW FLOW
CHANNEL
PROPOSED
MULTI-PLATE ARCH
PROPOSED 1'
CONTOURS
2'-3' DIA. FOOTER
BOULDER
PROPOSED ROAD SURFACE,
SEE DRAWING 4.0
OHW
EXISTING
GROUND
BEARING PAD PER DWG 3.2
BEARING PAD PER DWG 3.2
STREAMBED
MATRIX
HABITAT BOULDERS
2'-3' DIA. APPROX. 1' ABOVE
SURFACE OF STREAMBED
smarano Text Box
3-4' DIA. CAP BOULDER
0+250+300+350+400+450+500+550+600+650+700+75
OHW
DRAWING NUMBER
PROJECT NUMBER
N O
D A T E
B Y
D E S C R
IP
T
IO
N
C H K
SW
J ef fe rs on
A ve nu e
C or va llis
, O R
1.
8.
3.2 Drawing of7 10
P R
O P
O S
E D
M U
LT
I-
P
LA
T E
A R
C H
C R
O S
S S
E C
T
IO
N S
KE
LL
Y G
U
LC
H C
U
LV
ER
T
R
EP
LA
C
EM
EN
T
SA
W
YE
R S
BA
R
, C A
W is co ns in A ve nu e W hi te fis h, M T
6.
2.
RDG-20-087
TF
PE
R M
IT
R
EV
IE
W
SW
/1
8/
HORIZ 1" = 5'
VERT 1" = 5'
PROPOSED MULTI-PLATE ARCH SECTION1
EXISTING ROAD
SURFACE
PROPOSED ROAD SURFACE
PER DRAWING 4.0.
15" LAYER OF 3" INCH MINUS CRUSHED
AGGREGATE. PLACE IN LIFTS AND
COMPACTED T0 90% RELATIVE DENSITY
2' X 4' PRECAST
CONCRETE FOOTINGS
STEEL MULTI-PLATE ARCH
15' SPAN x 6'-7" RISE x 60' LENGTH
STRUCTURAL BACKFILL
PER CONSTRUCTION NOTE 9 AND
STRUCTURAL BACKFILL
PROCEDURE NOTE THIS SHEET
SIMULATED STREAMBED MATRIX,
36" THICKNESS, MINIMUM 6"
COVER AT FOOTINGS
NATIVE BACKFILL
FROM INITIAL
EXCAVATION
CONSTRUCTION NOTES
STRUCTURAL BACKFILL MATERIAL SHOULD BE PLACED IN
HORIZONTAL UNIFORM LAYERS NOT EXCEEDING 8 INCHES
THICK BEFORE COMPACTION AND SHOULD BE PLACED
UNIFORMLY ON BOTH SIDES OF THE STRUCTURE. EACH LAYER
SHOULD BE COMPACTED TO 95% STANDARD PROCTOR.
PREVENT EXCESSIVE DISTORTION OF STRUCTURE DURING
BACKFILL BY VARYING COMPACTION METHODS AND
EQUIPMENT.
EXCAVATE CROSSING TO LINES AND GRADES SHEET 3.0 AND 3.1.
SLOPE TRENCH PER OSHA REQUIREMENTS.
PLACE GEOTEXTILE SEPARATION FABRIC BETWEEN EXPOSED
FOUNDATION MATERIAL AND BEARING PAD. USE NON-WOVEN
NEEDLE PUNCHED FABRIC, 8 OZ PER SQUARE YARD, AOS 70,
PERMITTIVITY 0.01
BEARING PAD SUBGRADE SHALL BE 3" MINUS CRUSHED ROCK
PLACED IN 6 INCH LIFTS AND COMPACTED TO A MINIMUM OF 90%
RELATIVE DENSITY PER AASHTO T-99. VOLUMES PER TABLE THIS
SHEET.
BEARING PAD CAP GRAVEL SHALL BE 3/4" MINUS CRUSHED ROCK
PLACED TO A 90% RELATIVE DENSITY COMPACTED THICKNESS OF
3". TOP SURFACE OF SUBGRADE TO BE SMOOTHLY GRADED TO
SUPPORT FOOTINGS. TOP SURFACE OF BEARING PAD TO MEET
ELEVATIONS SHOWN PROFILE THIS SHEET AND SHEET 3.0 DETAIL 1.
PLACE PRECAST FOOTINGS PER TECHNICAL SPECIFICATION 02631
AND MANUFACTURER'S RECOMMENDATIONS FOR PLACEMENT AND
HANDLING.
PLACE STREAMBED MATRIX TO CONSTRUCT SIMULATED
STREAMBED. WASH IN FINE SAND AND GRAVEL TO SEAL
SIMULATED STREAMBED. CONSTRUCT STREAMBED ACCORDING
TO NOTE AND GRADATION SHEET 3.1.
CONSTRUCT MULTI-PLATE ARCH PER THESE PLANS AND
MANUFACTURER'S INSTRUCTIONS.
ENSURE MINIMUM COVER OVER FOOTINGS OF 6".
PLACE STRUCTURAL BACKFILL WITHIN 3 FEET HORIZONTALLY AND
1 FT VERTICALLY OF ARCH, AND PER BACKFILL NOTE THIS SHEET.
STRUCTURAL BACKFILL TO BE GRANULAR, WELL-GRADED SAND
AND GRAVEL. STRUCTURAL BACKFILL MATERIAL SHOULD
CONFORM TO ONE OF THE SOIL CLASSIFICATIONS FROM AASHTO
SPECIFICATION M-145 MEETING THE REQUIREMENTS OF A-1, A-2,
OR A-3, AND FP.14 704.04. VOLUMES PER TABLE THIS SHEET.
COMPACT TO 90% RELATIVE DENSITY.
PLACE NATIVE BACKFILL MATERIAL OUTSIDE OF STRUCTURAL
BACKFILL ZONE TO LINES AND GRADES THIS SHEET. NATIVE
MATERIAL EXCAVATED DURING CULVERT REMOVAL MAY BE USED
PROVIDED IT MEETS AASHTO SPECIFICATIONS FOR A-1, A-2, OR
A-3. COMPACT TO 90% DENSITY. VOLUMES PER TABLE THIS SHEET.
REHABILITATE ROAD SURFACE PER LINES AND GRADES ON SHEET
4.0.
STRUCTURAL BACKFILL
PROCEDURE
3 3
5 5
3/4" MINUS 16
PAD CAP GRAVEL &
ROAD SURFACE
GRADATION
MINIMUM
VOLUME (CY)
3" MINUS 30
PAD SUBGRADE
MATERIAL
GRADATION
MINIMUM
VOLUME (CY)
3" THICK COMPACTED
3/4" MINUS CRUSHED ROCK
GEOTEXTILE FABRIC2
--- 135
STRUCTURAL
BACKFILL
GRADATION
MINIMUM
VOLUME (CY)
--- 300
NATIVE
BACKFILL
GRADATION
EST.
VOLUME (CY)
SEE DWG 3.1 95
STREAMBED
MATRIX
GRADATION
MINIMUM
VOLUME (CY)
1+00
1+20
0+50
1+00
1+20 0+00
0+50
2+00
2+31
0+80 0+90 1+00 1+10 1+20 1+30
M
AT
C H
E
XI
ST
IN
G R
O
AD
ST
A
0+
, E
LE
V
.6
M
AT
C H
E
XI
ST
IN
G R
O
AD
ST
A
1+
, E
LE
V
.1
6.0 6.0
GEOTEXTILE FABRIC
SURFACE COURSE,
3" OF 3/4" MINUS
BASE COURSE,
6" OF 3" MINUS
2% SLOPE2% SLOPE
ARMOR CATCH SLOPES WITH
CLASS 3 RIPRAP PER FP-14, TYP
DRAWING NUMBER
PROJECT NUMBER
N O
D A T E
B Y
D E S C R
IP
T
IO
N
C H K
SW
J ef fe rs on
A ve nu e
C or va llis
, O R
1.
8.
4.0 Drawing of8 10
W is co ns in A ve nu e W hi te fis h, M T
6.
2.
RDG-20-087
TF
PE
R M
IT
R
EV
IE
W
SW
/1
8/
N
W
E
S
1" = 20'
ROAD REHABILITATION PLAN VIEW1
DESIGN CHANNEL
ALIGNMENT
DESIGN ROAD
ALIGNMENT
2 DESIGN ROAD PROFILE
HORIZ 1" = 20'
VERT 1" = 20'
3 TYPICAL ROAD SECTION
HORIZ 1" = 5'
VERT 1" = 5'
DESIGN ROAD
PROFILE
CONSTRUCTION NOTES
REHABILITATE ROAD PER PLAN AND PROFILE THIS SHEET, TYPICAL ROAD
SECTION DETAILS THIS SHEET
ENGINEER TO INSPECT SUBGRADE PRIOR TO PLACEMENT OF GEOTEXTILE
FABRIC AND ROCK
PLACE GEOTEXTILE SEPARATION FABRIC BETWEEN FOUNDATION MATERIAL
AND BASE COURSE. USE NON-WOVEN NEEDLE PUNCHED FABRIC, 8 OZ PER
SQUARE YARD, AOS 70, PERMITTIVITY 0.01
PLACE ROAD SURFACING AGGREGATE TO DESIGNATED THICKNESS IN LIFTS
NOT EXCEEDING 6 INCHES. COMPACT ROCK TO 90% RELATIVE DENSITY USING
VIBRATORY COMPACTOR
ROAD REHABILITATION
ESTIMATED QUANTITIES
NEAT LINE VOLUME
BASE COURSE 8 CUBIC YARDS
SURFACE COURSE 4 CUBIC YARDS
GEOTEXTILE 45 SQ. YARDS
R O
A D
R E
H A
B
IL
IT
A
T
IO
N
KE
LL
Y
G U
LC
H
C U
LV
ER
T R
EP
LA
C
EM
EN
T
SA
W
YE
R
S
BA
R , C
A
3 DESIGN TOP OF
BANK TO MATCH
PRE-CONSTRUCTION
TOP OF BANK
1.5
1.5
VARIES
DESIGN TOP OF
BANK TO MATCH
PRE-CONSTRUCTION
TOP OF BANK
DESIGN
SURFACE
AutoCAD SHX Text
DRAWING NUMBER
PROJECT NUMBER
N O
D A T E
B Y
D E S C R
IP
T
IO
N
C H K
SW
J ef fe rs on
A ve nu e
C or va llis
, O R
1.
8.
5.0 Drawing of9 10
E R
O S
IO
N
C O
N T
R O
L, A
C C
E S
S , A
N D
S T
A G
IN
G
KE
LL
Y G
U
LC
H C
U
LV
ER
T
R
EP
LA
C
EM
EN
T
SA
W
YE
R S
BA
R
, C A
W is co ns in A ve nu e W hi te fis h, M T
6.
2.
RDG-20-087
TF
PE
R M
IT
R
EV
IE
W
SW
/1
8/
N
W
E
S1" = 20'
EROSION CONTROL, ACCESS,
STAGING1
1' EXISTING
CONTOURS
KE
LL
Y G
U
LC
H R
O
AD
VEGETATION WITHIN THE CONSTRUCTION SITE SHALL BE PRESERVED AND PROTECTED TO THE
FULLEST EXTENT PRACTICAL. VEGETATION TO BE REMOVED WILL BE CLEARLY MARKED WITH
RIBBON OR FLAGGING.
CONTRACTOR TO SUBMIT EROSION CONTROL PLAN TO PROJECT ENGINEER FOR APPROVAL PRIOR
TO COMMENCING CONSTRUCTION. AT A MINIMUM, EROSION CONTROL MEASURES SHOWN ON THIS
PLAN SHALL BE INCORPORATED INTO PLAN AND SHALL BE INSPECTED WEEKLY BY PROJECT
ENGINEER. BASED ON INSPECTIONS, WORK CREWS SHALL MOBILIZE IMMEDIATELY TO MAKE
REPAIRS OR INSTALL ADDITIONAL MEASURES, IF NECESSARY.
CONTRACTOR SHALL PREPARE AND HAVE ON-SITE A SPILL CONTAINMENT AND CONTROL PLAN
WITH NOTIFICATION PROCEDURES, SPECIFIC CLEANUP AND DISPOSAL INSTRUCTIONS FOR ALL
PRODUCTS USED ON-SITE. THE PLAN MUST INCLUDE 24-HOUR EMERGENCY CONTACT NUMBERS
FOR THE CONTRACTOR.
CONTRACTOR SHALL HAVE AN EMERGENCY SUPPLY OF SEDIMENT CONTROL MATERIALS ON HAND
(SILT FENCE, STRAW BALES, WATTLES, ETC.), AN OIL ABSORBING FLOATING BOOM, AND A SPILL KIT.
EXCAVATED AREAS SHALL BE PROTECTED FROM EROSION BY PLACING A PROTECTIVE COVER
OVER THE MATERIAL (SUCH AS PLASTIC) AND PROVIDING STRAW MULCH OVER EXCAVATED SLOPES
AND DISTURBED AREAS. HAY BALES SHALL BE PLACED DOWNSTREAM OF WORK AREA IN THE
STREAM TO REDUCE TURBIDITY.
CONTRACTOR SHALL PROVIDE MEASURES TO PREVENT CONSTRUCTION VEHICLES FROM TRACKING
SEDIMENT OFFSITE OR ONTO ROADWAYS WHERE IT IS SUBJECT TO WASHING INTO STORM DRAINS, WATERWAYS, OR WETLANDS; INCLUDING GRAVEL ACCESS PADS, WHEEL WASH STATIONS, OR
OTHER EQUALLY EFFECTIVE METHODS.
DUST CONTROL: ALL HEAVY USE AREAS ARE TO BE MAINTAINED IN A CONDITION THAT MINIMIZES DUST ON THE PROJECT SITE AND THE CONTRACTOR SHALL HAVE ACCESS TO A WATER TRUCK FOR
DUST MANAGEMENT IF REQUIRED. THE PROJECT INSPECTOR WILL NOTIFY THE CONTRACTOR TO
MOBILIZE DUST CONTROL ACTIVITIES (INCLUDING WATERING) IF CONDITIONS REQUIRE.
ALL EQUIPMENT TO REMAIN WITHIN THE BOUNDS OF THE CONSTRUCTION AREA.
EROSION CONTROL NOTES
UTILIZE THE EXISTING ROAD AND IMMEDIATE VICINITY TO THE EXTENT POSSIBLE FOR MATERIAL
STOCKPILING AND STAGING.
ANY AREAS OFF OF ROADWAY THAT AREA DISTURBED DUE TO STOCKPILING AND STAGING MUST BE
RESTORED TO PRE- PROJECT CONDITION, SEE EROSION CONTROL NOTES BELOW.
ROAD CLOSURE DURING CONSTRUCTION TO BE COORDINATED WITH USFS PRIOR TO MOBILIZATION.
CONTRACTOR TO SUPPLY TWO ROAD CLOSED SIGNS.
STAGING
SITE RESTORATION NOTES
ALL DAMAGED OR DISTURBED STREAMBANKS ARE TO BE RESTORED TO A NATURAL SLOPE
PATTERN AND PROFILE SUITABLE FOR ESTABLISHMENT OF PERMANENT WOODY VEGETATION.
TEMPORARY ACCESS ROUTES AND OTHER AREAS DISTURBED DURING CONSTRUCTION WILL BE
REHABILITATED TO SIMILAR OR BETTER THAN PRE-WORK CONDITIONS. AT A MINIMUM SITE
RECLAMATION ACTIVITIES SHALL RESULT IN PLANT DISTRIBUTION AND DENSITY THAT MATCH
PRE-PROJECT CONDITIONS.
SHORT-TERM STABILIZATION MEASURES WILL BE IMPLEMENTED UNTIL PERMANENT EROSION
CONTROL MEASURES (PLANT RESTORATION) ARE EFFECTIVE.
EROSION CONTROL SEEDING
ALL DISTURBED AREAS SHALL BE BROADCAST SEEDED WITH AN “EROSION CONTROL” SEED MIX.
SEED MIX COMPOSITION TO BE SUBMITTED TO PROJECT ENGINEER FOR REVIEW PRIOR TO
APPLICATION. THE MIX SHALL CONSIST OF A 3 TO 1 MIX (BY WEIGHT) OF CEREAL RYE (e.g. SECALE CEREALE) AND "TUFTED HAIRGRASS" OR APPROVED EQUAL BASED ON SEED AVAILABILITY. THE MINIMUM APPLICATION RATE SHALL BE 30 POUNDS PER ACRE. AFTER BROADCAST SEEDING, RAKE
IN AND COVER THE AREA WITH STERILE, CERTIFIED WEED-FREE, STRAW.
EQUIPMENT MAINTENANCE AND
EQUIPMENT TO BE STAGED MIN.
150' FROM STREAM
EXISTING ROAD
MATERIALS STOCKPILE AREA
(USE EXISTING ROAD)
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X X
X
X
X
X
X
X X
X X
X
X X
X
SILT FENCE, SEE DETAIL 3
ON DRAWING 5.1
SILT FENCE, SEE DETAIL 3
ON DRAWING 5.1
MATERIALS STOCKPILE
AND STAGING AREA
(TO BE FLAGGED PRIOR
TO MOBILIZATION)
flow
KELLY GULCH
WORK AREA ISOLATION AND
STREAM BYPASS PER DWG 5.1
DRAWING NUMBER
PROJECT NUMBER
N O
D A T E
B Y
D E S C R
IP
T
IO
N
C H K
SW
J ef fe rs on
A ve nu e
C or va llis
, O R
1.
8.
5.1
RDG-20-087
Drawing of10 10
W is co ns in A ve nu e W hi te fis h, M T
6.
2.
TF
PE
R M
IT
R
EV
IE
W
SW
/1
8/
W
O R
K A
R E
A I
S O
LA
T
IO
N
KE
LL
Y G
U
LC
H C
U
LV
ER
T
R
EP
LA
C
EM
EN
T
SA
W
YE
R S
BA
R
, C A
2 SUMP - TYPICAL
PERFORATIONS
HDPE PIPE
1 TYPICAL WORK AREA ISOLATION / STREAM BYPASS
NOT TO SCALE
THE WATER PUMP SHALL BE A 3"-DIAMETER GASOLINE-ENGINE WATER PUMP CAPABLE OF
PASSING SOLIDS UP TO 1-1/16 INCH DIAMETER, 320 GAL./MIN CAPACITY, 89 FT TOTAL DYNAMIC HEAD, 26 FT SUCTION LIFT. PUMP SUCTION INTAKE SHALL BE SCREENED WITH 3"-STRAINER.
PLACE STRAINER IN "SUMP" CONSTRUCTED FROM PERFORATED HDPE PIPE.
INSTALL SUMP IN LOWEST PORTION OF DE-WATERED WORK AREA, AND GRADE WORK AREA TO
DRAIN TO SUMP.
PLACE PUMP DISCHARGE ON GRASSED PORTION OF FLOODPLAIN SO THAT DISCHARGED WATER
IS FILTERED THOUGH GRASS.
TRASH PUMP NOTES (IF NECESSARY)
WORK AREA ISOLATION
CONTRACTOR SHALL SUBMIT A DEWATERING AND WORK AREA ISOLATION (STREAM BYPASS) PLAN
THAT LIMITS DEWATERED STREAM LENGTH TO PROJECT ENGINEER FOR APPROVAL PRIOR TO
BEGINNING CONSTRUCTION. IT IS ANTICIPATED THAT THE WORK AREA WILL BE DRY DURING
CONSTRUCTION.
THE PREFERRED WORK AREA ISOLATION TECHNIQUE SHALL INCORPORATE GRAVITY DEWATERING
TECHNIQUES AS MUCH AS POSSIBLE. PREFERABLY A FORM OF COFFER DAM AND BY-PASS PIPE.
DISSIPATE FLOW ENERGY AT OUTLET TO PROVIDE SAFE DOWNSTREAM REENTRY FOR FISH,
PREFERABLY INTO POOL HABITAT WITH COVER.
STATIONARY POWER EQUIPMENT, SUCH AS GENERATORS, WITHIN 150-FEET OF THE WATER SHALL
BE DIAPERED TO PREVENT LEAKS.
ALL POWER EQUIPMENT WITHIN 150-FEET OF THE WATER SHALL BE INSPECTED DAILY FOR FLUID LEAKS AND REPAIRED, PRIOR TO USE WITHIN 150-FEET, IF A LEAK IS DETECTED. THE CONTRACTOR
MUST KEEP DAILY INSPECTION REPORTS IN A DIARY.
PUMPS USED FOR DEWATERING SHALL HAVE INTAKE SCREENS THAT MEET THE MOST CURRENT
VERSION OF NMFS' AND OFDW' FISH SCREEN CRITERIA OR BE OPERATED IN AN AREA WHERE FISH
ARE NOT ABLE TO ENTER.
AT COMPLETION OF PROJECT RE-WATER THE CONSTRUCTION SITE SLOWLY TO PREVENT LOSS OF
SURFACE FLOW DOWNSTREAM, AND TO PREVENT RELEASE OF SUSPENDED SEDIMENT.
3 TYPICAL SILT FENCE INSTALLATION
PROFILE
6' MAXIMUM SPACING
FRONT VIEW
NTS
NTS
NTS
PLAN VIEW
NOTES:
1. BURY BOTTOM OF FILTER FABRIC 6"VERTICALLY BELOW FINISHED GRADE.
2. 2"x 2" FIR, PINE OR STEEL FENCE POSTS.
3. POSTS TO BE INSTALLED ON UPHILL SIDE OF SLOPE.
4. COMPACT BOTH SIDES OF FILTER FABRIC TRENCH.
5. PANELS MUST BE PLACED ACCORDING TO SPACING ON DETAIL NO.940
2' -6
4' -0
"6"
3' MINIMUM
FROM TOE SLOPE
USE STITCHED LOOPS
OVER 2"x 2" POSTS
INTERLOCKED 2"x 2"
POSTS AND ATTACH
ANGLE FILTER FABRIC FENCE
TO ASSURE SOIL IS TRAPPED
4' -0
" 2' -6
1'
-6
6"
FILTER FABRIC MATERIAL
36" WIDE ROLLS
CONTRACTOR SHALL COORDINATE WITH U.S. FOREST SERVICE (U.S.F.S) TO REMOVE EXISTING FISH AT THE PROJECT SITE PRIOR TO ISOLATION AND DEWATERING THE AREA. FISH SALVAGE TO
BE CONDUCTED BY TRAINED FISHERIES BIOLOGISTS AND PER ODFW AND NOAA RULES. IF
POSSIBLE ALLOW FISH SPECIES TO MIGRATE OUT OF WORK AREA. IF NECESSARY, A BACKPACK
ELECTROSHOCKER OR SEINE NET (MADE FROM 9.5 MM STRETCHED NYLON MESH) MAY BE USED
TO REMOVE FISH FROM THE ISOLATED WORK AREA.
IN COFFERDAM WORK AREAS AND OTHER ISOLATED AREAS, WATER WILL BE DRAWN DOWN TO
HELP CONSOLIDATE FISH AND IMPROVE SALVAGE EFFORTS. REDUCING WATER VOLUME WILL BE
THE RESPONSIBILITY OF THE CONTRACTOR AND SHALL BE DONE USING PUMPS FITTED WITH
APPROVED FISH SCREENS THAT PREVENT IMPINGEMENT OR ENTRAINMENT OF FISH.
WATER WILL BE DRAWN DOWN IN A CONTROLLED MANNER WITH FISH SALVAGE CREWS
CONTINUOUSLY MONITORING THE PUMPS, NEWLY EXPOSED AREAS, AND FISH NUMBERS FOR
CROWDING. IF ISOLATED POCKETS OR POOLS OCCUR, THEY WILL BE DEFISHED AND PUMPING
WILL BE REDUCED ONCE MANAGEABLE WATER LEVELS ARE OBTAINED.
FOR THE PERIOD BETWEEN CAPTURE AND RELEASE, ALL CAPTURED AQUATIC LIFE WILL BE
IMMEDIATELY PUT INTO DARK COLORED FIVE GALLON BUCKETS FILLED WITH CLEAN RIVER
WATER. FISH SPECIES AND LIFE STAGE WILL BE DOCUMENTED AND FISH WILL BE RELEASED IN A
SAFE ENVIRONMENT IN THE STREAM.
GENERAL FISH SALVAGE NOTES
THE WATER PUMP SHALL BE A 3"-DIAMETER GASOLINE-ENGINE WATER PUMP CAPABLE OF
PASSING SOLIDS UP TO 1-1/16 INCH DIAMETER, 320 GAL./MIN CAPACITY, 89 FT TOTAL DYNAMIC HEAD, 26 FT SUCTION LIFT. PUMP SUCTION INTAKE SHALL BE SCREENED WITH 3"-STRAINER.
PLACE STRAINER IN "SUMP" CONSTRUCTED FROM PERFORATED HDPE PIPE.
INSTALL SUMP IN LOWEST PORTION OF DE-WATERED WORK AREA, AND GRADE WORK AREA TO
DRAIN TO SUMP.
PLACE PUMP DISCHARGE ON GRASSED PORTION OF FLOODPLAIN SO THAT DISCHARGED WATER
IS FILTERED THOUGH GRASS.
TRASH PUMP NOTES (IF NECESSARY)
WORK AREA ISOLATION
CONTRACTOR SHALL SUBMIT A DEWATERING AND WORK AREA ISOLATION (STREAM BYPASS) PLAN
THAT LIMITS DEWATERED STREAM LENGTH TO PROJECT ENGINEER FOR APPROVAL PRIOR TO
BEGINNING CONSTRUCTION. IT IS ANTICIPATED THAT THE WORK AREA WILL BE DRY DURING
CONSTRUCTION.
THE PREFERRED WORK AREA ISOLATION TECHNIQUE SHALL INCORPORATE GRAVITY DEWATERING
TECHNIQUES AS MUCH AS POSSIBLE. PREFERABLY A FORM OF COFFER DAM AND BY-PASS PIPE.
DISSIPATE FLOW ENERGY AT OUTLET TO PROVIDE SAFE DOWNSTREAM REENTRY FOR FISH,
PREFERABLY INTO POOL HABITAT WITH COVER.
STATIONARY POWER EQUIPMENT, SUCH AS GENERATORS, WITHIN 150-FEET OF THE WATER SHALL
BE DIAPERED TO PREVENT LEAKS.
ALL POWER EQUIPMENT WITHIN 150-FEET OF THE WATER SHALL BE INSPECTED DAILY FOR FLUID LEAKS AND REPAIRED, PRIOR TO USE WITHIN 150-FEET, IF A LEAK IS DETECTED. THE CONTRACTOR
MUST KEEP DAILY INSPECTION REPORTS IN A DIARY.
PUMPS USED FOR DEWATERING SHALL HAVE INTAKE SCREENS THAT MEET THE MOST CURRENT
VERSION OF NMFS' AND OFDW' FISH SCREEN CRITERIA OR BE OPERATED IN AN AREA WHERE FISH
ARE NOT ABLE TO ENTER.
AT COMPLETION OF PROJECT RE-WATER THE CONSTRUCTION SITE SLOWLY TO PREVENT LOSS OF
SURFACE FLOW DOWNSTREAM, AND TO PREVENT RELEASE OF SUSPENDED SEDIMENT.
2 SUMP - TYPICAL
PERFORATIONS
HDPE PIPE
EXISTING
ROAD
OUTLET CLEAN WATER
DOWNSTREAM
OF WORK AREA
WORK AREA TO BE ISOLATED FROM
MOVING WATER TO MINIMIZE SEDIMENT
INPUTS INTO STREAM
PUMP TURBID WATER FROM
WORK AREA ONTO FLOODPLAIN
AWAY FROM CHANNEL
INSTALL STRAW BALE SEDIMENT DAM
DOWNSTREAM FROM WORK AREA
SAND BAGS OR SIMILAR TEMPORARY
STREAM ISOLATION SYSTEM
SUMP TO COLLECT TURBID
WATER IN WORK AREA
STREAM TO BYPASS WORK AREA
USING TEMPORARY DIVERSION,
GRAVITY PIPE SYSTEM PREFERRED
SAND BAGS OR SIMILAR TEMPORARY
STREAM ISOLATION SYSTEM
INTAKE SCREENED PER ODFW
AND NMFS SCREEN CRITERIA
PROJECT AREA
AutoCAD SHX Text P
AutoCAD SHX Text L
| Sheets and Views |
| 1.0 COVER SHEET AND NOTES |
| 2.0 EXISTING CONDITIONS |
| 2.1 EXISTING CROSS SECTIONS |
| 2.2 EXISTING CROSS SECTIONS |
| 3.0 PROPOSED MULTI-PLATE ARCH LAYOUT |
| 3.1 MULTI-PLATE ARCH AND STREAMBED DETAILS |
| 3.2 PROPOSED MULTI-PLATE ARCH CROSS SECTIONS |
| 4.0 ROAD REHABILITATION |
| 5.0 EROSION CONTROL, ACCESS, AND STAGING |
| 5.1 WORK AREA ISOLATION |
| 2024-04-23T07:38:10-0700 | |
| CHRISTOPHER BIELECKI |
| 2024-04-29T12:44:19-0700 | |
| DANIKA CARLSON |
File details come from the government source that posted it. Updated .