127EAW23R0015 Amendment 1.pdf

PDF 188 KB Posted

Attached to
GAOA Bayview Parking Lot Upgrades
Solicitation number
127EAW23R0015
Issued by

About this file

This amendment to solicitation 127EAW23R0015 provides additional details for upgrading the parking lot at GAOA Bayview Park. The solicitation, issued by the Department of Agriculture Forest Service, is a total small business set-aside for repaving and restriping the parking lot, installing ADA-compliant signage and parking spaces, and repairing fencing and lighting. Responses are due by the amended date of April 15, 2023, with work to be completed by September 30, 2023. Pricing will be evaluated for a firm fixed-price contract awarded to the responsible offeror with the lowest price.

View the file

Other files

File Type Posted
Terrain Photo (21).jpeg JPEG file
Terrain Photo (9).jpeg JPEG file
Terrain Photo (10).jpeg JPEG file
Terrain Photo (29).jpeg JPEG file
Terrain Photo (27).jpeg JPEG file
Terrain Photo (1).jpeg JPEG file
Terrain Photo (5).jpeg JPEG file
Terrain Photo (26).jpeg JPEG file
Terrain Photo (11).jpeg JPEG file
Terrain Photo (4).jpeg JPEG file
Terrain Photo (15).jpeg JPEG file
Terrain Photo (6).jpeg JPEG file
Terrain Photo (22).jpeg JPEG file
Terrain Photo (32).jpeg JPEG file
Terrain Photo (14).jpeg JPEG file
Terrain Photo (18).jpeg JPEG file
Terrain Photo (16).jpeg JPEG file
Terrain Photo (8).jpeg JPEG file
Terrain Photo (2).jpeg JPEG file
Terrain Photo (25).jpeg JPEG file
Terrain Photo (33).jpeg JPEG file
Terrain Photo (19).jpeg JPEG file
Terrain Photo (23).jpeg JPEG file
Terrain Photo (17).jpeg JPEG file
Terrain Photo (3).jpeg JPEG file
Terrain Photo (7).jpeg JPEG file
Terrain Photo (20).jpeg JPEG file
Terrain Photo (31).jpeg JPEG file
Terrain Photo (28).jpeg JPEG file
Terrain Photo (30).jpeg JPEG file
Terrain Photo (12).jpeg JPEG file
Terrain Photo (24).jpeg JPEG file
Terrain Photo (13).jpeg JPEG file
Attachment 2 Bayview Drawings.pdf PDF
Attachment 5 FP14.pdf PDF
Attachment 4 Fire Plan 2022.doc DOC document
Attachment 3 Wage Determination.pdf PDF
Attachment 1 Section C Statement of Work.pdf PDF
127EAW23R0015.pdf PDF
Show all 39

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

� �� ����������������������������� !���"��#$��%��%�&������������������������������������!������������&��'����������&����� !�����&����$����&��&��$���&���������'���������#��������$'������&���&��������������$�������������������������'���&�(��)*+,-./�0)�10-.�*23405,/67/8/49�90� /�./2/+:/6�*9�9;/�<,*2/�6/=+74*9/6�)0.�9;/�./2/+<9�0)�0))/.=�<.+0.�90�9;/�;0-.�*46�6*9/�=</2+)+/6�8*1�./=-,9�+4�./>/29+04�0)�10-.�0))/.(��+���!�?�&�'��������������������!�'�����&���������%���������&��$&���!��'�������@��'�������%����!����������!�$����&��&��$���&���������'��������@��&�?����������$����&��&��$���&���������'�����������"���&���&��������������$����������������������������@��������&����?����&��&��������������%���'&�������������������(�

A�BCD

EE FG�H

�AI�A�J���������HEKL�M

N

HOPOH�BGKQR�BQ�
SOGTKBM

�PG

BQ�B
DOHS

G

�IU�VU�������� ���

WXY�Z[\]�\Ẑ _�̀abc�deeb\̂]�Z̀ �_̀ f\g\hdZ\̀a�̀g�h̀ aZidhZ]j̀if̂ i]Y��\Z�_̀ f\g\̂]�Z[̂ �h̀ aZidhZj̀if̂ i�à Y�d]�f̂ ]hi\k̂ f�\a�\Ẑ _�WlYmn(�*220-49+47�*46�*<<.0<.+*9+04�6*9*�opq�rstuvrswx ���������������(�����������@�+�����y�����mz@�����&��'&���%0���&���'�����"��#$��%��&��������������������������&��&����������'&�����������������������������$�����������&�����������@��!��������������$$�#��%��������{����� !�����$����%9������?���'���&�����$������������������������������&������+����m|(��9�����'&����������������������&�&����������0���&�WWY�Z[\]�\Ẑ _�̀abc�deeb\̂]�Z̀ �d_̂ af_̂ aZ]�̀g�]̀ b\h\ZdZ\̀a])*2+,+91�206/�206/� m} (�6*9/6�o~���p������xm}*(�806+)+2*9+04�0)�2049.*29�0.6/.�40(� (�6*9/6�o~���p������x�*(�*8/468/49�0)�=0,+2+9*9+04�40(

206/� y(�4*8/�*46�*66./==�0)�2049.*290.�o�������rss�����u�����~���s���w��p����wsx

�(�*68+4+=9/./6� 1�opq����sr������p�s���x206/��(�+==-/6� 1 <*7/���0)��<*7/=|(�./�-+=+9+04�<-.2;*=/�./�(�40(�(�/))/29+:/�6*9/n(�*8/468/49�806+)+2*9+04��40(� z(�<.0>/29�40(�opq�����v����sxm(��2049.*29�+6�206/d_̂ af_̂ aZ�̀g�]̀ b\h\ZdZ\̀aj_̀ f\g\hdZ\̀a�̀g�h̀ aZidhZ

�IU�VU����

2;/23�04/ *(�9;+=�2;*47/�0.6/.�+=�+==-/6�<-.=-*49�90{�o~�s�vq���u���rv��x��9;/�2;*47/=�=/9�)0.9;�+4�+9/8�m|�*./�8*6/�+4�9;/�2049.*29 (�9;/�* 0:/�4-8 /./6�2049.*29�0.6/.�+=�806+)+/6�90�./),/29�9;/�*68+4+=9.*9+:/�2;*47/=�o�u�����������s��v�����v����qqv�s��2(�9;+=�=-<<,/8/49*,�*7.//8/49�+=�/49/./6�+490�<-.=-*49�90�*-9;0.+91�0){6(�09;/.�o~�s�vq�����s��q���wvqv���v�����w��u���rv��x����r��rv��v���w�����s���x��=/9�)0.9;�+4�+9/8�m|@�<-.=-*49�90�9;/�*-9;0.+91�0)�)*.�|�(m}����( Ŷ�\_è iZdaZ� 2���&����&� ������� ���&��'�&��������%����������'���������&��'&�����������������������������������������'��%�������(�0.6/.�40(�+4�+9/8�m}*( m|(�6/=2.+<9+04�0)�*8/468/49�806+)+2*9+04�o r���v¡sw����¢�£��s��v����s�wv�����v���uwv������v�v���v��¤����r�����u�¥s�������sr�¦�srs�qs��v��s��

BGT�PG

§ TM§ TQ̈�QG�OTHG

NG

Q�
PO�©KBQOGTB�

TM�

TB�

B ª�Q«¬�®®̄«¬°� PO�±²¬³®́µ¶³�¶°�¶³·¬̧³�̧¬�«¬̧¬¹º�́ ¶̄ µ̧»µ̧®¬°�́¶®µ�®«¬�³µ¼́ ¯́®®́µ¶ªQ«¬�°²¬�°®¬�«³�¶µ®�¹¬¬¶�¬�®¬¶°¬°ª ¼¼�µ®«¬̧�®¬̧½³�¶°�̄µ¶°́ ®́µ¶³�̧¬½́¶�²¶̄«¶¾¬°ªN¬̧ µ́°�µ¿�N¬̧¿µ̧½¶̄ ¬̈���U�VU�����®µ���U��U���� m�*(�4*8/��*46�9+9,/�0)�2049.*29+47�0))+2/.�o���s��r��rv��xmz*(�4*8/�*46�9+9,/�0)�=+74/.�o���s��r��rv��x mz2(�6*9/�=+74/6 m� (�-4+9/6�=9*9/=�0)�*8/.+2*�mz (�2049.*290.�0))/.0. m�2(�6*9/�=+74/6o~v����urs��q��sr�����u���rv¡sw�����v��x o~v����urs��q�����r���v��� qqv�srx

OHR

M�

ª�BÀOTT

=9*46*.6�)0.8��}��./:(�mm�n}m��<&���&������!�7=*�)*.��|y�2).��z�(n|�<&�?��'����������'�'���$� /����������&�?�������&���@��$$���&����������������������������'�����&���&���������+�����*��&�m}*@������&�����&������%��@�&�������'�����%�����������'$$���&�������������(

GAOA Bayview Trailhead Parking lot Upgrade

Request for Information Questions and Answers

Amendment 1

5 May 2023

1. Question: Demolition Note 2. “Removal of other trees and vegetation less than 6”, to be included in the pay item for clearing and grubbing “. The bid schedule doesn’t include “Clearing and Grubbing “.

Government response: The government will be responsible for removal of vegetation less than 6”

2. Question: Sheet C2. Shows the beginning of the project just in front of the bathroom. How does it connect to the existing asphalt?

Government response: The connection of the existing road to the new road at stationing 6+84 is not included in this contract.

3. Question: What are the limits of the asphalt demolition?

Government response: Asphalt will be removed in all locations where new asphalt is proposed, as well as the region between the two parking lots.

4. Question: Sheet C1. Will the culvert in JPG 6 be extended to accommodate the new paving limits?

Government response: The government will remove the culvert prior to issuance of a notice to proceed.

5. Question: Attachment 1 Section C, Restrictions on Work 1. Can you show the limits of the north parking area and the entrance to the Bayview Trailhead?

Government Response: The north parking area includes the paved angle parking spaces between stationing1+50 and stationing 7+00 on the old road. The Bayview trailhead, sign, and kiosk is located on the south side of the new road at stationing 11+83.

6. Question: Please provide the erosion control plan sheets and SWPPP.

Government Response: The contractor is responsible for the preparation and implementation of the erosion control plan.

File details come from the government source that posted it. Updated .