1. Statement of Work - Revised 1 Feb.pdf

PDF 791 KB Posted

Attached to
127EAW23R0003 - Regional Office Painting
Solicitation number
127EAW23R0003
Issued by

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work Regional Office Painting Region 5 Pacific Southwest

1 February 2, 2023

US Forest Service Region 5 Pacific Southwest Regional Office Painting 1323 Club Drive Vallejo, CA 94592

SCOPE OF WORK: REVISION 1 February 2, 2023

The USDA US Forest Service, Region 5, Regional Office Building requires repainting of interior and exterior areas to update, revitalize , and protect the building.

The Contractor shall provide all necessary tools, equipment, products, labor, and supervision to complete the following tasks in accordance with industry standards. All door surfaces shall be properly prepared for repainting. This includes but is not limited to removing peeling paint, foreign objects of debris, taping or removal of door hardware and door signage, sanding, cleaning, and priming of all surfaces prior to painting. Door painting requires painting of all door surfaces and door jambs.

1. Prep, prime, and paint Janitorial Office door and frame located on the 1st Floor, South Wing

2. Prep, prime, and paint Stairwell 2 entry door and frame located on the 1st Floor, South Wing

3. Prep, prime, and paint exterior balcony guard and stair guard railings using exterior paint.

(photos attached)

4. Prep, prime, and paint all balcony doors and frames- South Wing

5. Prep, prime, and paint Mechanical Room double doors, shields at all door frame heads, frames-

South Wing

6. Prep, prime, and paint Chiller Room Door and door frames- South Wing

7. Prep, prime, and paint Boiler Room Door and Frame- South Wing

8. Prep, prime, and paint railings and handrails in front of Regional Office Building

9. Prep, prime, and paint Elevator exterior roll up door and frame- North Wing.

10. Prep, prime, and paint Employee Entry doors and frames- South Wing.

13. Prep, prime, and paint panels by south wing double glass doors on floors 2, 3, and 4. (photos attached)

14. Prep, prime, and paint panels over opening to back central entrance and exit south wing side. (photos attached)

15. Prep, prime, and paint vent hood over opening to back central entrance and exit south wing side. (photos attached)

16. Prep, prime, and paint steel beams, flashing, steel column at north employee entrance.

(photos attached)

OPTIONAL WORK: The government retains the right to exercise any or all of the following optional work during the contract period.

11. OPTIONAL WORK: Prep, prime, and paint railings, handrails, steps, stringers, and door jambs in Stairwell 1- South Wing from Floor 1 to Floor 4.

12. OPTIONAL WORK: Prep, prime, and paint railings, handrails, steps, stringers, and door jambs in Stairwell 2- South Wing from Floor 1 to Floor 4.

SUSTAINABILITY SUBMITTALS

1. Coatings must be tested and determined compliant in accordance with California Department

Region 5 Pacific Southwest

2 February 2, 2023 of Public Health (CDPH) Standard Method v1.1–2010, using the applicable exposure scenario.

2. VOC Content Requirements for Wet Applied Products: All paints and coatings wet-applied on site must meet the applicable VOC limits of the California Air Resources Board (CARB) 2007, Suggested Control Measure (SCM) for Architectural Coatings, or the South Coast Air Quality Management District (SCAQMD) Rule 1113, effective February 5, 2016.

3. Methylene chloride and perchloroethylene shall not be intentionally added in paints, coatings, adhesives, or sealants.

4. Indicate VOC content.

Region 5 Pacific Southwest

3 February 2, 2023

5. Compliance with UL 2818 GREENGUARD Certification Program for Chemical Emissions for Building Materials, Finishes and Furnishings

6. Compliance with California Department of Public Health (CDPH) Standard Method V1.2- 2017 using the applicable exposure scenario(s).

7. Compliance with UL GREENGUARD Certified standards for low chemical emissions into indoor air during product usage.

GENERAL:

1. Spray or rolling application of paint is preferred. Brush painting shall only be done in areas where spraying or rolling is not feasible.

2. The Contractor shall provide signage informing employees and visitors of painting and wet paint.

Signs shall be removed by the contractor after curing and drying time is complete.

3. Upon completion, all doors shall be returned to operational state including replacement of any hardware removed for painting.

4. Any excess paint spillage, drips, or over-spray onto other surfaces outside of the painted areas shall be removed by the contractor.

5. Oil based primer shall be used on all exterior surfaces.

6. Taping in lieu of removal of door hardware and signage to prevent overspray shall be acceptable.

7. Only Kelly Moore Brand paints shall be used. No substitutions are authorized.

8. Finished painted surfaces shall present a clean, smooth appearance free of paint streaks, discoloration, peeling, exposed primer, painter’s tape, or unfinished surface and will match existing building color schemes. Paint shall match existing color scheme, free of overspray, drips, or paint on any surfaces other than that required to be painted through this contract.

9. The Contractor shall not store any products, paints, or materials on site. The Contractor shall be responsible for removal of all construction and work debris, paint products

CONTRACTOR RESPONSIBILITIES:

1. Contractor Provided Equipment and Services. The Contractor shall provide all paints, equipment, labor, materials, and supervision to perform the work under this contract.

2. Contractor Deliverables. The Contractor shall provide all operations manuals and warranty information for all equipment to the COR within 5 days after installation.

3. Contractor must adhere to the Hours of Work: Monday through Friday 7am – 3pm EXCLUDING

Federal Holidays

GOVERNMENT RESPONSIBILITIES:

1. Government Provided Services. Access shall be provided to the workspace for the contractor to complete the work under this contract.

2. The government shall provide on-site parking for up to two vehicles to load and unload equipment.

SOW Item 3 guard rails SOW Item 13 panels by glass doors

SOW Items 14 and 15 panels and vent hood

SOW Item 16 north employee entrance

SOW Item 16 north employee entrance

SOW Item 16 north employee entrance

US Forest Service Region 5 Pacific Southwest Regional Office Painting SOW REVISION 1 FEBRUARY 2, 2023 1323 Club Drive Vallejo, CA 94592

SOW-R5-RO-Painting Revision 1.pdf
SCOPE OF WORK: REVISION 1 February 2, 2023
SUSTAINABILITY SUBMITTALS
GENERAL:
CONTRACTOR RESPONSIBILITIES:
GOVERNMENT RESPONSIBILITIES:

R5 painting SOW Revision 1 photos.pdf

File details come from the government source that posted it. Updated .