REGIONAL OFFICE PAINTING SOW

1. General. The USDA Forest Service, Region 5, Regional Office Building requires repainting of several interior and exterior areas to update and revitalize the appearance of the building environment.

Location of the Work: 1323 Club Drive, Vallejo CA 94592

Hours of Work: Monday through Friday 7am – 3pm EXCLUDING Federal Holidays

2. Scope of the Work:

2a. General: The Contractor shall provide all necessary tools, equipment, products, labor, and supervision to complete the following tasks in accordance with industry standards. All door surfaces shall be properly prepared for repainting that includes but is not limited to removing peeling paint, foreign objects of debris, taping or removal of door hardware and door signage, sanding, cleaning, and priming of all surfaces prior to painting. Door painting requires painting of all door surfaces and door jams.

1. Prep, prime and paint Janitorial Office door and frame located on the 1st Floor, South Wing

2. Prep, prime, and paint Stairwell 2 entry door and frame located on the 1st Floor, South Wing

3. Prep, prime, and paint exterior balcony railings using exterior paint

4. Prep, prime and paint all balcony doors and frames- South Wing

5. Prep, prime and paint Mechanical Room double doors and frames- South Wing

6. Prep, prime, and paint Chiller Room Door and door frames- South Wing

7. Prep, prime and paint Boiler Room Door and Frame- South Wing

8. Prep, prime and paint railings, and handrails in front of Regional Office Building

9. Prep, prime and paint elevator exterior roll up door and frame- North Wing.

10. Prep, prime and Paint Employee entry doors and frames- South Wing.

OPTIONAL WORK: The government retains the right to exercise any or all of the following optional work during the contract period.

11. OPTIONAL WORK: Prep, prime and paint railings, handrails, steps, stringers, and door jams in Stairwell 1- South Wing from Floor 1 to Floor 4.

12. OPTIONAL WORK: Prep, prime and paint railings, handrails, steps, stringers, and door jams in Stairwell 2- South Wing from Floor 1 to Floor 4.

2b. Spray or rolling application of paint is preferred. Brush painting shall only be done in areas where spraying or rolling is not feasible.

2c. The Contractor shall provide signage informing employees and visitors of painting and wet paint.

Signs shall be removed by the contractor after curing and drying time is complete.

2d. Upon completion all doors shall be returned to operational state including replacement of any hardware removed for painting.

2e. Any excess paint spillage, drips, or over-spray onto other surfaces outside of the painted areas shall be removed by the contractor.

2f. Oil based primer shall be used on all exterior surfaces.

2g. Taping in lieu of removal of door hardware and signage to prevent overspray shall be acceptable.

REGIONAL OFFICE PAINTING SOW

2h. Only Kelly Moore Brand paints shall be used. No substitutions are authorized. The government shall provide paint specifications for all paint required to match existing color scheme.

2i. Finished painted surfaces shall present a clean, smooth appearance free of paint streaks, discoloration, peeling, exposed primer, painter’s tape, or unfinished surface and will match existing building color schemes. Paint shall match existing color scheme, free of overspray, drips, or paint on any surfaces other than that required to be painted through this contract.

2j. The Contractor shall not store any products, paints, or material on site. The Contractor shall be responsible for removal of all construction and work debris, paint products

3. Contractor Provided Equipment and Services. The Contractor shall provide all paints, equipment, labor, materials, and supervision to perform the work under this contract.

3.1 Contractor Deliverables. The Contractor shall provide all operations manuals, and warranty information for all equipment to the COR within 5 days after installation

4. Government Provided Services. Access shall be provided to the workspace for the contractor to complete the work under this contract. Contractor must adhere to the working hours as outlined in paragraph 1. The government shall provide on-site parking for up to 2 vehicles to load/unload equipment.

4.1 The Government shall provide the contractor with paint color specifications for all required painted surfaces for brand, sheen and color, and VOC level to match existing color scheme.