REQUEST FOR INFORMATION (RFI) OFFICIAL RESPONSES
127EAW22R0072 - Wagon and Rattlesnake Gates
RFI responses will be responded to as necessary in amendment format which will be posted to the solicitation via beta.SAM.gov
Telephone requests for information will not be accepted or returned.
RFI #1 – OHV FENCE POST LENGTH 4’- 6’’ OR 6’ LONP PER DETAIL. (6’ DOESN’T
MAKE SENSE IF WE NEED TO BE 2’3’’ ABOVE GRADE)
USFS Response – Yes, 4’-6” is correct length and 2’-3” above grade required
RFI #2 – OHV FENCING THERE’S NO SPECIFICATION FOR THE COLOR/FINISH OF THE
USFS Response – Raw pipe is okay
RFI #3 – Statement of work states heritage resource areas need to be monitored. Is this effort to be provided by the Contractor?
USFS Response – No, must coordinate with FS on schedule so Heritage can be available.
RFI #4 – In relation to the PAL 1.
1. Is a water truck/trailer also required for PAL Level A?
2. Will a fire patrol person be required for barrier installation? Is that considered a mechanical operation?
3. If working on a PAL level C day, will a fire patrol person be required for each piece of equipment from 1 PM until sunset?
USFS Response – 1. Yes, 2.Only if PAL level C or higher. Welding is not considered a mechanical operation. 3. Yes if PAL level C fire patrol person is required.
RFI #5 – Is OHV fencing pipe galv finish? Or plain steel?
USFS Response – Plain Steel
RFI #6 – OHV fencing states posts are driven in the ground (no concrete). If posts are driven (with a fence post driver) then fishmouth cut and rail will need to be field cut/welded. Can holes be augered and soil compacted after installation of pre-fabricated rails sections?
USFS Response – Yes
FOR OFFICIAL USE ONLY
RFI #7 – Will unrestricted access be available on road through private parcels for construction?
USFS Response – Yes, but will need to be coordinated thru Recreation (Helen or Matthew)
RFI #8 – Gate Detail A indicates rails are 16 feet while drawing on top of page 5 indicates 14' 9" between center of gate posts and Schedule also lists 14 ft gate. To confirm, are these 14 foot gates?
USFS Response – Yes, these are 14-foot gates
RFI #9 – Schedule does not include line item for Horse Step. Are these costs to be included in the gate costs?
USFS Response – Include Horse Step in the linear footage of the barrier pipe
RFI #10 – The Statement of Work says that the contract includes 2 new horse gates however there is no line item for horse gates on the Schedule of Items. Horse gate detail is also shown on project maps and drawings
USFS Response – Include Horse gate in the linear footage of the barrier pipe
RFI #11 – Please provide a typical line-post elevation drawing, showing depth and rails.
USFS Response – See attached Drawing
RFI #12 – Must 2 ½” pipe be new pipe and powder coated?
USFS Response – No, only the gate requires powder coat