RFP FC Almanor.docx
DOCX document 156 KB Posted
- Solicitation number
- 127EAW22R0038
- Issued by
-
Department of Agriculture Forest Service
About this file
This pre-solicitation notice seeks contractors to provide construction services for vault toilet replacements and accessibility additions at the Almanor Campground on the Lassen National Forest in Plumas County, California. The project scope includes removing seven existing vault toilet buildings and replacing them with eight new precast concrete double vault toilet buildings, with construction of outdoor accessible routes to the new buildings per Forest Service guidelines. The estimated value is between $250,000 to $500,000. The solicitation will be released on or about May 16th, 2022 under NAICS code 237990 with a small business set-aside for HubZone firms. The response deadline will be on or about June 16th and work is expected to begin on or about July 5th, 2022. Pricing will be fixed price. The Forest Service is the contracting agency. This notice provides advance information to potential offerors but does not constitute a binding contract.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Request for Information No1.docx | DOCX document | |
| SF30.docx | DOCX document | |
| Signed Plans FC- Almanor CG ADA Toilet Replacments.pdf | ||
| SOW-Specifications_Almanor CG ADA Toilet Replacements.docx | DOCX document | |
| Project Maps_FC- Almanor CG ADA Toilet Replacments.pdf | ||
| wage determination.pdf | ||
| Fire Plan - Almanor RD.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION, OFFER, AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
127EAW22R0038
2. TYPE OF SOLICITATION SEALED BID (IFB)
x NEGOTIATED (RFP)
3. DATE ISSUED
06/03/2022
PAGE OF PAGES
IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.
| 4. CONTRACT NO. |
| 5. REQUISITION/PURCHASE REQUEST NO. |
1051795
6. PROJECT NO.
GAOA
| 7. ISSUED BY | CODE |
| 9J61 | |
| 8. ADDRESS OFFER TO |
Wendy Whiteman: wendy.whiteman@usda.gov Clement Bucher: clement.bucher@usda.gov
USDA FOREST SERVICE
FIRE AND AVIATION MANAGEMENT 3237 PEACEKEEPER WAY SUITE 101
MCCLELLAN CA 95652
| 9. | FOR | a. NAME | |
| INFORMATION | CLEMENT BUCHER |
CALL:
b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS) 301-800-8610
SOLICITATION
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date) GAOA FC ALMANOR CG ADA TOILET REPLACEMENTS AND ACCESSIBILITY ADDITIONS, LASSEN NATIONAL FOREST, CALIFORNIA
MAGNITUDE OF THE PROJECT IS BETWEEN $250,000 AND $500,000 THIS PROJECT IS 100% HUBZONE SET ASIDE
11. The Contractor shall begin performance 10 calendar days and complete it within 120 calendar days after receiving award, x notice to proceed.
The performance period is x mandatory negotiable.
(See
12a.
THE
CONTRACTOR
MUST
FURNISH
ANY
REQUIRED
PERFORMANCE
AND
PAYMENT
BONDS?
(If
"YES",
indicate within how many calendar days after award in
Item
12b.)
YES
NO
12b.
CALENDAR
DAYS
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. ( x )Sealed offers in original and 1 copies to perform the work required are due at the place specified in Item 8 by 1700 (hour) local time 07/06/2022 (date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due .
b. An offer guarantee is, is not required.
c. ( x )All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
d. Offers providing less than 60 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected .
NSN 7540-01-155-3212 STANDARD FORM 1442 (Rev. 4-85) Prescribed by GSA FAR(48 CFR) 53.236-1(d)
OFFER (Must be fully completed by offeror)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than item 14.)
CODE FACILITY CODE
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGEMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE.
| 20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) |
| 20b. SIGNATURE |
| 20c. OFFER DATE |
21. ITEMS ACCEPTED:
AWARD (To be completed by Government)
Continued...
| 22. AMOUNT |
| 23. ACCOUNTING AND APPROPRIATION DATA |
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
| ITEM | ||||
| 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO | ||||
| 10 U.S.C. 2304(c) | ( | ) | 41 U.S.C. 253(c) | ( ) |
| 26. ADMINISTERED BY | CODE |
| 9J61 | |
| 27. PAYMENT WILL BE MADE BY |
USDA FOREST SERVICE
FIRE AND AVIATION MANAGEMENT 3237 PEACEKEEPER WAY SUITE 101
MCCLELLAN CA 95652
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
28. NEGOTIATED AGREEMENT
(Contractor is required to sign this document and return 1 copies to issuing office.)
Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations,
29. AWARD
(Contractor is not required to sign this document.)
Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
| 30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) |
| 31a. NAME OF CONTRACTING OFFICER (Type or print) |
WENDY B. WHITEMAN
| 30b. SIGNATURE |
| 30c. DATE |
| 31b. UNITED STATES OF AMERICA |
BY
31c. DATE
STANDARD FORM 1442 (REV. 4-85) BACK
| CONTINUATION SHEET |
| REFERENCE NO. OF DOCUMENT BEING CONTINUED |
127EAW22R0038
PAGE OF
| 3 |
| 3 |
NAME OF OFFEROR OR CONTRACTOR
ITEM NO. (A)
SUPPLIES/SERVICES (B)
QUANTITY (C)
UNIT (D)
UNIT PRICE (E)
AMOUNT (F)
Delivery Location Code: 9JNE USDA FOREST SERVICE
SIERRA CASCADE ACQUISITION GROUP 2550 RIVERSIDE DRIVE
SUSANVILLE CA 96130 US
FOB: Destination
GAOA FC-Almanor CG ADA Toilet Replacements
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA FAR (48 CFR) 53.110
Table of Contents Project
Name:
GAOA
FC
Almanor
CG
Toilet
Replacement Lassen National Forest
Page
| PART I—THE SCHEDULE | 4 |
| SECTION B--SUPPLIES OR SERVICES AND PRICES/COSTS | 4 |
| SCHEDULE OF ITEMS | 4 |
| SECTION C--DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK | 5 | |
| SCOPE OF CONTRACT | 5 | |
| PROJECT LOCATON | 5 | |
| MAGNITUDE OF CONSTRUCTION PROJECT | 5 | |
| TECHNICAL SPECIFICATIONS | 5 | |
| SECTION D--PACKAGING AND MARKING | 6 | |
| PACKING AND MARKING | 6 | |
| PROJECT LABELING FOR OFFICIAL CORRESPONDENCE | 6 | |
| SECTION E--INSPECTION AND ACCEPTANCE | 7 | |
| E.1 | CLAUSES | 7 |
| SECTION F--DELIVERIES OR PERFORMANCE | 8 | |
| CLAUSES | 8 |
| SECTION G--CONTRACT ADMINISTRATION DATA | 9 | |
| CLAUSES | 9 | |
| OTHER REQUIREMENTS | 9 | |
| SECTION H--SPECIAL CONTRACT REQUIREMENTS | 12 | |
| CLAUSES | 12 | |
| OTHER REQUIREMENTS | 12 | |
| PART II--CONTRACT CLAUSES | 16 | |
| SECTION I--CONTRACT CLAUSES | 16 | |
| I.1 | CLAUSES | 16 |
| PART III--LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS | 29 | |
| SECTION J--LIST OF ATTACHMENTS | 29 | |
| J.1 | ATTACHMENTS | 29 |
| PART IV--REPRESENTATIONS AND INSTRUCTIONS | 30 | |
| SECTION K--REPRESENTATIONS, CERTIFICATIONS, AND | 30 | |
| OTHER STATEMENTS OF OFFERORS OR RESPONDENTS | 30 | |
| K.1 | PROVISIONS | 30 |
| SECTION L--INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS OR RESPONDENTS | 41 | |
| L.1 | PROVISIONS | 41 |
| SECTION M--EVALUATION FACTORS FOR AWARD | 50 | |
| PROVISIONS | 50 | |
| PROPOSAL EVALUATION | 50 |
PART I—THE SCHEDULE
SECTION B--SUPPLIES OR SERVICES AND PRICES/COSTS
B.1 SCHEDULE OF ITEMS
ITEM NO.
DESCRIPTION*
PAY UNIT
EST. QTY.
UNIT PRICE
TOTAL PRICE
| 01 |
| Demo existing double vault restrooms |
| EA |
| 5 |
| 02 |
| Demo existing triple vault restroom |
| EA |
| 1 |
| 03 |
| Demo existing quadruple vault restroom |
| EA |
| 1 |
| 04 |
| Provide and install new double vault restrooms |
EA
TOTAL
*See attached statement of work, project site description and plan sheets for additional details.
SECTION C--DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK C.1 SCOPE OF CONTRACT
This contract is to remove seven existing vault toilet buildings: five double vault, one triple vault and one quadruple vault toilet buildings and replace them with eight new precast concrete double vault toilet buildings in the seasonally open Almanor Campground on the Lassen National Forest. Contractor shall construct Outdoor Accessible Routes (ORARs) to the new vault toilet buildings per “Forest Service Outdoor Recreation Accessibility Guidelines (FSORAG), 2013”. The use of native surfacing is specified for these Outdoor Accessible Routes to the new vault toilet buildings.
C.2 PROJECT LOCATON
A. Location: This project is in Plumas County, California. The work site is at the USFS Almanor Campground, (40.2175 N, 121.1766 W) is 7.2 miles from Chester, CA. See the project plan set for more details.
Directions: From Susanville CA, travel down Hwy 36 for ~36.67 miles past the Almanor Ranger Station to the intersection with Hwy 89. Turn left onto Hwy. 89 for 5.5 miles to Almanor West Drive, Plumas Co. Route 310, left on to Almanor West Drive for 0.75 mile to the campground entrances. The County Road bisects the campground into the North Loop and the South Loop each of which have separate entrances onto the County Road.
C.3 MAGNITUDE OF CONSTRUCTION PROJECT
The Magnitude of the project is between $250,000 and $500,000.
C.4 TECHNICAL SPECIFICATIONS
See Section J, Attachment 1, “Statement of Work”
SECTION D--PACKAGING AND MARKING
D-1 PACKING AND MARKING
All shipments of materials, equipment and/or supplies shall be addressed to the Contractor and not to the Government.
D-2 PROJECT LABELING FOR OFFICIAL CORRESPONDENCE
The Government singularly identifies each project with a contract number at time of award. The contract number is a unique identifier to purposely and permanently represent an awarded project. The Government issued contract number is to be referenced on all official communication starting upon notice of award.
SECTION E--INSPECTION AND ACCEPTANCE
E.1 CLAUSES
52.246-12 Inspection of Construction (AUG 1996)
SECTION F--DELIVERIES OR PERFORMANCE
F.1 CLAUSES
52.242-14 Suspension of Work (APR 1984)
52.211-10 Commencement, Prosecution, and Completion of Work (APR 1984)
The Contractor shall be required to (a) commence work under this contract within _10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 120 calendar days After the Notice. The time stated for completion shall include final cleanup of the premises.
Work Timing Delays due to normal adverse weather, weekends, and holidays have been included in the calculation of contract time.
Winter Shutdown When winter weather sets in and the continuation of work is impractical, the Contracting Officer may authorize a total suspension until such time as work can proceed. During the period of total suspension, the calendar days elapsed will not be charged against the contract time specified. The Government shall not be responsible for remobilization costs.
SECTION G--CONTRACT ADMINISTRATION DATA
G.1 CLAUSES
G.2 OTHER REQUIREMENTS
Post Award Conference (NOV 1996)
A post award conference with the successful offeror is required. It will be scheduled TBD.
G.3 DESIGNATION OF CONTRACTING OFFICER’S REPRESENTATIVE
Contracting Officers Representative:
Name: Todd Orange Phone Number: 530-388-8265 Email Address: Todd.Orange@usda.gov
Payment for Materials Off Site In accordance with Clause 52.232-5, progress payments may include payment for materials stored off site. Contractor shall provide a copy of the paid invoice; provide evidence that the material will be included in the finished project; and identify the location where the materials are stored, so that the government may make visual inspection if the Contracting Officer deems it necessary. The Contractor shall be liable for loss, damage, or destruction of the materials until such time as the materials are physically in the possession and control of the government. The Contractor will not be held liable to the extent that the Contracting Officer determines that the loss, damage, or destruction occurred through the fault or negligence of the government or its agents.
Incidental Items The intent of the contract is to provide for the completion of the project described in the contract. Unless otherwise provided, the Contractor shall furnish all labor, materials, equipment, tools, transportation, and supplies and perform all work required to complete the project in accordance with drawings, specifications, and provisions of the contract. Payment for contract work will be made only for and under those pay items included in the Schedule of Items. All other work and materials will be considered as incidental to and included in the payment of items shown.
Preconstruction Conference This required conference will be scheduled TBD.
Invoices Payment will be made from the contractor’s invoice. All invoices are to be submitted via the electronic Invoice Processing Platform (IPP). This is a mandatory requirement initiated by the U.S. Department of Treasury and you can find more information at this website https://www.ipp.gov/index.htm. There is no pre-award registration.
After award of a contract, please make sure that your company registers promptly at https://www.ipp.gov/vendors/enrollment-vendors.htm to establish your account. PRIOR to starting the IPP enrollment process, please verify that the point of contact’s (POC’s) email address is up to date in your company’s System for Award Management (SAM) account at www.sam.gov and that any recent update(s) have been allowed time to process resulting in an “Active” status on the SAM account. The one-time enrollment in IPP means a series of emails will be sent to the SAM POC. If you have questions on the IPP enrollment process, the help desk phone number is 1-866-973-3131.
Invoices in IPP are the official record of payment. The payment certification per FAR 52.232-5 and a breakdown of billing, based on the pricing schedule, must be included as attachments to the IPP invoice in pdf or jpg format. (See next page for payment certification language.) The contractor must also be up-to-date on certified payrolls for the invoiced timeframe, FAR 52.222-8, by sending these to the COR prior to submitting the pertinent invoice. Do not upload payrolls to IPP. For assistance with creating invoices and attachments in IPP, the help desk phone number is 1-866-973-3131.
The Contractor shall submit payrolls weekly for each week in which any contract work is performed. The copies shall be sent to the COR. Payrolls submitted shall set out accurately and completely all of the information listed on the form WH-347 (available for download at www.dol.gov), including the certification from the WH-347. Certifications from other State or County government forms are not compliant.
Invoices that do not meet these requirements will be rejected, delaying invoice payment.
Contract Release When submitting final payment, Contractor shall provide a signed and dated contract release that includes the following information: "In consideration of receipt of final payment in the amount of $ ,Contractor hereby releases the United States of America from any and all obligations arising under this contract and any modifications thereof except as reserved herein. Reservations: "
| SECTION H--SPECIAL CONTRACT REQUIREMENTS H.1 | CLAUSES (NA) |
| H.2 | OTHER REQUIREMENTS |
USE OF PREMISES
(a) Before any camp, quarry, borrow pit, storage, detour, or bypass site, other than shown on the drawings, is opened or operated on USDA land or lands administered by the USDA, the Contractor shall obtain written permission from the Contracting Officer. A camp is interpreted to include a campsite or trailer parking area of any employee working on the project for the Contractor.
(b) Unless excepted elsewhere in the contract, the Contractor shall (i) provide and maintain sanitation facilities for the work force at the site and (ii) dispose of solid waste in accordance with applicable Federal, State and local regulations.
ARCHAEOLOGICAL OR HISTORIC SITES
If a previously unidentified archaeological or historic site(s) is encountered, the Contractor shall discontinue work in the general area of the site(s) and notify the Contracting Officer immediately.
INSURANCE COVERAGE
Pursuant to FAR clause 52.228-5, Insurance-Work on a Government Installation, the Contractor will be required to present evidence to show, as a minimum, the amounts of insurance coverage indicated below:
(a) Workers Compensation and Employer's Liability. The Contractor is required to comply with applicable Federal and State workers' compensation and occupational disease statutes. If occupational diseases are not compensable under those statutes, they shall be covered under the employer's liability section of the insurance policy, except when contract operations are so commingled with a Contractor's commercial operations that it would not be practical to require this coverage. Employer's liability coverage of at least $100,000 shall be required, except in States with exclusive or monopolistic funds that do not permit worker's compensation to be written by private carriers.
(b) General Liability. (1) The Contractor shall have bodily injury liability coverage written on a comprehensive form of policy of at least $500,000 per occurrence.
(c) Automobile Liability. The Contractor shall have automobile liability insurance written on a comprehensive form of policy. The policy shall provide for bodily injury and property damage liability covering the operation of all automobiles used in connection with performing the contract. Policies covering automobiles operated in the United States shall provide coverage of at least $200,000 per person and $500,000 per occurrence for bodily injury and $20,000 per occurrence for property damage or loss.
(d) Aircraft Public and Passenger Liability. When aircraft are used in connection with performing the contract, the Contractor shall have aircraft public and passenger liability insurance. Coverage shall be at least $200,000 per person and $500,000 per occurrence for bodily injury, other than passenger injury. Coverage for passenger injury shall be at least $200,000 multiplied by the number of seats or passengers, whichever is greater.
Emergencies Fire Plan [x ]See Section J, Fire Plan [ ]Not applicable; however, Contractors are required to comply with State law during fire season.
Area of Responsibility for Fire. Unless otherwise noted elsewhere in the contract, the following define the limits of a contractor's area of responsibility for fire under the terms of the Fire Plan (Section J):
[x ](a) Trail Construction - 100 meters on either side of the centerline [x ](b) Construction of Structures - 100 meters around the perimeter of the project [ ](c) Road Construction - 400 meters on either side of the centerline [x ](d) Special for this project
The area of responsibility is the area identified in the contract or within any area that has been actively worked on. So the contractor would be responsible for their area identified in the contract minus the areas being used/open to the public (ie. An open campground or campsites being actively used (reserved/run by the Forest Service) the contractor is responsible within any area directly affected by contractor’s operations
Utility Services
Electrical and water utilities located on site. Utilities may not be available for contractor use at time of construction. (see Section J, Attachment 4, Scope of Work)
Superintendence by Contractor In addition to Clause 52.236-6, the following applies: The name and the specific authorities of the foreman or superintendent must be designated in writing to the Contracting Officer. The Contractor may use his/her own prepared letterhead stationery or a "Designation of Contractor's Representative" form available from the Contracting Officer. If the Contractor or the designee is not present when work is being performed on the contract, a Suspend Work Order may be issued with contract time continuing to run. The Contractor shall have a person on-site that is fully conversant in the English language.
Loss, Damage or Destruction Equipment Furnished with Operator. The Government shall not be liable for loss, damage, or destruction of equipment furnished under this contract except for such loss, damage, or destruction resulting from the negligent or wrongful act(s) of Government employee(s) while acting within the scope of their employment.
Other. Even though this contract may provide for performing services at the direction of Government personnel, the contract is not for personal services, and neither the Contractor nor his or her personnel are Government employees. The Government assumes no liability for injury occurring to Contractor personnel or to third parties, or for loss, damage, or destruction involving third parties' property as a result of the Contractor's operation. Except that the Government is liable for such loss, damage, or destruction resulting from the negligent or wrongful act(s) of Government employee(s) acting within the scope of their employment.
Camping Permit Compliance Contractor shall comply with all terms and conditions of any camping permit issued to allow use of premises. Any non-compliance will result in suspension of work until compliance is achieved.
Archaeological and Historic Sites Location of known archaeological, historic, or pre-historic materials--such as Amerind artifacts and/or historic mining, logging, or fur trapping remains protected by the American Antiquities Act (l6 USC 433)--will be identified for the contractor before work commences.
Spill Plan If the total oil or oil products storage exceeds 1,320 gallons or if any single container exceeds a capacity of 660 gallons, the Contractor shall prepare and implement a Spill Prevention and Countermeasures (SPCC) Plan. Such plan shall meet applicable EPA requirements (40 CFR 112), including certification by a registered professional engineer. The Contractor under the direction of the Contracting Officer, or in the absence of said officer, acting independently, shall immediately take action to contain and clean up, without expense to the Government, all petroleum products spills on or in the vicinity of the project which are caused by the Contractor's employees directly or indirectly as a result of contract operations. The Contractor may be held liable for all damages and costs of additional labor, subsistence, equipment, supplies, and transportation deemed necessary by the Government for the containment and clean up of petroleum products spills caused by Contractor's employees or resulting from contract operations. The Contractor shall immediately report all petroleum products spills to the Contracting Officer.
Equipment Cleaning All off-road equipment used on this project shall be washed before moving into the project area so that the equipment is free of soil, seeds, vegetative material, or other debris that could contain or hold seeds of noxious weeds. “Off-road equipment” includes all logging and construction equipment and such brushing equipment as brush hogs, masticators, and chippers; it does not include log trucks, chip vans, service vehicles, water trucks, pickup trucks, and similar vehicles not intended for off-road use.
Equipment will be considered clean when visual inspection does not reveal soil, seeds, plant material, or other such debris. Disassembly of equipment components or specialized inspection equipment is not required. Contractor shall notify the Contracting Officer at least five days in advance of moving equipment in so that arrangements can be made for inspection.
If the project area is known to contain noxious weeds, the equipment shall be cleaned before moving to other Forest Service system lands which do not contain noxious weeds.
PART II--CONTRACT CLAUSES
SECTION I--CONTRACT CLAUSES
I.1 CLAUSES
52.252-2 Clauses Incorporated by Reference (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
Federal Acquisition Regulation (FAR) Clauses: https://www.acquisition.gov/browse/index/far (FAR clauses begin with 52) Department of Agriculture Acquisition Regulation (AGAR) Clauses: https://www.acquisition.gov/agar (AGAR clauses begin with 452) Deviations to clauses may be viewed at: https://www.dm.usda.gov/procurement/policy/FARClassDeviations.htm
| 52.202-1 |
| Definitions (JUN 2020) |
| 52.203-3 |
| Gratuities (APR 1984) |
| 52.203-5 |
| Covenant against Contingent Fees (MAY 2014) |
| 52.203-6 |
| Restrictions on Subcontractor Sales to the Government (JUN 2020) |
| 52.203-7 |
| Anti-Kickback Procedures (JUN 2020) |
| 52.203-8 |
| Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity |
(MAY 2014)
| 52.203-10 |
| Price or Fee Adjustment for Illegal or Improper Activity (MAY 2014) |
| 52.203-12 |
| Limitation on Payments to Influence Certain Federal Transactions (JUN 2020) |
| 52.203-13 |
| Contractor Code of Business Ethics and Conduct (NOV 2021) |
| 52.203-14 |
| Display of Hotline Poster(s) (NOV 2021) |
| 52.203-17 |
| Contractor Employee Whistleblower Rights & Requirements to Inform |
Employees of Whistleblower Rights (JUN 2020)
| 52.203-19 |
| Prohibition on Requiring Certain Internal Confidentiality Agreements or |
Statements (JAN 2017)
| 52.204-2 |
| Security Requirements (MAR 2021) Alternate II (APR 1984) |
| 52.204-4 |
| Printed or Copied Double-Sided on Postconsumer Fiber Content Paper (MAY |
2011)
| 52.204-10 |
| Reporting Executive Compensation and First-Tier Subcontract Awards (JUN |
2020)
| 52.204-13 |
| System for Award Management Maintenance (OCT 2018) |
| 52.204-14 |
| Service Contract Reporting Requirements (OCT 2016) |
| 52.204-15 |
| Service Contract Reporting Requirements for Indefinite Delivery Contracts (OCT |
2016)
| 52.204-18 |
| Commercial and Government Entity Code Maintenance (AUG 2020) |
| 52.204-19 |
| Incorporation by Reference of Representations and Certifications (DEC 2014) |
| 52.204-23 |
| Prohibition on Contracting for Hardware, Software, and Services Developed or |
52.204-25 Provided by Kaspersky Lab and Other Covered Entities (NOV 2021) Prohibition on Contracting for Certain Telecommunications and Video
52.209-6 Surveillance Services or Equipment (NOV 2021) Protecting the Government's Interest when Subcontracting with Contractors
Debarred, Suspended, or Proposed for Debarment (NOV 2021)
| 52.209-10 |
| Prohibition on Contracting with Inverted Domestic Corporations (NOV 2015) |
| 52.215-2 |
| Audit and Records -- Negotiation (JUN 2020) |
| 52.215-8 |
| Order of Precedence—Uniform Contract Format (OCT 1997) |
| 2.219-3 |
| Notice of Total HUBZone Set-Aside or Sole Source Award (SEP 2021) |
52.219-8
Utilization of Small Business Concerns (OCT 2018)
52.219-28 Post Award Small Business Program Rerepresentation (SEP 2021)
| 52.222-3 |
| Convict Labor (JUN 2003) |
| 52.222-4 |
| Contract Work Hours and Safety Standards -- Overtime Compensation (MAY |
52.222-6 2018) Construction Wage Rate Requirement (AUG 2018)
| 52.222-7 |
| Withholding of Funds (MAY 2014) |
| 52.222-8 |
| Payrolls and Basic Records (JUL 2021) |
| 52.222-9 |
| Apprentices and Trainees (JUL 2005) |
| 52.222-10 |
| Compliance with Copeland Act Requirements (FEB 1988) |
| 52.222-11 |
| Subcontracts (Labor Standards) (MAY 2014) |
| 52.222-12 |
| Contract Termination - Debarment (MAY 2014) |
| 52.222-13 |
| Compliance with Construction Wage Rate Requirements and Related Regulations |
52.222-14
(MAY 2014)
Disputes Concerning Labor Standards (FEB 1988)
| 52.222-15 |
| Certification of Eligibility (MAY 2014) |
| 52.222-21 |
| Prohibition of Segregated Facilities (APR 2015) |
| 52.222-26 |
| Equal Opportunity (APR 2016) |
| 52.222-27 |
| Affirmative Action Compliance Requirements for Construction (APR 2015) |
| 52.222-35 |
| Equal Opportunity for Veterans (JUN 2020) |
| 52.222-36 |
| Equal Opportunity for Workers with Disabilities (JUN 2020) |
| 52.222-37 |
| Employment Reports on Veterans (JUN 2020) |
| 52.222-40 |
| Notification of Employee Rights Under National Labor Relations Act (DEC |
52.222-50 2010) Combating Trafficking in Persons (NOV 2021)
| 52.222-54 |
| Employment Eligibility Verification (NOV 2021) |
| 52.222-55 |
| Minimum Wages under Executive Order 13658 (JAN 2022) |
| 52.222-62 |
| Paid Sick Leave under Executive Order 13706 (JAN 2017) |
| 52.223-5 |
| Pollution Prevention and Right-to-Know Information (MAY 2011) |
| 52.223-6 |
| Drug-Free Workplace (MAY 2001) |
| 52.223-17 |
| Affirmative Procurement of EPA-designated Items in Service and Construction |
52.223-18 Contracts (AUG 2018) Encouraging Contractor Policies to Ban Text Messaging While Driving (JUN
52.225-13 2020) Restrictions on Certain Foreign Purchases (FEB 2021)
| 52.227-1 |
| Authorization and Consent (JUN 2020) |
| 52.227-2 |
| Notice and Assistance Regarding Patent and Copyright Infringement (JUN 2020) |
| 52.227-4 |
| Patent Indemnity -- Construction Contracts (DEC 2007) |
| 52.228-2 |
| Additional Bond Security (OCT 1997) |
| 52.228-5 |
| Insurance – Work on a Government Installation (JAN 1997) |
| 52.228-12 |
| Prospective Subcontractor Requests for Bonds (MAY 2014) |
| 52.228-14 |
| Irrevocable Letter of Credit (NOV 2014) |
| 52.229-3 |
| Federal, State, and Local Taxes (FEB 2013) |
| 52.229-4 |
| Federal, State, and Local Taxes (State and Local Adjustments) (FEB 2013) |
| 52.232-5 |
| Payments under Fixed-Price Construction Contracts (MAY 2014) |
| 52.232-17 |
| Interest (MAY 2014) |
| 52.232-23 |
| Assignment of Claims (MAY 2014) |
| 52.232-27 |
| Prompt Payment for Construction Contracts (JAN 2017) |
| 52.232-33 |
| Payment by Electronic Funds Transfer – System for Award Management (OCT |
52.232-39 2018) Unenforceability of Unauthorized Obligations (JUN 2013)
| 52.233-1 |
| Disputes (MAY 2014) Alt 1 (DEC 1991) |
| 52.233-3 |
| Protest after Award (AUG 1996) |
| 52.233-4 |
| Applicable Law for Breach of Contract Claim (OCT 2004) |
| 52.236-2 |
| Differing Site Conditions (APR 1984) |
| 52.236-3 |
| Site Investigation and Conditions Affecting the Work (APR 1984) |
| 52.236-5 |
| Material and Workmanship (APR 1984) |
| 52.236-6 |
| Superintendence by the Contractor (APR 1984) |
| 52.236-7 |
| Permits and Responsibilities (NOV 1991) |
| 52.236-8 |
| Other Contracts (APR 1984) |
| 52.236-9 |
| Protection of Existing Vegetation, Structures, Equipment, Utilities, and |
52.236-10 Improvements (APR 1984) Operations and Storage Areas (APR 1984)
| 52.236-11 |
| Use and Possession Prior to Completion (APR 1984) |
| 52.236-12 |
| Cleaning Up (APR 1984) |
| 52.236-13 |
| Accident Prevention (NOV 1991) |
| 52.236-14 |
| Availability and Use of Utility Services (APR 1984) |
| 52.236-15 |
| Schedules for Construction Contracts (APR 1984) |
| 52.236-17 |
| Layout of Work (APR 1984) |
| 52.236-21 |
| Specifications and Drawings for Construction (FEB 1997) Alternate I (APR 1984) |
Alternate II (APR 1984)
| 52.242-5 |
| Payments to Small Business Subcontractors (JAN 2017) |
| 52.242-13 |
| Bankruptcy (JUL 1995) |
| 52.243-4 |
| Changes (JUN 2007) |
| 52.244-2 |
| Subcontracts (JUN 2020) |
| 52.244-6 |
| Subcontracts for Commercial Products and Commercial Services (JAN 2022) |
(DEVIATION APR 2020)
| 52.246-21 |
| Warranty of Construction (MAR 1994) |
| 52.248-3 |
| Value Engineering – Construction (OCT 2020) |
| 52.249-2 |
| Termination for Convenience of the Government (Fixed-Price) (APR 2012) |
Alternate I (SEP 1996)
| 52.249-3 |
| Termination for Convenience of the Government (Dismantling, Demolition, or |
Removal of Improvements) (APR 2012)
| 52.249-10 |
| Default (Fixed-Price Construction) (APR 1984) |
Alternate I (APR 1984)
| 52.253-1 |
| Computer Generated Forms (JAN 1991) |
52.225-9 Buy American Act-Construction Materials (NOV 2021)
(a) Definitions. As used in this clause-
Commercially available off-the-shelf (COTS) item-
(1) Means any item of supply (including construction material) that is-
(i) A commercial product (as defined in paragraph (1) of the definition of “commercial product” at Federal Acquisition Regulation (FAR) 2.101);
(ii) Sold in substantial quantities in the commercial marketplace; and
(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and
(2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4), such as agricultural products and petroleum products.
"Construction material" means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work.
The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.
Cost of components means-
(1) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or
(2) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.
Domestic construction material means-
(1) For construction material that does not consist wholly or predominantly of iron or steel or a combination of both-
(i) An unmanufactured construction material mined or produced in the United States; or
(ii) A construction material manufactured in the United States, if-
(A) The cost of its components mined, produced, or manufactured in the United States exceeds 55 percent of the cost of all its components. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic. Components of unknown origin are treated as foreign; or
(B) The construction material is a COTS item; or
(2) For construction material that consists wholly or predominantly of iron or steel or a combination of both, a construction material manufactured in the United States if the cost of foreign iron and steel constitutes less than 5 percent of the cost of all components used in such construction material. The cost of foreign iron and steel includes but is not limited to the cost of foreign iron or steel mill products (such as bar, billet, slab, wire, plate, or sheet), castings, or forgings utilized in the manufacture of the construction material and a good faith estimate of the cost of all foreign iron or steel components excluding COTS fasteners. Iron or steel components of unknown origin are treated as foreign. If the construction material contains multiple components, the cost of all the materials used in such construction material is calculated in accordance with the definition of "cost of components".
Fastener means a hardware device that mechanically joins or affixes two or more objects together. Examples of fasteners are nuts, bolts, pins, rivets, nails, clips, and screws.
Foreign construction material means a construction material other than a domestic construction material.
Foreign iron and steel means iron or steel products not produced in the United States.
Produced in the United States means that all manufacturing processes of the iron or steel must take place in the United States, from the initial melting stage through the application of coatings, except metallurgical processes involving refinement of steel additives. The origin of the elements of the iron or steel is not relevant to the determination of whether it is domestic or foreign.
Predominantly of iron or steel or a combination of both means that the cost of the iron and steel content exceeds 50 percent of the total cost of all its components. The cost of iron and steel is the cost of the iron or steel mill products (such as bar, billet, slab, wire, plate, or sheet), castings, or forgings utilized in the manufacture of the product and a good faith estimate of the cost of iron or steel components excluding COTS fasteners.
Steel means an alloy that includes at least 50 percent iron, between 0.02 and 2 percent carbon, and may include other elements.
"United States" means the 50 States, the District of Columbia, and outlying areas.
(b) Domestic preference. (1) This clause implements 41 U.S.C.chapter 83, Buy American, by providing a preference for domestic construction material. In accordance with 41 U.S.C. 1907, the domestic content test of the Buy American statute is waived for construction material that is a COTS item, except that for construction material that consists wholly or predominantly of iron or steel or a combination of both, the domestic content test is applied only to the iron and steel content of the construction materials, excluding COTS fasteners. (See FAR 12.505(a)(2)). The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause.
(2) This requirement does not apply to information technology that is a commercial product or to the construction materials or components listed by the Government as follows:
None [Contracting Officer to list applicable excepted materials or indicate "none"]
(3) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(2) of this clause if the Government determines that-
(i) The cost of domestic construction material would be unreasonable. The cost of a particular domestic construction material subject to the requirements of the Buy American statute is unreasonable when the cost of such material exceeds the cost of foreign material by more than 20 percent;
(ii) The application of the restriction of the Buy American statute to a particular construction material would be impracticable or inconsistent with the public interest; or
(iii) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available commercial quantities of a satisfactory quality.
(c) Request for determination of inapplicability of the Buy American statute. (1) (i) Any Contractor request to use foreign construction material in accordance with paragraph (b)(3) of this clause shall include adequate information for Government evaluation of the request, including-
(A) A description of the foreign and domestic construction materials;
(B) Unit of measure;
(C) Quantity;
(D) Price;
(E) Time of delivery or availability;
(F) Location of the construction project;
(G) Name and address of the proposed supplier; and
(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph (b)(3) of this clause.
(ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed price comparison table in the format in paragraph (d) of this clause.
(iii) The price of construction material shall include all delivery costs to the construction site and any applicable duty (whether or not a duty-free certificate may be issued).
(iv) Any Contractor request for a determination submitted after contract award shall explain why the Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award. If the Contractor does not submit a satisfactory explanation, the Contracting Officer need not make a determination.
(2) If the Government determines after contract award that an exception to the Buy American statute applies and the Contracting Officer and the Contractor negotiate adequate consideration, the Contracting Officer will modify the contract to allow use of the foreign construction material. However, when the basis for the exception is the unreasonable price of a domestic construction material, adequate consideration is not less than the differential established in paragraph (b)(3)(i) of this clause.
(3) Unless the Government determines that an exception to the Buy American statute applies, use of foreign construction material is noncompliant with the Buy American statute.
(d) Data. To permit evaluation of requests under paragraph (c) of this clause based on unreasonable cost, the Contractor shall include the following information and any applicable supporting data based on the survey of suppliers:
Foreign and Domestic Construction Materials Price Comparison
Construction Material Description Unit of Measure Quantity Price (dollars)* Item1:
Foreign construction material Domestic construction material
Item2:
Foreign construction material Domestic construction material
[* Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate is issued)].
[List name, address, telephone number, and contact for suppliers surveyed. Attach copy of response; if oral, attach summary.]
[Include other applicable supporting information.]
52.228-1 Bid Guarantee (SEP 1996)
(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.
(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States. The Contracting Officer will return bid guarantees, other than bid bonds –
(1) To unsuccessful bidders as soon as practicable after the opening of bids, and (2) To the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.
(c) The amount of the bid guarantee shall be 20 percent of the bid price or $_3 million whichever is less.
(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.
(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.
52.228-11 Individual Surety - Pledge of Assets (FEB 2021) (DEVIATION APR 2020)
(a) The Contractor shall obtain from each person acting as an individual surety on a performance bond or a payment bond -
(1) A pledge of assets that meets the eligibility, valuation, and security requirements described in the Federal Acquisition Regulation (FAR) 28.203-1; and
(2) Standard Form 28, Affidavit of Individual Surety, [except that the words “being duly sworn, depose and say” on the Standard Form 28 are replaced with the word “affirm” and the Standard Form 28 is not required to be sworn and notarized in block 12].
(b) The Contracting Officer may release a portion of the security interest on the individual surety's assets based upon substantial performance of the Contractor's obligations under its performance bond. The security interest in support of a performance bond shall be maintained—
(1) Contracts for the construction, alteration, or repair of any public building or public work of the Federal Government exceeding $150,000 (40 U.S.C. 3131). Until completion of any warranty period, or for 1 year following final payment, whichever is later.
(2) Contracts subject to alternative payment protection (see FAR 28.102-1(b)(1)). For the full contract performance period plus 1 year.
(3) Other contracts not subject to the requirements of paragraph (b)(1) of this clause. Until completion of any warranty period, or for 90 days following final payment, whichever is later.
(c) A surety's assets pledged in support of a payment bond may be released to a subcontractor or supplier upon Government receipt of a Federal district court judgment, or a sworn statement by the subcontractor or supplier that the claim is correct along with a notarized authorization of the release by the surety stating that it approves of such release. The security interest on the individual surety's assets in support of a payment bond shall be maintained—
(1) Contracts for the construction, alteration, or repair of any public building or public work of the Federal Government exceeding $150,000 which require performance and payment bonds (40 U.S.C. 3131). For 1 year following final payment, or until resolution of all pending claims filed against the payment bond during the 1-year period following final payment, whichever is later.
(2) Contracts subject to alternative payment protection (see FAR 28.102-1(b)(1)). For the full contract performance period plus 1 year.
(3) Other contracts not subject to the requirements of paragraph (c)(1) of this clause. For 90 days following final payment.
(d) The Contracting Officer may allow the Contractor to substitute an individual surety, for a performance or payment bond, after contract award. The Contractor shall comply with the requirements of paragraph (a) of this clause within the timeframe established by the Contracting Officer.
52.228-15 Performance and Payment Bonds -- Construction (JUN 2020) (DEVIATION APR 2020)
(a) Definitions. As used in this clause --
“Original contract price” means the award price of the contract; or, for requirements contracts, the price payable for the estimated total quantity; or, for indefinite-quantity contracts, the price payable for the specified minimum quantity. Original contract price does not include the price of any options, except those options exercised at the time of contract award.
(b) Amount of required bonds. Unless the resulting contract price is valued at or below the threshold specified in Federal Acquisition Regulation 28.102-1(a) on the date of award of this contract, the successful offeror shall furnish performance and payment bonds to the Contracting Officer as follows:
(1) Performance Bonds (Standard Form 25, EXCEPT THAT A SEAL IS NOT REQUIRED). The penal amount of performance bonds at the time of contract award shall be 100 percent of the original contract price.
(2) Payment Bonds (Standard Form 25-A, EXCEPT THAT A SEAL IS NOT REQUIRED). The penal amount of payment bonds at the time of contract award shall be 100 percent of the original contract price.
(3) Additional bond protection.
(i) The Government may require additional performance and payment bond protection if the contract price is increased. The increase in protection generally will equal 100 percent of the increase in contract price.
(ii) The Government may secure the additional protection by directing the Contractor to increase the penal amount of the existing bond or to obtain an additional bond.
(c) Furnishing executed bonds. The Contractor shall furnish all executed bonds, including any necessary reinsurance agreements, to the Contracting Officer, within the time period specified in the Bid Guarantee provision of the solicitation, or otherwise specified by the Contracting Officer, but in any event, before starting work.
(d) Surety or other security for bonds. The bonds shall be in the form of firm commitment, supported by corporate sureties whose names appear on the list contained in Treasury Department Circular 570, individual sureties, or by other acceptable security such as postal money order, certified check, cashier’s check, irrevocable letter of credit, or, in accordance with Treasury Department regulations, certain bonds or notes of the United States. Treasury Circular 570 is published in the Federal Register or may be obtained from the:
U.S. Department of Treasury Financial Management Service Surety Bond Branch 3700 East West Highway, Room 6F01 Hyattsville, MD 20782 Or via the internet at http://www.fms.treas.gov/c570/.
(e) Notice of subcontractor waiver of protection (40 U.S.C. 3133(c)). Any waiver of the right to sue on the payment bond is void unless it is in writing, signed by the person whose right is waived, and executed after such person has first furnished labor or material for use in the performance of the contract.
52.228-17 Individual Surety – Pledge of Assets (Bid Guarantee) (FEB 2021)
(a) Offerors shall obtain from each person acting as an individual surety on a bid guarantee—
(1) A pledge of assets that meets the eligibility, valuation, and security requirements described in the Federal Acquisition Regulation (FAR) 28.203-1; and
(2) Standard Form 28, Affidavit of Individual Surety.
(b) The Offeror shall include with its offer the information required at paragraph (a) of this provision within the timeframe specified in the provision at FAR 52.228-1, Bid Guarantee, or as otherwise established by the Contracting Officer.
(c) The Contracting Officer may release the security interest on the individual surety's assets in support of a bid guarantee based upon evidence that the offer supported by the individual surety will not result in contract award.
52.232-40 Providing Accelerated Payments to Small Business Subcontractors (NOV 2021) (DEVIATION APR 2020) (a)[(1) In accordance with 31 U.S.C. 3903 and 10 U.S.C. 2307, upon receipt of accelerated payments from the Government, the Contractor shall make accelerated payments to its small business subcontractors under this contract [in accordance with the accelerated payment date established], to the maximum extent practicable and prior to when such payment is otherwise required under the applicable contract or subcontract, [with a goal of 15 days] after receipt of a proper invoice and all other required documentation from the small business subcontractor [if a specific payment date is not established by contract.
(2) The Contractor agrees to make such payments to its small business subcontractors without any further consideration from or fees charged to the subcontractor].
(b) The acceleration of payments under this clause does not provide any new rights under the Prompt Payment Act.
(c) Include the substance of this clause, including this paragraph (c), in all subcontracts with small business concerns, including subcontracts with small business concerns for the acquisition of commercial products or commercial services.
452.222-70 Labor Law Violations (OCT 2021) In accepting this contract award, the contractor certifies that it is in compliance with all applicable labor laws and that, to the best of its knowledge, its subcontractors of any tier, and suppliers, are also in compliance with all applicable labor laws. The Department of Agriculture will vigorously pursue corrective action against the contractor and/or any tier subcontractor (or supplier) in the event of a violation of labor law(s) made in the provision of supplies and/or services under this or any other government contract.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .