This document is a series of questions and answers related to a federal contract opportunity for a fence project on the Gila National Forest. The key details are:
The solicitation is for a firm fixed-price contract to construct a fence, with a magnitude less than $25,000. The procurement is set aside for small businesses under NAICS code 238990. The agency is the USDA Forest Service. Responses are due by 5:00 PM EDT on August 5, 2024, and the performance period is anticipated to begin around August 12, 2024, with delivery by November 30, 2024. The questions cover details such as the pipe materials, lengths required, post installation methods, and site visit scheduling. The agency has provided responses to clarify these requirements.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions - 127EAV24Q0072 - Stewart Fence
1. Do you have pipe or is it used 2 5/8” well bore tubing. I ask because drill stem/tubing is usually magnetized after use. Magnetization makes weld process more difficult.
It is brand new pipe.
2. Length of provided pipe says 2500’. 2000’ for rails and 500 for uprights/posts.
• General Description Section States: Uprights will be placed 10 to 12 ft apart depending on lay of land.
• So, assuming you will be able to follow the 10’ spacing over 90% the fence project the pipe required is minimum of 40’ and as high as 100’ more than what is provided.
• 1000/10’ spacing = 100 – 10% = 90 posts. 90 posts at 6’ is 540’ of pipe used as posts. 2-4 of joints extra on top of the 2540’ required might be needed for cut offs.
We will provide whatever pipe is required to get the project completed.
3. Is the less than 25k magnitude going to remain firm?
Yes.
4. Is gate provided equipped with hinges?
No, we do not have hinges for the gate.
5. Should vendors contact you directly if they request a site visit?
Yes. A site visit date has been scheduled for Thursday, August 1, 20204 at 9:30am. Please contact Toney, Elizabeth - FS, NM elizabeth.toney@usda.gov and Gomez, Naomi - FS, NM naomi.gomez@usda.gov to schedule.
6. Is it possible to drive posts, or do they all need to be augered and filled with Sakrete?
All posts need to be set in sakrete.
7. Can equipment be used to clear out brush for the installation of the fence?
No. Vendor must remove bushing manually or chainsaw. Dozer and/or masticator are not covered in NEPA.