127EAU21Q0002 SOW.pdf

PDF 114 KB Posted

Attached to
RFQ Fencing Supplies for Coronado National Forest (USDA)
Solicitation number
127EAU21Q0002
Issued by

View the file

Other files

File Type Posted
Questions and Answers.pdf PDF
127EAU21Q0002.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

BIGHORN FIRE FENCE MATERIAL PURCHASE

SANTA CATALINA RANGER DISTRICT

CORONADO NATIONAL FOREST

January 12, 2021

Pre pa red by:

Christina Pearson - Rangeland Management Specialist

Scope of Work

Description of Tasks

To supply and deliver the following fence materials to the Santa Catalina Ranger District, Coronado National Forest to replace ones destroyed during the Bighorn Fire. Below is the total amount of material being requested.

Delivery T-Post, Smooth Barbed Angle Iron Brace Nuts& Wire Stays, Location (T-133) Wire, Wire, Braces, Angle Iron Bolts, 36in, 9.5 gauge, Santa 5 .5ft, w/ 4 12.5 gauge, 12.5 gauge, (2 in. X 2 in. Post, 1/2 in.X Class 1, Catalina clips/post Class 1 2pt, X 1/4 in. X 7 (2.5 in X 2.5 1.5 in. (100 stays per

Ranger ASTM (1320 ft. Class 1, ft) in. X 1/4 in. bundle) ASM

District Certified per roll) (1320ft per X 7ft) A121 roll)

Quantity 7,455 each 84 Rolls 252 Rolls 1040 each 520 each 840 Sets 252 Bundles

Needed

The quantities are subject to change based on pricing provided and available government funding.

Delivery Location and Point of Contact

Santa Catalina Ranger District

5700 N. Sabino Canyon Rd, Tucson, AZ 85750

Christina Pearson 520-240-6304

Bighorn Fire Fence Material Purchase

SANTA CATALINA RANGER DISTRICT-CORONADO NATIONAL FOREST

General Work Location

Supply and deliver the fence materials to the District listed above.

Time Limit

The Contractor will have (4) four weeks to complete this task from issuance of the purchase order.

----- End Scope of Work-------

Specifications and Drawina:s

T-Post, (T-133} 5.5ft, w/ 4 clips/post

Smooth Wire, 12.5 gauge, Class 1 (1320 ft. per roll)

Barbed Wire, 12.5 gauge, 2pt, 4inch barb spacing, Class 1, (1320 ft per roll)

Wire Stays, 36in, 9.5 gauge, Class 1, (100 stays per bundle) ASM A121

Brace Angle Iron Post (2.5 in X 2.5 in. X 1/4 in. X 7ft)

Angle Iron Braces (2 in. X 2 in. X 1/4 in. X 7 ft)

Nuts & Bolts, 1/2 in. X 1.5 in.

----- End Specifications and Drawings-------

Bighorn Fire Fence Material Purchase

SANTA CATALINA RANGER DISTRICT-CORONADO NATIONAL FOREST

File details come from the government source that posted it. Updated .