127EAU21Q0002 SOW.pdf
PDF 114 KB Posted
- Solicitation number
- 127EAU21Q0002
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Questions and Answers.pdf | ||
| 127EAU21Q0002.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
BIGHORN FIRE FENCE MATERIAL PURCHASE
SANTA CATALINA RANGER DISTRICT
CORONADO NATIONAL FOREST
January 12, 2021
Pre pa red by:
Christina Pearson - Rangeland Management Specialist
Scope of Work
Description of Tasks
To supply and deliver the following fence materials to the Santa Catalina Ranger District, Coronado National Forest to replace ones destroyed during the Bighorn Fire. Below is the total amount of material being requested.
Delivery T-Post, Smooth Barbed Angle Iron Brace Nuts& Wire Stays, Location (T-133) Wire, Wire, Braces, Angle Iron Bolts, 36in, 9.5 gauge, Santa 5 .5ft, w/ 4 12.5 gauge, 12.5 gauge, (2 in. X 2 in. Post, 1/2 in.X Class 1, Catalina clips/post Class 1 2pt, X 1/4 in. X 7 (2.5 in X 2.5 1.5 in. (100 stays per
Ranger ASTM (1320 ft. Class 1, ft) in. X 1/4 in. bundle) ASM
District Certified per roll) (1320ft per X 7ft) A121 roll)
Quantity 7,455 each 84 Rolls 252 Rolls 1040 each 520 each 840 Sets 252 Bundles
Needed
The quantities are subject to change based on pricing provided and available government funding.
Delivery Location and Point of Contact
Santa Catalina Ranger District
5700 N. Sabino Canyon Rd, Tucson, AZ 85750
Christina Pearson 520-240-6304
Bighorn Fire Fence Material Purchase
SANTA CATALINA RANGER DISTRICT-CORONADO NATIONAL FOREST
General Work Location
Supply and deliver the fence materials to the District listed above.
Time Limit
The Contractor will have (4) four weeks to complete this task from issuance of the purchase order.
----- End Scope of Work-------
Specifications and Drawina:s
T-Post, (T-133} 5.5ft, w/ 4 clips/post
Smooth Wire, 12.5 gauge, Class 1 (1320 ft. per roll)
Barbed Wire, 12.5 gauge, 2pt, 4inch barb spacing, Class 1, (1320 ft per roll)
Wire Stays, 36in, 9.5 gauge, Class 1, (100 stays per bundle) ASM A121
Brace Angle Iron Post (2.5 in X 2.5 in. X 1/4 in. X 7ft)
Angle Iron Braces (2 in. X 2 in. X 1/4 in. X 7 ft)
Nuts & Bolts, 1/2 in. X 1.5 in.
----- End Specifications and Drawings-------
Bighorn Fire Fence Material Purchase
SANTA CATALINA RANGER DISTRICT-CORONADO NATIONAL FOREST
File details come from the government source that posted it. Updated .