This is a Statement of Work (SOW) issued by the US Department of Agriculture for invasive weed survey and treatment services on the Cleveland National Forest following the 2024 Airport Fire.

The contractor must survey and treat up to 200 acres in the Trabuco Ranger District impacted by the Airport Fire, including trails, meadow areas, forest roadsides, riparian areas, chaparral, and campgrounds. Services include both survey work conducted by a crew of at least two qualified botanists capable of identifying target non-native invasive weed species, and treatment work performed by a crew of at least one lead weed removal technician/specialist and 3-5 weed removal technicians. Bids are structured as cost per crew day (8 hours plus travel time), with crews consisting of 4-6 people plus one supervisor, transportation, tools, and chemicals. The contractor must guarantee availability with no more than three weeks' notice. Treatment methods include manual removal via hand tools and weed wrenches, and chemical application using approved herbicides (glyphosate, triclopyr, imazapyr, aminopyralid, or fluazifop-p-butyl depending on species). All herbicide applications must be conducted by personnel holding a valid California Certified Pesticide Applicators license. Target species include yellow starthistle, Italian thistle, tamarisk, stinknet, Spanish broom, and others detailed in the attached species table with specific treatment timing windows from December through August. The contractor must comply with strict mitigation measures including maintaining 150-foot buffers from water bodies during fueling and herbicide mixing, limiting foliar spray applications to wind speeds below five miles per hour, avoiding application within 48 hours of rain, and maintaining a spill prevention kit on all vehicles. Work commences December 1, 2026, with completion by September 30, 2027. Deliverables include herbicide use logs detailing daily chemical applications and spatial data in ESRI ArcPro-compatible format (shapefile or geodatabase) documenting surveyed areas and target species locations with USDA plant codes, percent cover, and survey dates.

View the file

Other files

File Type Posted
C04_127EAT27Q0004 COMBO_SYNOPSIS.pdf PDF
Past Performance Questionnaire.docx DOCX document
C2 WD 1977-0727 Rev 81.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

US Department of Agriculture (USDA)

Statement of Work

Contents Project General Information

1.0 Scope of Work

2.0 Background

Contractor Requirements

3.0 Technical Requirements / Tasks

4.0 Government Furnished

5.0 Deliverables / Schedule

6.0 Contractor’s Key Personnel

7.0 Performance Requirement Measures

Project Airport BAR- EDRR Invasive Weed Surveys and Treatments

General Information

1.0 Scope of Work

The purpose of this project is to procure services to survey and treat target non-native plants in areas affected by the 2024 Airport Fire. The contractor will survey and treat up to 200 acres of areas impacted by the Airport Fire on the Trabuco Ranger District of the Cleveland National Forest. Survey and treatment areas will include: trails, meadow areas, Forest road sides, riparian areas, chaparral, and campgrounds. Surveys and treatments will prioritize known non-native weed infestations that were impacted by the fire and fire suppression activities (Fig. 1, Table 1) and existing infestations along dozer lines and roads.

Access to survey and treatment areas is by vehicle and foot. Vehicle access includes a variety of road conditions including ungraded dirt roads. Roads are frequently traveled and used by forest staff and neighboring residents, so care will be needed in these areas. Work may occur on rough, uneven and remote terrain and will require hiking.

The Cleveland National Forest will be ordering a weed treatment crew to control and remove weeds in the areas shown in Fig 1. The days worked may be non-contiguous.

The contractor will provide:

1) A survey crew of at least two (2) qualified botanists with the ability to identify target plant species, including non-native, invasive weeds. Work may occur in remote locations requiring driving on rough, infrequently maintained dirt roads and hiking on uneven terrain, riparian corridors, and steep slopes.

2) A weed treatment crew of at least one (1) lead weed removal technician/specialist and 3 to 5 weed removal technicians to control and/or remove target invasive plants within the project area. This crew will consist of at least one experienced botanist/weed removal technician/specialist who will be able to identify weed species of concern (including new introductions to the County). Some work may occur in remote locations requiring substantial driving on rough, infrequently maintained dirt roads and hiking on uneven terrain, riparian corridors, and steep slopes.

2.0 Background

Location: The project is located on the Trabuco Ranger District of the Cleveland National Forest, in and around the Airport Fire footprint, where previous weed infestations were observed and heavy equipment and/or crews worked on fire suppression (Fig. 1).

Description: The 2024 Airport Fire burned approximately 23K acres on the Trabuco Ranger District of the Cleveland National Forest. The fire mostly burned grassland and chaparral areas with some known weed infestations that are likely to spread in the post-fire environment. Stinknet, Spanish broom, yellow starthistle, shortpod mustard, Italian thistle, Russian thistle, tree tobacco, tree of heaven, wild oats, sweet fennel, tocolote, sow thistles, tamarisk, thoroughwort, and brome grasses were identified in surveys conducted by Forest Service botanists in 2024 and 2025. Most weeds were found along roadsides leading to the project area, and have the potential to continue to spread throughout the project area if not controlled and removed over the next year.

Up to 200 acres will need control and/or removal treatments for weeds, including but not limited to chemical treatments (herbicide applications) and/or mechanical removal (weed wrenches, hand tools).

Maps: A general map of the work area is attached as Figure 1. GIS shapefiles and layers will also be provided.

Contractor Requirements

3.0 Technical Requirements / Tasks

3.1. General Requirements

• The Contractor shall furnish the necessary personnel, supplies, materials, equipment, transportation, services and facilities to perform these specifications.

• Any prospective contractor bidding on this contract must provide a list of experience conducting botanical/invasive weed surveys in wildland settings. Award will be based on best value, considering cost AND work experience doing similar weed survey work in remote, backcountry locations.

• There are known cultural resources in the fire area. Work through the Forest point-of-contact to consult with staff archaeologists and Tribal liaison prior to implementing any weed treatments (hand/mechanical pulling or herbicide) to get treatment locations screened for cultural resource and/or Tribal concerns and/or mitigations.

3.2. Weed Technician Crew Requirements

• Survey will conducted by crews consisting of at least two qualified individuals with ability to identify target plant species, including uncommon or new introductions and with the ability to operate a GPS for mapping species locations. Contractor can use multiple crews, or larger crews, but for safety reasons no one can conduct survey work alone. At least one of the individuals will have formal botany training and have demonstrated experience surveying for weeds of concern in Southern California.

• Contract will be for a set number of crew days. Bids will be for cost of providing a crew (4 to 6 people plus one supervisor plus transportation and tools and chemicals) for one day (8 hours per day plus travel time) with the capabilities described in the specifications. The contractor must guarantee that no more than three weeks notice is required to reserve a crew for specific days of work under this contract.

• One crew day will be for 8 hours of work plus travel time.

• Crew supervisor must possess valid California Certified Pesticide Applicators license or certificate.

• Some infestations may be best treated by manual removal. Annual weed species must be treated and removed prior to seeding. Removal may involve bagging biomass or seed heads to prevent seed release and spread. This material must be properly disposed where it cannot further spread of the species.

• See 3.3. for herbicide treatment specifications and 3.4 for mitigation measures

• Control and removal treatments will require hiking over rough terrain and rocks with little to no shade.

• Data will be submitted in a GIS format. Shapefile or geodatabase is acceptable.

• Target plant species for control and/or removal will be discussed with the COR of this contract with input from the Cleveland National Forest Botanist. The survey will not focus on common, highly abundant non-native species. The main species of concern are yellow starthistle, Italian thistle, tamarisk, and tumbleweed (Table 2).

3.3. Herbicide formulation and application requirements

• The Contractor will follow all Local, State and Federal laws applicable to herbicide/pesticide application in forestry/wildland settings. These include laws related to having a licensed pesticide applicator conducting or supervising the mixture and application of herbicides in the project area and ensuring that proper safety gear/ PPE is provided and used by workers.

• The herbicide formulation for woody plants (e.g. tamarisk) may consist of a solution of triclopyr (ex. Garlon 4, or

Vastlan) OR imazapyr (ex. Habitat) and surfactant as directed on the label. No diesel or other petrochemical based surfactants may be used. The formulation used must have final approval by the COR and will be tailored to cut stump, basal bark or foliar application depending on the situation.

• For herbaceous species, a targeted foliar application of an aquatically approved formulation of glyphosate (ex.

Rodeo, Aquamaster) may be used. A mixture of glyphosate and imazapyr may also be used in some situations.

Herbicides will be mixed with a surfactant as directed on the label. No diesel or other petrochemical based surfactants may be used.

• Depending on species detected, formulations of Aminopyralid (ex. Transline) or Fluazifop-p-butyl (ex. Fusilade) with surfactant as directed on the label may also be used.

• Herbicides will be colored with a biodegradable dye to facilitate visual control of application.

• Non-target plants may need to be pruned or folded away from the target plant to prevent damage.

• The final herbicide and surfactant formulations used must be approved by the Forest Service and will be documented in a Pesticide Use Proposal (PUP) signed by the Forest Service.

• The contractor must report to the Forest Service the total amount of herbicide applied and chemical formulation and location applied detailed for each day.

• The contractor will follow the attached Pesticide Spill Plan and will have a spill prevention kit on vehicles that matches or exceeds the specifications in the plan.

3.4. Mitigation Measures

• For small quantities (5 gallons or less), fueling of gas-powered machinery would not occur within 25 feet of any body of water or stream channel to maintain water quality. All other fueling must occur at a minimum of 150 feet from any body of water or stream channel unless prior-approved by a Forest Service hydrologist or biologist. (BMP 2.11; Road-10)

• Herbicides would be applied using hand sprayers or backpack sprayers, potentially with daubing attachments, only or powered boom sprayers. No aerial application of herbicides would occur. All herbicide application would adhere to all applicable Federal laws and laws of the State of California and counties in which treatment occurs.

• No foliar spray activities would be allowed if wind velocity is expected to exceed five miles per hour.

• No herbicide treatments would be allowed when rain is occurring or likely to take place within 48 hours.

• Herbicides would not be applied directly to surface waters. Treatments would be timed to minimize the potential for introduction of herbicide to surface waters. When a target species occurs adjacent to surface waters care will be taken to prevent herbicide drift to surface waters, including trimming and folding of plants away from waters.

• Work crews would be supervised to ensure that specific safety practices are followed. These practices include the use of appropriate protective clothing. Clean water and soap and an eye wash kit must be provided be available for emergency washing.

• The Herbicide Transportation, Handling, and Emergency Spill Response Plan and spill kit will be on-site when herbicide treatment methods occur. The Plan will include reporting procedures, project safety planning, methods of clean-up of accidental spills, and information including a spill kit contents and location as noted in

Forest Service Manual (FSM) 2150, Pesticide-Use Management and Coordination and Handbook (FSH) 2109.14, Pesticide-Use Management and Coordination Handbook.

• Equipment used for transportation, storage, or application of herbicides will be maintained in a leak-proof condition.

• To reduce the potential for spills, impervious material, such as a bucket, will be placed beneath mixing areas in such a manner as to contain any spills associated with mixing/refilling.

• Immediate control, containment, and cleanup of fluids and herbicides due to spills or equipment failure (broken hose, punctured tank, etc.) will be implemented. All contaminated materials will be disposed of promptly and properly to prevent contamination of the site. All hazardous spills will be reported immediately to the Forest Hazardous Spill Coordinator.

• Herbicide usage will be limited to the minimum amount required to be effective.

• Mixing and loading of herbicide(s) will take place a minimum of 150 feet from any body of water or stream channel unless prior approval is obtained from a Forest Service hydrologist or biologist.

• Herbicide spray equipment will not be washed or rinsed within 150 feet of any body of water or stream channel.

All herbicide containers and rinse water will be disposed of in a manner that would not cause contamination of waters.

• The Contractor shall avoid all flagged locations of heritage resources and if any heritage resources are discovered during implementation, all project related work shall cease immediately and notification to Contracting Officer’s Representative (COR) initiated. The Contractor will also avoid all flagged areas where buffers are created around certain sensitive plant or animal species.

4.0 Government Furnished

• The Government will provide gate key for vehicular access to some work sites.

• The Government will also provide GIS data of infestations, project areas and land ownership.

5.0 Deliverables / Schedule

Estimated Start Date & Contract Time

Projected Start Date: December 1st, 2026 Projected Completion Date: September 30, 2027*

Deliverables:

The contractor will deliver a summary of all treatment efforts and accompanying spatial data.

• Herbicide use logs detailing daily chemical applications must be provided to the US Forest Service. Logs must detail herbicide formulation applied and the total amount of spray (including dilutant) applied each day along with the spatial area where the application occurred.

• Spatial data must be submitted in an ESRI ArcPro compatible format, either shapefile or geodatabase. The spatial data must include the spatial extent of areas surveyed as a polygon, and point/polygon data of target species detected including attributes for species (using USDA plant codes) and percent cover of target species in mapped polygon, and date surveyed.

6.0 Contractor’s Key Personnel

• Treatment crew will have individuals trained and qualified for safe herbicide application in wildland settings.

The crew foreman must be able to correctly identify target weed species and ensure crew targets the correct plants.

• The Contractor must possess a valid California Pesticide Use Applicator License/Certificate and be registered to work in Orange and Riverside Counties, California with appropriate category.

7.0 Performance Requirement Measures

Quality Standard: The Government’s Quality Standard is the standard against which all the Contractor’s performance shall be measured.

Acceptable Quality Level (AQL): The maximum allowable deviation from the Quality Standard for work performed in this contract before the Government will request remedy for any issues that may hinder or limit project completion.

Government Inspection/Visits: The Contracting Officer Representative (COR) or technical specialist monitor may inspect treatment areas during and after weed treatments to ensure compliance and completion of work.

Performance Requirements Summary (PRS) Table Performance

Objective Performance Standard Acceptable Quality Level (AQL)

Method of Surveillance

Remedy for Non- Performance

1. Acreage Survey & Treatment

Survey and treat up to 300 200 acres within the project area.

Survey and treat up to 200 acres within the project area.

COR or Forest staff may conduct field visits and check-ins during work days.

Re-treat missed areas at contractor expense within 14 days.

2. Reporting & GIS Data

Submit deliverables (herbicide use logs and spatial data for treatments) in a timely manner.

All deliverables submitted to COR or Forest staff in a timely manner.

COR or Forest staff will review and approve submittals.

COR or Forest staff may ask for follow up information/details.

3. Field Safety Comply with USFS herbicide, tool use, and fire safety regulations.

No chemical drift, spills, or unauthorized fire risks.

Field visits by technical specialist or COR.

Discussion with COR, CO, and contractor to fix situation.

8.0 Maps and Figures

Fig. 1. Map of project area- survey and treatment polygons.

Table 1. Work will occur during optimal times to detect and treat target priority species shown below:

Species Common name

General location

Burned/ Suppression Areas

Impact Treatment priority

Treatme nt timing

Recommended treatment

Ageratina adenophora sticky snakeroot riparian areas, Bell Canyon, along streams

Suppression

Quickly establishes and forms dense thickets, displacing native vegetation, altering ecosystems.

Moderate December -March

Hand pull seedlings and smaller plants (make sure root is removed) before seeding.

Backpack spray herbicide application with glyphosate (2- 3% application rate).

Arundo donax giant reed riparian areas near cabin tracts, Trabuco Canyon

Both

Quickly establishes and forms dense clonal thickets, displacing native vegetation, and altering riparian ecosystems.

High December -April

Cut-stump herbicide application with aqua-safe formulation Glyphosate and Imazapyr (20% application rate).

Alternatively, can dig out rhizomes.

Carduus pycnocephal us

Italian thistle

San Juan Campground, Ortega Hwy, Blue Jay and Falcon meadows, Upper San Juan Campground staging area, roadsides, and trails

Both

Quickly establishes and forms dense thickets, displacing native vegetation, altering ecosystems.

Moderate December -June

Hand pull plants in rosette or bolting stages, before budding/flowerin

g. Bag seed heads and dispose bags off forest land.

Backpack spray herbicide application using glyphosate at 3- 4% application rate.

Centaurea solistitialis yellow starthistle

Ortega Hwy, unco Meadow, Bedford Truck Trail, Main Divide Rd

Both

Quickly establishes and forms dense thickets;

easily dispersed by wind and animals.

Displaces native vegetation cover and alters vegetation communities

High April-July

Hand pull vegetative seedlings (non-budding/flowerin

g) and leave on site. Bag flowers and dispose of bags off forest land. Backpack spray herbicide application using glyphosate at 3- 4% application rate.

and ecosystems.

Cirsium vulgare bull thistle

Blue Jay and Falcon Meadows, riparian areas, Bear Spring/Main Divide Rd, Holy Jim Canyon

Both

Easily establishes and spreads in riparian areas. Alters soil chemistry and salinity in riparian areas-potentially impacting native vegetation recovery/gro wth.

High April-July

Hand pull small seedlings, cut-stump herbicide application with aqua-safe formulation glyphosate at 3- 4% application rate.

Cynara cardunculus artichoke thistle

Sitton Peak Rd, Ortega Hwy Suppression

Quickly establishes and forms dense thickets;

easily dispersed by wind and animals.

Displaces native vegetation cover and alters vegetation communities and ecosystems.

High February- May

Hand pull vegetative seedlings (non-budding/flowerin

g) and leave on site. Bag flowers and dispose of bags off forest land. Backpack spray herbicide application using glyphosate at 3- 4% application rate.

Foeniculum vulgare sweet fennel

Ortega Hwy, Trabuco Canyon Rd trails (Holy Jim, Trabuco Canyon)

Both

Quickly establishes and forms dense thickets;

easily dispersed by wind and animals.

Displaces native vegetation cover and alters vegetation communities and ecosystems.

High February- July

Hand pull vegetative seedlings (non-budding/flowerin g). Cut-stump herbicide application with triclopyr (80% application rate)

Ficus carica edible fig Holy Jim Canyon Burned

Quickly establishes and forms dense thickets, displacing native vegetation, altering ecosystems.

High May- August

Hand pull individual seedlings. Cut-stump herbicide application with Vastlan (100% application rate) or aqua-safe formulation Imazapyr (20% application rate) or Garlton 4 Ultra (30% application rate)

Nicotiana glauca tree tobacco Ortega Hwy, roadsides Suppression

Grows along roadsides and in riparian areas, if introduced.

Somewhat of a fire-follower.

Moderate March- Aug

Cut-stump herbicide application with triclopyr (80% application rate)

Oncosiphon piluliferum stinknet

Main Divide Rd, Holy Fire burn scar, Divison F private property leading to FS lands

Both

Highly invasive and spreads easily through openings in coastal sage scrub and chaparral habitats.

Formerly detected along Main Divide Rd in Holy Fire burn area.

High January- April

Hand pull individual plants and bag flowering heads.

Dispose bags off forest lands.

Backpack spray herbicide application using glyphosate (3- 4% application rate).

Pennisetum setaceum fountaingrass Ortega Hwy, roadsides, trails Suppression

Forms dense clonal thickets in chaparral and coastal sage scrub, and displaces native vegetation.

Vegetatively grows and reproduces by seed.

High December -June

Backpack herbicide application using glyphosate (3- 4% application rate)

Rubus americanum

Himalayan blackberry

Trabuco Canyon Suppression

Forms dense thickets in riparian areas and displaces native vegetation.

Grows vegetatively

Moderate December -June

Backpack herbicide application using water-safe glyphosate formulation (3- 4% application and reproduces by seed.

rate). Hand pull individual plants.

Salsola australis prickly Russian thistle

Bedford Truck Trail, roadsides, trails

Suppression

Forms dense thickets and displaces native vegetation, altering ecosystems.

High March- June

Backpack herbicide application using glyphosate (3- 4% application rate) or aminopyralid (3- 4% application rate)

Sisymbrium altissimum and/or Hirschfelida incana tall tumblemustar d and shortpod mustard various campgrounds, Junco Meadow, Blue Jay Meadow, roadsides, trails, driveway areas

Both

Forms dense thickets and displaces native vegetation, altering ecosystems.

Moderate April- May

Hand pull plants before seeding, mowing, herbicide application with glyphosate (3% application rate)

Spartium junceum

Spanish broom

Ortega Hwy, San Juan Campground, El Cariso Campground, Main Divide Rd

Both

Forms dense thickets and displaces native vegetation, altering ecosystems.

High December -March

Cut-stump herbicide application with triclopyr (80% application rate)

Tamarix parviflora tamarisk/salt cedar riparian areas, along streams, Bedford Truck Trail, Cold Creek Canyon, Trabuco Canyon Creek, Los Pinos CCC reservior

Both

Easily establishes and spreads in riparian areas. Alters soil chemistry in riparian areas-potentially impacting native vegetation recovery/gro wth.

High Septembe r- March

Hand pull small seedlings, cut-stump herbicide application with aqua-safe formulation Imazapyr mix, recommended 20% application rate.

Project
General Information
1.0 Scope of Work
2.0 Background
Contractor Requirements
3.0 Technical Requirements / Tasks
4.0 Government Furnished
5.0 Deliverables / Schedule
6.0 Contractor’s Key Personnel
7.0 Performance Requirement Measures
8.0 Maps and Figures