This is a Questions and Answers document for Federal Solicitation 127EAT27Q0004, issued November 17, 2026, with amendments dated November 18 and 20, 2026. The solicitation addresses Airport BAER Weed Treatment services for Cleveland National Forest, with submissions due November 25, 2026, by 12:00 PM Pacific Time to megan.acord@usda.gov. The contract involves surveying and treating invasive weed species, including four focus species (yellow starthistle, Italian thistle, tamarisk, and tumbleweed) and additional species as identified, with treatment timing spanning spring through summer across non-contiguous periods.
The contractor must provide a crew of 4–6 personnel plus one supervisor, transportation, tools, and herbicides, billed on a per-day basis (8 hours plus travel time, with travel time billable as part of the daily rate). The prime contractor must independently hold a valid California Pesticide Use Applicator License/Certificate and be registered to work in Orange and Riverside Counties—licensing must be in place at quotation submission, not later. A Quality Assurance Lead (QAL) or Quality Assurance Coordinator (QAC) must be onsite for all herbicide applications. Nesting bird surveys and biological monitors are not required. Multiple survey and treatment days will be needed depending on species phenology; the contractor must provide notice within three weeks before commencing work and must deliver treatment information including herbicide application rates, treated areas in acres, and spatial data. No portal exists for submission; all materials, including the Past Performance Questionnaire and solicitation documents, must be submitted via email by November 30, 2026, at 12:00 PM Mountain Time.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| C04_127EAT27Q0004 COMBO_SYNOPSIS AMD 0001.pdf | ||
| 127EAT27Q0004 Q_A AMD0001.pdf | ||
| Statement of Work_dated 17 Nov 2026.pdf | ||
| C04_127EAT27Q0004 COMBO_SYNOPSIS.pdf | ||
| Past Performance Questionnaire.docx | DOCX document | |
| C2 WD 1977-0727 Rev 81.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation Number: 127EAT27Q0004
SOLICITATION
Solicitation Number 127EAT27Q0004
Airport BAER Weed Treatment Cleveland National Forest
ISSUED: November 17, 2026 AMD0001 18 November 2026 AMD0002 20 November 2026
Question: The Statement of Work, section 6.0 (page 7), says "The Contractor must possess a valid California Pesticide Use Applicator License/Certificate and be registered to work in Orange and Riverside Counties, California with appropriate category." Our firm would not apply pesticide itself; the treatments would be performed by a first-tier subcontractor that holds the California license and the county registrations. Does the subcontractor's license and registration satisfy this requirement, or must the prime contractor hold them as well?
Answer: yes, the contractor must possess a valid California Pesticide Use Applicator License/Certificate and be registered. California law applies to persons who are not federal employees and who are hired by or under contract to a federal agency or the facility operator to perform pest control on a federal facility. Therefore, all contractors are required to comply with state laws and regulations. Each company would need to be a licensed pest control business, including the prime contractor. California Food and Agricultural Code (FAC) 11701 requires that any person who may advertise, solicit, or operate as a pest control business be licensed with
DPR.
Question: The solicitation sets questions due "no later than November 23, 2025, at 12:00 PM Pacific Time." Please confirm the year is 2026.
Answer: Corrected to reflect November 25, 2026.
Question: As the project timeline extends beyond the nesting bird season, will a biological monitor be required on-site during treatment, or are pre-removal surveys sufficient? Please let me know if we should include a dedicated biologist in our bid.
Answer: No, a biological monitor will not be required on site during treatment and pre-removal (nesting bird) surveys are not required.
Question: Could you please clarify the billing expectation for "8 hours per day plus travel time"? I would like to confirm whether the travel time is billable as an additional expense or if the 8-hour shift is intended to be all-inclusive.
Answer: Travel time is billable, to be included in the expense for treatment. The 8-hour shift is all-inclusive, and can include travel time.
Question: Previous solicitations have included multiple surveys and treatments in different seasons. Can you confirm that this will only include on survey, and then 1 treatment based on the results of the survey?
Answer: Since there are multiple different species targeted, there will probably be a handful of survey days needed to get an accurate idea of what species are emerging and where. A handful of treatment days (non-contiguous) may be needed depending on species phenology as well. So, not only one survey day and one treatment day is needed- multiple survey and treatment days will be needed. Survey days and Treatment days do not have to be contiguous or all in the same block of time or week- the survey and treatment days may be spread out to survey for and treat weeds during the appropriate times.
Question: Will treatment only target the 4 focus species (yellow starthistle, Italian thistle, tamarisk, and tumbleweed) or will it include the other species listed in the table as well? This will affect treatment times.
Answer: Yes, the treatment target the 4 species and can also include the other species listed in the table. Yes, treatment times will vary for each species. Treatment days do not have to be contiguous or all in the same block of time or week- the treatment days may be spread out to treat weeds during the appropriate times.
Question: Can all treatment be performed simultaneously?
Answer: Yes, treatments can be conducted simultaneously.
Question: Is there specific timing for when the treatments must take place? Spring would be the ideal time for surveys and treatment for the focus species.
If work occurs during nesting bird season, will surveys will be required before treatment takes place?
Answer: Timing for treatments may range between spring and summer. Nesting bird surveys and bio monitors will not be required prior to or during treatments.
Question: Can you clarify what this means: "Contract will be for a set number of crew days.
Bids will be for cost of providing a crew (4 to 6 people plus one supervisor plus transportation and tools and chemicals) for one day (8 hours per day plus travel time) with the capabilities described in the specifications. The contractor must guarantee that no more than three weeks notice is required to reserve a crew for specific days of work under this contract."
Answer: The contract will be for a set number of crew days (can include survey, treatment, and travel time). The bids should include the cost of a 4 to 6 person crew, plus one supervisor and transportation of tools and chemicals. The crew, supervisor, and herbicide and tools should have the necessary specifications as described in the SOW. The contractor must notify the forest that a crew is confirmed to work under the contract within 3 weeks before starting the work.
Question: Should a daily rate be provided in addition to the per acre survey and treatment acre?
Answer: Yes, please provide the treatment information (e.g. application rates of herbicides used, areas treated (in acres), and spatial data. Those are all deliverables required by the contract.
Question: Is the QAL supervisor required to be onsite or can they supervise remotely with all onsite staff trained and qualified for herbicide application?
Answer: Yes. A QAL or QAC should be onsite for all herbicide applications.
Question: I am just following up with a second email and with further questions. Is there a portal to submit our application? What are the required documents aside from the Past Performance Questionnaire? The only attachments I have are the Statement of Work, C2 WD 1977-0827 Rev 81, and the Past Performance Questionnaire.
Answer: there is no portal to submit your application. Everything must be submitted via email to megan.acord@usda.gov by 30 November 2026 at 12:00 PM Mountain Time.
Please read the solicitation instructions for submission requirements.
Question: Is there any permissible arrangement under which Normal New Inc. could serve as the prime contractor while a fully licensed subcontractor performs all regulated pesticide application and treatment activities?
Answer: No.
Question: If the prime contractor must independently hold the California pest control business license, would obtaining the required licensing before contract award satisfy the solicitation requirements, or must the licensing be in place at the time of quotation submission?
Answer: Must be licensed at the time of quotation submission.