Questions and Answers.xlsx
XLSX spreadsheet 11 KB Posted
- Solicitation number
- 12760420Q0025
- Issued by
-
Department of Agriculture Forest Service
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Request for Quote.docx | DOCX document | |
| Bill of Materials.XLSX | XLSX spreadsheet | |
| Sacramento Peak - Specification Package 3 Final - 03302019.pdf | ||
| Sacramento Peak Preliminary Design Drawing Final 03302019.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| QUESTION | ANSWERS |
| 1. HVAC - We do not find a reference in the specs or on the drawings to the required size of HVAC unit. Section 23 00 01 paragraph 2.2 A states that we are to refer to paragraph 3.7 section 01 11 00 for details, however paragraph 3.7 of 01 11 00 refers caulking and painting of the existing shelter and does not reference any HVAC specs. | Intent is to replace the old unit currently installed. |
| 2. Is it possible to schedule an on-site pre bid visit to determine the extent of work required? | Sure. We're free just about any time. Any requests for site visits should be made with a POC submitted to the contracting officer and the local technician will coordinate access. |
| 3. Will you be able to provide a Davis Bacon wage determination applicable to this project? | 1.7 D. The work shall be performed in compliance with Prevailing Labor Laws and Wage Rates. Davis-Bacon Act WD # NM20200025 is the current WD for Otero Co. |
| 4. Other than electrical inspections, do you anticipate any other local jurisdiction permits or inspections? | None that we are aware of. |
| 5. Paragraph 3.7 radio shelter remediation calls for sealing and painting, are we to include exterior painting only? | Inside and outside. |
| 6. There is no mention of any roof repair required, is that excluded from this solicitation? | Is is not included in this request. |
| 7. If we determine the pipe wall thickness on the existing fence is too thin, can we substitute a Harger or equivalent pipe ground clamp in lieu of exothermic welded leads? | The requirement is for exothermis welds and permanent. |
| 8. I assume we are to incorporate all grounding recommendations / requirements from the Lyncole audit report, including items such as bus bars, air terminals, etc? | Yes. Grounding should be to recommended design. |
| 9. In the Lyncole report there is mention of a battery rack (page 6). Are we responsible for relocating, modifying or replacing this rack? | Batteries and rack in generator room are to be removed and not replaced. |
| 10. The Lyncole audit report calls for XIT K2-6-60CS straight shaft chemical ground rods. If our grounding system design allows for “L” shaped rods can we utilize them to save the cost of drilling? | As long as that solution meets or exceeds the resistance aspects as straight shaft. |
| 11. Is there a geotechnical soils report available for this site? It would be helpful to estimate the cost of trenching. | None other than the existing Lincole testing. Trenching estimates should be done during site visit. |
| 12. I do not see a requirement to furnish and install replacement interior RF jumpers but assume this will be required due to replacement of the cable tray and relocation / configuration of the equipment racks. Typically we would use LMR400 cable for these jumpers, is this acceptable? | Yes and LMR 400 is acceptable. |
| 13. Do we need to perform any grounding, cleanup, etc inside the generator room of the existing shelter? | Not needed in the generator room. |
| 14. Do we need to provide PDUs (power distribution units aka power strips) in any of the racks | No |
| 15. The drawing asks for 72” tall equipment racks while the plans ask for 84”. Which way would you like to go? | 72 Inch equipment racks. |
| Do we need to provide a bid bond or payment and performance bonds? | yes, bonds are required |
File details come from the government source that posted it. Updated .