12639526Q0038-0001.pdf

PDF 6 MB Posted

Attached to
Replacement of Boilers, Reheat Coils, and Cooling Tower
Solicitation number
12639526Q0038
Issued by

About this file

This is an Amendment to a federal solicitation (Amendment 0001) issued by the USDA APHIS on February 5, 2026, with an effective date of February 11, 2026. The amendment modifies solicitation number 12639526Q0038 and is administered by APHIS-MN-126395 in Minneapolis, Minnesota. The amendment incorporates construction drawings into the solicitation for a major equipment replacement project at the USDA AMS Cotton and Tobacco Headquarters Building located at 3725 Appling Road, Memphis, Tennessee.

The amendment includes 14 pages of detailed architectural and engineering drawings prepared by Fanning, Fanning & Associates Consulting Engineers dated April 24, 2023. The drawings encompass mechanical systems (penthouse floor plans, warehouse floor plans, chilled water piping diagrams, steam piping diagrams, and mechanical schedules and details) and electrical systems (demolition and new electrical power floor plans for both main and warehouse areas, including air compressor room enlarged plans). The drawings reference a Bid Package Schedule for USDA AMS Cotton and Tobacco HQ in Memphis, Tennessee, and include specifications for equipment such as chillers, cooling towers, steam boilers, pumps, and plate heat exchangers. Offerors must acknowledge receipt of this amendment prior to the specified bid opening date and time, or their offers may be rejected.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

12639526Q0038 x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

APHIS-MN-126395

MINNEAPOLIS MN 55401

SUITE410

250 MARQUETTE AVE

USDA APHIS

02/11/20260001

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

02/05/2026

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

This amendment is written to incorporate drawings into the solicitation. See subsequent pages.

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

JAMES G. ROLOFF

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

02/11/2026

U S

D A

A M

S M

E M

P H

IS

M A

J O

R E

Q U

IP

M

E N

T R

E P

L A

C E

M E

N T

C O

T T

O N

A N

D T

O B

A C

C O

H E

A D

Q U

A R

T E

R S

B U

IL

D

IN

G

A P

P L

IN

G R

O A

D

M E

M P

H

IS

T

E N

N E

S S

E E

ISSUING OFFICE:

NO DESCRIPTIONDATE

PROJECT NO:

KEY PLAN

LUBBOCK 22025

654321

654321

A

B

C

D

E

1 100% Construction Documents

F A

N N

IN

G

F

A N

N

IN

G

A S

S O

C

IA

T E

S

L U

B B

O C

K

T E

X A

S

(8

-2 th

S T

R E

E T

C O

N S

U L T

IN

G

E N

G

IN

E E

R S

04/24/2023

SC

OTT M. FANNIN

G

R E

G

IS

TERED ENGI N

E E

R

N o. 21312

C O M M E R C E

S T

A

TE

OF TENNESS

E E

AGRICULTURE

04/24/2023

M001

PENTHOUSE PLAN - MECHANICAL DEMOLITION

NORTH

MECHANICAL

PENTHOUSE

FLOOR PLAN - DEMOLITION

BID PACKAGE SCHEDULE - USDA AMS COTTON AND TOBACCO HQ, MEMPHIS, TN.

12639523R0014, Attachment 3

B-1

D A

A M

S M

E M

P H

IS

M A

J O

R E

Q U

IP

M

E N

T R

E P

L A

C E

M E

N T

C O

T T

O N

A N

D T

O B

A C

C O

H E

A D

Q U

A R

T E

R S

B U

IL

D

IN

G

A P

P L

IN

G R

O A

D

M E

M P

H

IS

T

E N

N E

S S

E E

ISSUING OFFICE:

NO DESCRIPTIONDATE

PROJECT NO:

KEY PLAN

LUBBOCK 22025

654321

654321

A

B

C

D

E

1 100% Construction Documents

F A

N N

IN

G

F

A N

N

IN

G

A S

S O

C

IA

T E

S

L U

B B

O C

K

T E

X A

S

(8

-2 th

S T

R E

E T

C O

N S

U L T

IN

G

E N

G

IN

E E

R S

04/24/2023

AIR LOCK

AIR LOCK

STORAGE

AIR

COMPRESSOR

ROOM

SC

OTT M. FANNIN

G

R E

G

IS

TERED ENGI N

E E

R

N o. 21312

C O M M E R C E

S T

A

TE

OF TENNESS

E E

AGRICULTURE

04/24/2023

M002

PARTIAL FLOOR PLAN AT WEST DOCK

NORTH

MECHANICAL

DEMOLITION

FIRST FLOOR PLAN

PARTIAL FIRST FLOOR PLAN - MECHANICAL DEMOLITION

NORTH

COMPRESSOR ROOM

CORRIDOR

CLASSING

LAB #2

BALE PRESS

VESTIBULE

STANDARDIZATION

&ENGINEERING

DIVISION

STANDARDS

PREPARATION

LABORATORY

DIVISON

DIRECTOR

ASSISTANT

DIVISON

DIRECTOR

STANDARDS

TESTING

LABORATORY

SHIPPING

RECEIVING

BREAKROOM

MEN

VESTIBULE

FOYER

JANITOR

WOMEN

VESTIBULE

AIR LOCK

BID PACKAGE SCHEDULE - USDA AMS COTTON AND TOBACCO HQ, MEMPHIS, TN.

D A

A M

S M

E M

P H

IS

M A

J O

R E

Q U

IP

M

E N

T R

E P

L A

C E

M E

N T

C O

T T

O N

A N

D T

O B

A C

C O

H E

A D

Q U

A R

T E

R S

B U

IL

D

IN

G

A P

P L

IN

G R

O A

D

M E

M P

H

IS

T

E N

N E

S S

E E

ISSUING OFFICE:

NO DESCRIPTIONDATE

PROJECT NO:

KEY PLAN

LUBBOCK 22025

654321

654321

A

B

C

D

E

1 100% Construction Documents

F A

N N

IN

G

F

A N

N

IN

G

A S

S O

C

IA

T E

S

L U

B B

O C

K

T E

X A

S

(8

-2 th

S T

R E

E T

C O

N S

U L T

IN

G

E N

G

IN

E E

R S

04/24/2023

SC

OTT M. FANNIN

G

R E

G

IS

TERED ENGI N

E E

R

N o. 21312

C O M M E R C E

S T

A

TE

OF TENNESS

E E

AGRICULTURE

04/24/2023

M003

MECHANICAL

CHILLED WATER

PIPING DIAGRAM

DEMOLITION

CHILLED AND CONDENSER WATER PIPING DIAGRAM

NOT TO SCALE DEMOLITION

D A

A M

S M

E M

P H

IS

M A

J O

R E

Q U

IP

M

E N

T R

E P

L A

C E

M E

N T

C O

T T

O N

A N

D T

O B

A C

C O

H E

A D

Q U

A R

T E

R S

B U

IL

D

IN

G

A P

P L

IN

G R

O A

D

M E

M P

H

IS

T

E N

N E

S S

E E

ISSUING OFFICE:

NO DESCRIPTIONDATE

PROJECT NO:

KEY PLAN

LUBBOCK 22025

654321

654321

A

B

C

D

E

1 100% Construction Documents

F A

N N

IN

G

F

A N

N

IN

G

A S

S O

C

IA

T E

S

L U

B B

O C

K

T E

X A

S

(8

-2 th

S T

R E

E T

C O

N S

U L T

IN

G

E N

G

IN

E E

R S

04/24/2023

SC

OTT M. FANNIN

G

R E

G

IS

TERED ENGI N

E E

R

N o. 21312

C O M M E R C E

S T

A

TE

OF TENNESS

E E

AGRICULTURE

04/24/2023

M004

MECHANICAL

STEAM PIPING

DIAGRAM

DEMOLITION

D A

A M

S M

E M

P H

IS

M A

J O

R E

Q U

IP

M

E N

T R

E P

L A

C E

M E

N T

C O

T T

O N

A N

D T

O B

A C

C O

H E

A D

Q U

A R

T E

R S

B U

IL

D

IN

G

A P

P L

IN

G R

O A

D

M E

M P

H

IS

T

E N

N E

S S

E E

ISSUING OFFICE:

NO DESCRIPTIONDATE

PROJECT NO:

KEY PLAN

LUBBOCK 22025

654321

654321

A

B

C

D

E

1 100% Construction Documents

F A

N N

IN

G

F

A N

N

IN

G

A S

S O

C

IA

T E

S

L U

B B

O C

K

T E

X A

S

(8

-2 th

S T

R E

E T

C O

N S

U L T

IN

G

E N

G

IN

E E

R S

04/24/2023

SC

OTT M. FANNIN

G

R E

G

IS

TERED ENGI N

E E

R

N o. 21312

C O M M E R C E

S T

A

TE

OF TENNESS

E E

AGRICULTURE

04/24/2023

M101

PENTHOUSE FLOOR PLAN - MECHANICAL

NORTH

MECHANICAL

PENTHOUSE

FLOOR PLAN

D A

A M

S M

E M

P H

IS

M A

J O

R E

Q U

IP

M

E N

T R

E P

L A

C E

M E

N T

C O

T T

O N

A N

D T

O B

A C

C O

H E

A D

Q U

A R

T E

R S

B U

IL

D

IN

G

A P

P L

IN

G R

O A

D

M E

M P

H

IS

T

E N

N E

S S

E E

ISSUING OFFICE:

NO DESCRIPTIONDATE

PROJECT NO:

KEY PLAN

LUBBOCK 22025

654321

654321

A

B

C

D

E

1 100% Construction Documents

F A

N N

IN

G

F

A N

N

IN

G

A S

S O

C

IA

T E

S

L U

B B

O C

K

T E

X A

S

(8

-2 th

S T

R E

E T

C O

N S

U L T

IN

G

E N

G

IN

E E

R S

04/24/2023

SC

OTT M. FANNIN

G

R E

G

IS

TERED ENGI N

E E

R

N o. 21312

C O M M E R C E

S T

A

TE

OF TENNESS

E E

AGRICULTURE

04/24/2023

M102

AIR COMPRESSOR ROOM PLAN

NORTH

MECHANICAL

WAREHOUSE

FLOOR PLAN

WAREHOUSE FLOOR PLAN - MECHANICAL

NORTH

CORRIDOR

CLASSING

LAB #2

BALE PRESS

VESTIBULE

STANDARDIZATION

&ENGINEERING

DIVISION

STANDARDS

PREPARATION

LABORATORY

DIVISON

DIRECTOR

ASSISTANT

DIVISON

DIRECTOR

STANDARDS

TESTING

LABORATORY

SHIPPING

RECEIVING

BREAKROOM

MEN

VESTIBULE

FOYER

JANITOR

WOMEN

VESTIBULE

AIR LOCK

ELECTRICAL

ROOM ABOVE

AIR LOCK

AIR LOCK

STORAGE

AIR

COMPRESSOR

ROOM

D A

A M

S M

E M

P H

IS

M A

J O

R E

Q U

IP

M

E N

T R

E P

L A

C E

M E

N T

C O

T T

O N

A N

D T

O B

A C

C O

H E

A D

Q U

A R

T E

R S

B U

IL

D

IN

G

A P

P L

IN

G R

O A

D

M E

M P

H

IS

T

E N

N E

S S

E E

ISSUING OFFICE:

NO DESCRIPTIONDATE

PROJECT NO:

KEY PLAN

LUBBOCK 22025

654321

654321

A

B

C

D

E

1 100% Construction Documents

F A

N N

IN

G

F

A N

N

IN

G

A S

S O

C

IA

T E

S

L U

B B

O C

K

T E

X A

S

(8

-2 th

S T

R E

E T

C O

N S

U L T

IN

G

E N

G

IN

E E

R S

04/24/2023

SC

OTT M. FANNIN

G

R E

G

IS

TERED ENGI N

E E

R

N o. 21312

C O M M E R C E

S T

A

TE

OF TENNESS

E E

AGRICULTURE

04/24/2023

MECHANICAL

SCHEDULES

AND DETAILS

M103

CHILLED AND CONDENSER WATER SEQUENCE OF OPERATION - EXISTING, REFERENCE ONLY

LEGEND

CONDENSER WATER PIPING DIAGRAM

CHILLED WATER PIPING DIAGRAM

TYPICAL TRAP PIPING

GAS TRAIN DETAIL (IRI)

MECHANICAL PIPING SYMBOL SCHEDULE

CHILLED AND CONDENSER WATER VALVE SCHEDULE

PLATE & FRAME HEAT EXCHANGER DETAIL

RE-ENABLE SEQUENCES UNDER BID PACKAGES

D A

A M

S M

E M

P H

IS

M A

J O

R E

Q U

IP

M

E N

T R

E P

L A

C E

M E

N T

C O

T T

O N

A N

D T

O B

A C

C O

H E

A D

Q U

A R

T E

R S

B U

IL

D

IN

G

A P

P L

IN

G R

O A

D

M E

M P

H

IS

T

E N

N E

S S

E E

ISSUING OFFICE:

NO DESCRIPTIONDATE

PROJECT NO:

KEY PLAN

LUBBOCK 22025

654321

654321

A

B

C

D

E

1 100% Construction Documents

F A

N N

IN

G

F

A N

N

IN

G

A S

S O

C

IA

T E

S

L U

B B

O C

K

T E

X A

S

(8

-2 th

S T

R E

E T

C O

N S

U L T

IN

G

E N

G

IN

E E

R S

04/24/2023

SC

OTT M. FANNIN

G

R E

G

IS

TERED ENGI N

E E

R

N o. 21312

C O M M E R C E

S T

A

TE

OF TENNESS

E E

AGRICULTURE

04/24/2023

M104

MECHANICAL

STEAM PIPING

DIAGRAM

D A

A M

S M

E M

P H

IS

M A

J O

R E

Q U

IP

M

E N

T R

E P

L A

C E

M E

N T

C O

T T

O N

A N

D T

O B

A C

C O

H E

A D

Q U

A R

T E

R S

B U

IL

D

IN

G

A P

P L

IN

G R

O A

D

M E

M P

H

IS

T

E N

N E

S S

E E

ISSUING OFFICE:

NO DESCRIPTIONDATE

PROJECT NO:

KEY PLAN

LUBBOCK 22025

654321

654321

A

B

C

D

E

1 100% Construction Documents

F A

N N

IN

G

F

A N

N

IN

G

A S

S O

C

IA

T E

S

L U

B B

O C

K

T E

X A

S

(8

-2 th

S T

R E

E T

C O

N S

U L T

IN

G

E N

G

IN

E E

R S

04/24/2023

SC

OTT M. FANNIN

G

R E

G

IS

TERED ENGI N

E E

R

N o. 21312

C O M M E R C E

S T

A

TE

OF TENNESS

E E

AGRICULTURE

04/24/2023

PLATE HEAT EXCHANGER SCHEDULE

COOLING TOWER SCHEDULE

STEAM BOILER SCHEDULE

CHILLER SCHEDULE

M201

MECHANICAL

SCHEDULES

AND DETAILS

PUMP SCHEDULE

D A

A M

S M

E M

P H

IS

M A

J O

R E

Q U

IP

M

E N

T R

E P

L A

C E

M E

N T

C O

T T

O N

A N

D T

O B

A C

C O

H E

A D

Q U

A R

T E

R S

B U

IL

D

IN

G

A P

P L

IN

G R

O A

D

M E

M P

H

IS

T

E N

N E

S S

E E

ISSUING OFFICE:

NO DESCRIPTIONDATE

PROJECT NO:

KEY PLAN

LUBBOCK 22025

654321

654321

A

B

C

D

E

1 100% Construction Documents

F A

N N

IN

G

F

A N

N

IN

G

A S

S O

C

IA

T E

S

L U

B B

O C

K

T E

X A

S

(8

-2 th

S T

R E

E T

C O

N S

U L T

IN

G

E N

G

IN

E E

R S

04/24/2023

SC

OTT M. FANNIN

G

R E

G

IS

TERED ENGI N

E E

R

N o. 21312

C O M M E R C E

S T

A

TE

OF TENNESS

E E

AGRICULTURE

04/24/2023

E101

DEMOLITION FLOOR PLAN - ELECTRICAL POWER

ELECTRICAL

POWER

DEMOLITION

FLOOR PLAN

NORTH

SCALE 1/4" = 1'0"

D A

A M

S M

E M

P H

IS

M A

J O

R E

Q U

IP

M

E N

T R

E P

L A

C E

M E

N T

C O

T T

O N

A N

D T

O B

A C

C O

H E

A D

Q U

A R

T E

R S

B U

IL

D

IN

G

A P

P L

IN

G R

O A

D

M E

M P

H

IS

T

E N

N E

S S

E E

ISSUING OFFICE:

NO DESCRIPTIONDATE

PROJECT NO:

KEY PLAN

LUBBOCK 22025

654321

654321

A

B

C

D

E

1 100% Construction Documents

F A

N N

IN

G

F

A N

N

IN

G

A S

S O

C

IA

T E

S

L U

B B

O C

K

T E

X A

S

(8

-2 th

S T

R E

E T

C O

N S

U L T

IN

G

E N

G

IN

E E

R S

04/24/2023

AIR LOCK

AIR LOCK

STORAGE

AIR

COMPRESSOR

ROOM

SC

OTT M. FANNIN

G

R E

G

IS

TERED ENGI N

E E

R

N o. 21312

C O M M E R C E

S T

A

TE

OF TENNESS

E E

AGRICULTURE

04/24/2023

CORRIDOR

CLASSING

LAB #2

BALE PRESS

VESTIBULE

STANDARDIZATION

&ENGINEERING

DIVISION

STANDARDS

PREPARATION

LABORATORY

DIVISON

DIRECTOR

ASSISTANT

DIVISON

DIRECTOR

STANDARDS

TESTING

LABORATORY

SHIPPING

RECEIVING

BREAKROOM

MEN

VESTIBULE

FOYER

JANITOR

WOMEN

VESTIBULE

AIR LOCK

E102

AIR COMPRESSOR ROOM ENLARGED PLAN

NORTH

ELECTRICAL

POWER

DEMOLITION

FLOOR PLAN

WAREHOUSE POWER FLOOR PLAN - ELECTRICAL DEMOLITION

NORTH

D A

A M

S M

E M

P H

IS

M A

J O

R E

Q U

IP

M

E N

T R

E P

L A

C E

M E

N T

C O

T T

O N

A N

D T

O B

A C

C O

H E

A D

Q U

A R

T E

R S

B U

IL

D

IN

G

A P

P L

IN

G R

O A

D

M E

M P

H

IS

T

E N

N E

S S

E E

ISSUING OFFICE:

NO DESCRIPTIONDATE

PROJECT NO:

KEY PLAN

LUBBOCK 22025

654321

654321

A

B

C

D

E

1 100% Construction Documents

F A

N N

IN

G

F

A N

N

IN

G

A S

S O

C

IA

T E

S

L U

B B

O C

K

T E

X A

S

(8

-2 th

S T

R E

E T

C O

N S

U L T

IN

G

E N

G

IN

E E

R S

04/24/2023

SC

OTT M. FANNIN

G

R E

G

IS

TERED ENGI N

E E

R

N o. 21312

C O M M E R C E

S T

A

TE

OF TENNESS

E E

AGRICULTURE

04/24/2023

E201

DEMOLITION FLOOR PLAN - ELECTRICAL POWER

NEW

ELECTRICAL

POWER

FLOOR PLAN

NORTH

SCALE 1/4" = 1'0"

D A

A M

S M

E M

P H

IS

M A

J O

R E

Q U

IP

M

E N

T R

E P

L A

C E

M E

N T

C O

T T

O N

A N

D T

O B

A C

C O

H E

A D

Q U

A R

T E

R S

B U

IL

D

IN

G

A P

P L

IN

G R

O A

D

M E

M P

H

IS

T

E N

N E

S S

E E

ISSUING OFFICE:

NO DESCRIPTIONDATE

PROJECT NO:

KEY PLAN

LUBBOCK 22025

654321

654321

A

B

C

D

E

1 100% Construction Documents

F A

N N

IN

G

F

A N

N

IN

G

A S

S O

C

IA

T E

S

L U

B B

O C

K

T E

X A

S

(8

-2 th

S T

R E

E T

C O

N S

U L T

IN

G

E N

G

IN

E E

R S

04/24/2023

AIR LOCK

AIR LOCK

STORAGE

AIR

COMPRESSOR

ROOM

SC

OTT M. FANNIN

G

R E

G

IS

TERED ENGI N

E E

R

N o. 21312

C O M M E R C E

S T

A

TE

OF TENNESS

E E

AGRICULTURE

04/24/2023

CORRIDOR

CLASSING

LAB #2

BALE PRESS

VESTIBULE

STANDARDIZATION

&ENGINEERING

DIVISION

STANDARDS

PREPARATION

LABORATORY

DIVISON

DIRECTOR

ASSISTANT

DIVISON

DIRECTOR

STANDARDS

TESTING

LABORATORY

SHIPPING

RECEIVING

BREAKROOM

MEN

VESTIBULE

FOYER

JANITOR

WOMEN

VESTIBULE

AIR LOCK

E202

AIR COMPRESSOR ROOM ENLARGED PLAN

NORTH

NEW

ELECTRICAL

POWER

FLOOR PLAN

WAREHOUSE POWER FLOOR PLAN - ELECTRICAL DEMOLITION

NORTH

Drawings boiler, coils, cooling tower.pdf
M001.pdf
M002.pdf
M003.pdf
M004.pdf
M101.pdf
M102.pdf
M103.pdf
M104.pdf
M201.pdf
M202.pdf
E101.pdf
E102.pdf
E201.pdf
E202.pdf
2026-02-11T10:00:17-0600
JAMES ROLOFF

File details come from the government source that posted it. Updated .