12639526Q0038-0001.pdf
PDF 6 MB Posted
- Solicitation number
- 12639526Q0038
About this file
This is an Amendment to a federal solicitation (Amendment 0001) issued by the USDA APHIS on February 5, 2026, with an effective date of February 11, 2026. The amendment modifies solicitation number 12639526Q0038 and is administered by APHIS-MN-126395 in Minneapolis, Minnesota. The amendment incorporates construction drawings into the solicitation for a major equipment replacement project at the USDA AMS Cotton and Tobacco Headquarters Building located at 3725 Appling Road, Memphis, Tennessee.
The amendment includes 14 pages of detailed architectural and engineering drawings prepared by Fanning, Fanning & Associates Consulting Engineers dated April 24, 2023. The drawings encompass mechanical systems (penthouse floor plans, warehouse floor plans, chilled water piping diagrams, steam piping diagrams, and mechanical schedules and details) and electrical systems (demolition and new electrical power floor plans for both main and warehouse areas, including air compressor room enlarged plans). The drawings reference a Bid Package Schedule for USDA AMS Cotton and Tobacco HQ in Memphis, Tennessee, and include specifications for equipment such as chillers, cooling towers, steam boilers, pumps, and plate heat exchangers. Offerors must acknowledge receipt of this amendment prior to the specified bid opening date and time, or their offers may be rejected.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFIs and Responses.docx | DOCX document | |
| Contractor walkthrough sign in sheet.pdf | ||
| Combined synopsis-solicitation_12639526Q0038.docx | DOCX document | |
| Attachment 2_Federal Construction Wage Rates_Shelby County.txt | TXT text file | |
| Attachment 1_SOW_replace boiler_tower_coils.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
12639526Q0038 x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
APHIS-MN-126395
MINNEAPOLIS MN 55401
SUITE410
250 MARQUETTE AVE
USDA APHIS
02/11/20260001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
02/05/2026
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
This amendment is written to incorporate drawings into the solicitation. See subsequent pages.
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
JAMES G. ROLOFF
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
02/11/2026
U S
D A
A M
S M
E M
P H
IS
M A
J O
R E
Q U
IP
M
E N
T R
E P
L A
C E
M E
N T
C O
T T
O N
A N
D T
O B
A C
C O
H E
A D
Q U
A R
T E
R S
B U
IL
D
IN
G
A P
P L
IN
G R
O A
D
M E
M P
H
IS
T
E N
N E
S S
E E
ISSUING OFFICE:
NO DESCRIPTIONDATE
PROJECT NO:
KEY PLAN
LUBBOCK 22025
654321
654321
A
B
C
D
E
1 100% Construction Documents
F A
N N
IN
G
F
A N
N
IN
G
A S
S O
C
IA
T E
S
L U
B B
O C
K
T E
X A
S
(8
-2 th
S T
R E
E T
C O
N S
U L T
IN
G
E N
G
IN
E E
R S
04/24/2023
SC
OTT M. FANNIN
G
R E
G
IS
TERED ENGI N
E E
R
N o. 21312
C O M M E R C E
S T
A
TE
OF TENNESS
E E
AGRICULTURE
04/24/2023
M001
PENTHOUSE PLAN - MECHANICAL DEMOLITION
NORTH
MECHANICAL
PENTHOUSE
FLOOR PLAN - DEMOLITION
BID PACKAGE SCHEDULE - USDA AMS COTTON AND TOBACCO HQ, MEMPHIS, TN.
12639523R0014, Attachment 3
B-1
D A
A M
S M
E M
P H
IS
M A
J O
R E
Q U
IP
M
E N
T R
E P
L A
C E
M E
N T
C O
T T
O N
A N
D T
O B
A C
C O
H E
A D
Q U
A R
T E
R S
B U
IL
D
IN
G
A P
P L
IN
G R
O A
D
M E
M P
H
IS
T
E N
N E
S S
E E
ISSUING OFFICE:
NO DESCRIPTIONDATE
PROJECT NO:
KEY PLAN
LUBBOCK 22025
654321
654321
A
B
C
D
E
1 100% Construction Documents
F A
N N
IN
G
F
A N
N
IN
G
A S
S O
C
IA
T E
S
L U
B B
O C
K
T E
X A
S
(8
-2 th
S T
R E
E T
C O
N S
U L T
IN
G
E N
G
IN
E E
R S
04/24/2023
AIR LOCK
AIR LOCK
STORAGE
AIR
COMPRESSOR
ROOM
SC
OTT M. FANNIN
G
R E
G
IS
TERED ENGI N
E E
R
N o. 21312
C O M M E R C E
S T
A
TE
OF TENNESS
E E
AGRICULTURE
04/24/2023
M002
PARTIAL FLOOR PLAN AT WEST DOCK
NORTH
MECHANICAL
DEMOLITION
FIRST FLOOR PLAN
PARTIAL FIRST FLOOR PLAN - MECHANICAL DEMOLITION
NORTH
COMPRESSOR ROOM
CORRIDOR
CLASSING
LAB #2
BALE PRESS
VESTIBULE
STANDARDIZATION
&ENGINEERING
DIVISION
STANDARDS
PREPARATION
LABORATORY
DIVISON
DIRECTOR
ASSISTANT
DIVISON
DIRECTOR
STANDARDS
TESTING
LABORATORY
SHIPPING
RECEIVING
BREAKROOM
MEN
VESTIBULE
FOYER
JANITOR
WOMEN
VESTIBULE
AIR LOCK
BID PACKAGE SCHEDULE - USDA AMS COTTON AND TOBACCO HQ, MEMPHIS, TN.
D A
A M
S M
E M
P H
IS
M A
J O
R E
Q U
IP
M
E N
T R
E P
L A
C E
M E
N T
C O
T T
O N
A N
D T
O B
A C
C O
H E
A D
Q U
A R
T E
R S
B U
IL
D
IN
G
A P
P L
IN
G R
O A
D
M E
M P
H
IS
T
E N
N E
S S
E E
ISSUING OFFICE:
NO DESCRIPTIONDATE
PROJECT NO:
KEY PLAN
LUBBOCK 22025
654321
654321
A
B
C
D
E
1 100% Construction Documents
F A
N N
IN
G
F
A N
N
IN
G
A S
S O
C
IA
T E
S
L U
B B
O C
K
T E
X A
S
(8
-2 th
S T
R E
E T
C O
N S
U L T
IN
G
E N
G
IN
E E
R S
04/24/2023
SC
OTT M. FANNIN
G
R E
G
IS
TERED ENGI N
E E
R
N o. 21312
C O M M E R C E
S T
A
TE
OF TENNESS
E E
AGRICULTURE
04/24/2023
M003
MECHANICAL
CHILLED WATER
PIPING DIAGRAM
DEMOLITION
CHILLED AND CONDENSER WATER PIPING DIAGRAM
NOT TO SCALE DEMOLITION
D A
A M
S M
E M
P H
IS
M A
J O
R E
Q U
IP
M
E N
T R
E P
L A
C E
M E
N T
C O
T T
O N
A N
D T
O B
A C
C O
H E
A D
Q U
A R
T E
R S
B U
IL
D
IN
G
A P
P L
IN
G R
O A
D
M E
M P
H
IS
T
E N
N E
S S
E E
ISSUING OFFICE:
NO DESCRIPTIONDATE
PROJECT NO:
KEY PLAN
LUBBOCK 22025
654321
654321
A
B
C
D
E
1 100% Construction Documents
F A
N N
IN
G
F
A N
N
IN
G
A S
S O
C
IA
T E
S
L U
B B
O C
K
T E
X A
S
(8
-2 th
S T
R E
E T
C O
N S
U L T
IN
G
E N
G
IN
E E
R S
04/24/2023
SC
OTT M. FANNIN
G
R E
G
IS
TERED ENGI N
E E
R
N o. 21312
C O M M E R C E
S T
A
TE
OF TENNESS
E E
AGRICULTURE
04/24/2023
M004
MECHANICAL
STEAM PIPING
DIAGRAM
DEMOLITION
D A
A M
S M
E M
P H
IS
M A
J O
R E
Q U
IP
M
E N
T R
E P
L A
C E
M E
N T
C O
T T
O N
A N
D T
O B
A C
C O
H E
A D
Q U
A R
T E
R S
B U
IL
D
IN
G
A P
P L
IN
G R
O A
D
M E
M P
H
IS
T
E N
N E
S S
E E
ISSUING OFFICE:
NO DESCRIPTIONDATE
PROJECT NO:
KEY PLAN
LUBBOCK 22025
654321
654321
A
B
C
D
E
1 100% Construction Documents
F A
N N
IN
G
F
A N
N
IN
G
A S
S O
C
IA
T E
S
L U
B B
O C
K
T E
X A
S
(8
-2 th
S T
R E
E T
C O
N S
U L T
IN
G
E N
G
IN
E E
R S
04/24/2023
SC
OTT M. FANNIN
G
R E
G
IS
TERED ENGI N
E E
R
N o. 21312
C O M M E R C E
S T
A
TE
OF TENNESS
E E
AGRICULTURE
04/24/2023
M101
PENTHOUSE FLOOR PLAN - MECHANICAL
NORTH
MECHANICAL
PENTHOUSE
FLOOR PLAN
D A
A M
S M
E M
P H
IS
M A
J O
R E
Q U
IP
M
E N
T R
E P
L A
C E
M E
N T
C O
T T
O N
A N
D T
O B
A C
C O
H E
A D
Q U
A R
T E
R S
B U
IL
D
IN
G
A P
P L
IN
G R
O A
D
M E
M P
H
IS
T
E N
N E
S S
E E
ISSUING OFFICE:
NO DESCRIPTIONDATE
PROJECT NO:
KEY PLAN
LUBBOCK 22025
654321
654321
A
B
C
D
E
1 100% Construction Documents
F A
N N
IN
G
F
A N
N
IN
G
A S
S O
C
IA
T E
S
L U
B B
O C
K
T E
X A
S
(8
-2 th
S T
R E
E T
C O
N S
U L T
IN
G
E N
G
IN
E E
R S
04/24/2023
SC
OTT M. FANNIN
G
R E
G
IS
TERED ENGI N
E E
R
N o. 21312
C O M M E R C E
S T
A
TE
OF TENNESS
E E
AGRICULTURE
04/24/2023
M102
AIR COMPRESSOR ROOM PLAN
NORTH
MECHANICAL
WAREHOUSE
FLOOR PLAN
WAREHOUSE FLOOR PLAN - MECHANICAL
NORTH
CORRIDOR
CLASSING
LAB #2
BALE PRESS
VESTIBULE
STANDARDIZATION
&ENGINEERING
DIVISION
STANDARDS
PREPARATION
LABORATORY
DIVISON
DIRECTOR
ASSISTANT
DIVISON
DIRECTOR
STANDARDS
TESTING
LABORATORY
SHIPPING
RECEIVING
BREAKROOM
MEN
VESTIBULE
FOYER
JANITOR
WOMEN
VESTIBULE
AIR LOCK
ELECTRICAL
ROOM ABOVE
AIR LOCK
AIR LOCK
STORAGE
AIR
COMPRESSOR
ROOM
D A
A M
S M
E M
P H
IS
M A
J O
R E
Q U
IP
M
E N
T R
E P
L A
C E
M E
N T
C O
T T
O N
A N
D T
O B
A C
C O
H E
A D
Q U
A R
T E
R S
B U
IL
D
IN
G
A P
P L
IN
G R
O A
D
M E
M P
H
IS
T
E N
N E
S S
E E
ISSUING OFFICE:
NO DESCRIPTIONDATE
PROJECT NO:
KEY PLAN
LUBBOCK 22025
654321
654321
A
B
C
D
E
1 100% Construction Documents
F A
N N
IN
G
F
A N
N
IN
G
A S
S O
C
IA
T E
S
L U
B B
O C
K
T E
X A
S
(8
-2 th
S T
R E
E T
C O
N S
U L T
IN
G
E N
G
IN
E E
R S
04/24/2023
SC
OTT M. FANNIN
G
R E
G
IS
TERED ENGI N
E E
R
N o. 21312
C O M M E R C E
S T
A
TE
OF TENNESS
E E
AGRICULTURE
04/24/2023
MECHANICAL
SCHEDULES
AND DETAILS
M103
CHILLED AND CONDENSER WATER SEQUENCE OF OPERATION - EXISTING, REFERENCE ONLY
LEGEND
CONDENSER WATER PIPING DIAGRAM
CHILLED WATER PIPING DIAGRAM
TYPICAL TRAP PIPING
GAS TRAIN DETAIL (IRI)
MECHANICAL PIPING SYMBOL SCHEDULE
CHILLED AND CONDENSER WATER VALVE SCHEDULE
PLATE & FRAME HEAT EXCHANGER DETAIL
RE-ENABLE SEQUENCES UNDER BID PACKAGES
D A
A M
S M
E M
P H
IS
M A
J O
R E
Q U
IP
M
E N
T R
E P
L A
C E
M E
N T
C O
T T
O N
A N
D T
O B
A C
C O
H E
A D
Q U
A R
T E
R S
B U
IL
D
IN
G
A P
P L
IN
G R
O A
D
M E
M P
H
IS
T
E N
N E
S S
E E
ISSUING OFFICE:
NO DESCRIPTIONDATE
PROJECT NO:
KEY PLAN
LUBBOCK 22025
654321
654321
A
B
C
D
E
1 100% Construction Documents
F A
N N
IN
G
F
A N
N
IN
G
A S
S O
C
IA
T E
S
L U
B B
O C
K
T E
X A
S
(8
-2 th
S T
R E
E T
C O
N S
U L T
IN
G
E N
G
IN
E E
R S
04/24/2023
SC
OTT M. FANNIN
G
R E
G
IS
TERED ENGI N
E E
R
N o. 21312
C O M M E R C E
S T
A
TE
OF TENNESS
E E
AGRICULTURE
04/24/2023
M104
MECHANICAL
STEAM PIPING
DIAGRAM
D A
A M
S M
E M
P H
IS
M A
J O
R E
Q U
IP
M
E N
T R
E P
L A
C E
M E
N T
C O
T T
O N
A N
D T
O B
A C
C O
H E
A D
Q U
A R
T E
R S
B U
IL
D
IN
G
A P
P L
IN
G R
O A
D
M E
M P
H
IS
T
E N
N E
S S
E E
ISSUING OFFICE:
NO DESCRIPTIONDATE
PROJECT NO:
KEY PLAN
LUBBOCK 22025
654321
654321
A
B
C
D
E
1 100% Construction Documents
F A
N N
IN
G
F
A N
N
IN
G
A S
S O
C
IA
T E
S
L U
B B
O C
K
T E
X A
S
(8
-2 th
S T
R E
E T
C O
N S
U L T
IN
G
E N
G
IN
E E
R S
04/24/2023
SC
OTT M. FANNIN
G
R E
G
IS
TERED ENGI N
E E
R
N o. 21312
C O M M E R C E
S T
A
TE
OF TENNESS
E E
AGRICULTURE
04/24/2023
PLATE HEAT EXCHANGER SCHEDULE
COOLING TOWER SCHEDULE
STEAM BOILER SCHEDULE
CHILLER SCHEDULE
M201
MECHANICAL
SCHEDULES
AND DETAILS
PUMP SCHEDULE
D A
A M
S M
E M
P H
IS
M A
J O
R E
Q U
IP
M
E N
T R
E P
L A
C E
M E
N T
C O
T T
O N
A N
D T
O B
A C
C O
H E
A D
Q U
A R
T E
R S
B U
IL
D
IN
G
A P
P L
IN
G R
O A
D
M E
M P
H
IS
T
E N
N E
S S
E E
ISSUING OFFICE:
NO DESCRIPTIONDATE
PROJECT NO:
KEY PLAN
LUBBOCK 22025
654321
654321
A
B
C
D
E
1 100% Construction Documents
F A
N N
IN
G
F
A N
N
IN
G
A S
S O
C
IA
T E
S
L U
B B
O C
K
T E
X A
S
(8
-2 th
S T
R E
E T
C O
N S
U L T
IN
G
E N
G
IN
E E
R S
04/24/2023
SC
OTT M. FANNIN
G
R E
G
IS
TERED ENGI N
E E
R
N o. 21312
C O M M E R C E
S T
A
TE
OF TENNESS
E E
AGRICULTURE
04/24/2023
E101
DEMOLITION FLOOR PLAN - ELECTRICAL POWER
ELECTRICAL
POWER
DEMOLITION
FLOOR PLAN
NORTH
SCALE 1/4" = 1'0"
D A
A M
S M
E M
P H
IS
M A
J O
R E
Q U
IP
M
E N
T R
E P
L A
C E
M E
N T
C O
T T
O N
A N
D T
O B
A C
C O
H E
A D
Q U
A R
T E
R S
B U
IL
D
IN
G
A P
P L
IN
G R
O A
D
M E
M P
H
IS
T
E N
N E
S S
E E
ISSUING OFFICE:
NO DESCRIPTIONDATE
PROJECT NO:
KEY PLAN
LUBBOCK 22025
654321
654321
A
B
C
D
E
1 100% Construction Documents
F A
N N
IN
G
F
A N
N
IN
G
A S
S O
C
IA
T E
S
L U
B B
O C
K
T E
X A
S
(8
-2 th
S T
R E
E T
C O
N S
U L T
IN
G
E N
G
IN
E E
R S
04/24/2023
AIR LOCK
AIR LOCK
STORAGE
AIR
COMPRESSOR
ROOM
SC
OTT M. FANNIN
G
R E
G
IS
TERED ENGI N
E E
R
N o. 21312
C O M M E R C E
S T
A
TE
OF TENNESS
E E
AGRICULTURE
04/24/2023
CORRIDOR
CLASSING
LAB #2
BALE PRESS
VESTIBULE
STANDARDIZATION
&ENGINEERING
DIVISION
STANDARDS
PREPARATION
LABORATORY
DIVISON
DIRECTOR
ASSISTANT
DIVISON
DIRECTOR
STANDARDS
TESTING
LABORATORY
SHIPPING
RECEIVING
BREAKROOM
MEN
VESTIBULE
FOYER
JANITOR
WOMEN
VESTIBULE
AIR LOCK
E102
AIR COMPRESSOR ROOM ENLARGED PLAN
NORTH
ELECTRICAL
POWER
DEMOLITION
FLOOR PLAN
WAREHOUSE POWER FLOOR PLAN - ELECTRICAL DEMOLITION
NORTH
D A
A M
S M
E M
P H
IS
M A
J O
R E
Q U
IP
M
E N
T R
E P
L A
C E
M E
N T
C O
T T
O N
A N
D T
O B
A C
C O
H E
A D
Q U
A R
T E
R S
B U
IL
D
IN
G
A P
P L
IN
G R
O A
D
M E
M P
H
IS
T
E N
N E
S S
E E
ISSUING OFFICE:
NO DESCRIPTIONDATE
PROJECT NO:
KEY PLAN
LUBBOCK 22025
654321
654321
A
B
C
D
E
1 100% Construction Documents
F A
N N
IN
G
F
A N
N
IN
G
A S
S O
C
IA
T E
S
L U
B B
O C
K
T E
X A
S
(8
-2 th
S T
R E
E T
C O
N S
U L T
IN
G
E N
G
IN
E E
R S
04/24/2023
SC
OTT M. FANNIN
G
R E
G
IS
TERED ENGI N
E E
R
N o. 21312
C O M M E R C E
S T
A
TE
OF TENNESS
E E
AGRICULTURE
04/24/2023
E201
DEMOLITION FLOOR PLAN - ELECTRICAL POWER
NEW
ELECTRICAL
POWER
FLOOR PLAN
NORTH
SCALE 1/4" = 1'0"
D A
A M
S M
E M
P H
IS
M A
J O
R E
Q U
IP
M
E N
T R
E P
L A
C E
M E
N T
C O
T T
O N
A N
D T
O B
A C
C O
H E
A D
Q U
A R
T E
R S
B U
IL
D
IN
G
A P
P L
IN
G R
O A
D
M E
M P
H
IS
T
E N
N E
S S
E E
ISSUING OFFICE:
NO DESCRIPTIONDATE
PROJECT NO:
KEY PLAN
LUBBOCK 22025
654321
654321
A
B
C
D
E
1 100% Construction Documents
F A
N N
IN
G
F
A N
N
IN
G
A S
S O
C
IA
T E
S
L U
B B
O C
K
T E
X A
S
(8
-2 th
S T
R E
E T
C O
N S
U L T
IN
G
E N
G
IN
E E
R S
04/24/2023
AIR LOCK
AIR LOCK
STORAGE
AIR
COMPRESSOR
ROOM
SC
OTT M. FANNIN
G
R E
G
IS
TERED ENGI N
E E
R
N o. 21312
C O M M E R C E
S T
A
TE
OF TENNESS
E E
AGRICULTURE
04/24/2023
CORRIDOR
CLASSING
LAB #2
BALE PRESS
VESTIBULE
STANDARDIZATION
&ENGINEERING
DIVISION
STANDARDS
PREPARATION
LABORATORY
DIVISON
DIRECTOR
ASSISTANT
DIVISON
DIRECTOR
STANDARDS
TESTING
LABORATORY
SHIPPING
RECEIVING
BREAKROOM
MEN
VESTIBULE
FOYER
JANITOR
WOMEN
VESTIBULE
AIR LOCK
E202
AIR COMPRESSOR ROOM ENLARGED PLAN
NORTH
NEW
ELECTRICAL
POWER
FLOOR PLAN
WAREHOUSE POWER FLOOR PLAN - ELECTRICAL DEMOLITION
NORTH
| Drawings boiler, coils, cooling tower.pdf |
| M001.pdf |
| M002.pdf |
| M003.pdf |
| M004.pdf |
| M101.pdf |
| M102.pdf |
| M103.pdf |
| M104.pdf |
| M201.pdf |
| M202.pdf |
| E101.pdf |
| E102.pdf |
| E201.pdf |
| E202.pdf |
| 2026-02-11T10:00:17-0600 | |
| JAMES ROLOFF |
File details come from the government source that posted it. Updated .