Qs and As resulting from second site visit.docx

DOCX document 16 KB Posted

Attached to
Electrical Distribution Upgrades, NY Animal Import Center
Solicitation number
12639522R0005
Issued by

About this file

This document contains questions and answers resulting from the second site visit for the NYAIC Electrical Distribution Upgrades Project. The project requires upgrading electrical panels and installing new panels in each building at the NY Animal Import Center. Underground service conductors and feeders do not need replacing. Closet areas can accommodate two 20-inch panels side by side. For buildings with loft areas, 9 have a 6-foot-6-inch clearance suitable for panels while 7 have a 5-foot clearance but can also accommodate the panels. National Electric Code requirements for working space, dedicated equipment space and access will be followed, with potential violations brought to the attention of the PPM and EPM.

The related federal contract opportunity is solicitation number 12639522R0005 for the Electrical Distribution Upgrades at the NY Animal Import Center through the Department of Agriculture Animal and Plant Health Inspection Service Marketing and Regulatory Programs Business Services.

View the file

Other files

File Type Posted
Qs and As number 3.docx DOCX document
Amendment 3.pdf PDF
Site Map.pdf PDF
Sol_12639522R0005_Amd_0002.pdf PDF
12639522R0005-0001.pdf PDF
Contractor Questions and Answers.pdf PDF
All_Green_Products.xls XLS spreadsheet
USDA Sustainable Buildings Implementation Plan.doc DOC document
Federal Construction Wage Determination.pdf PDF
12639522R0005.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NYAIC Electrical Distribution Upgrades Project Bidders Questions received 1/24/2022 (After Second Site Visit)

1. It was pointed out at the second site visit that the existing service conductors are underground, not overhead as one of our previous questions presumed. The government representative said they didn’t want the underground conductors replaced. Please confirm that the government does not want underground service cables replaced. Underground service conductors to remain. USDA is not requiring replacement of the underground service conductors.

2. It was pointed out at the second site visit that there is a long underground sub-panel feeder going from one end of Building 1 to the other end of building 1. The government representative said they didn’t want these underground conductors replaced. Please confirm that the government does not want underground feeder conductors to be replaced. Underground feeder conductors to remain. USDA is not requiring replacement of the underground feeder conductors.

a. Each new panel is 20” wide. Most of the electric closets are approximately 24” wide. Generally speaking, the project requires us to install two panels, side by side, in each closet. Two 20” wide panels will not fit in the existing closets. At the second site visit, it was suggested that one of the two panels be placed in a loft area. We have code concerns with putting the panel up in the loft: a. Closet areas are 24 inches deep and 48 inches wide which will accommodate two 20 inch panels side by side.

b. National Electric Code 210.26-A-3 requires a clear working space height of 2 meters (6’ 6”) high in front of the full width of the panel or 30” wide minimum (see NEC 210.26-B below). We ae not certain that this can be maintained in every loft area. Closet areas are 24 inches deep and 48 inches wide which will accommodate two 20 inch panels side by side.

c. National Electric Code 210.26-E requires dedicated equipment space to be the width and depth of the panel for a height of 6’ 0”. We are not sure this can be maintained in every loft area. A total of 9 buildings have a 6 feet 6 inch height in the loft areas. These 9 loft areas should not be needed when you use two 20 inch wide panels, which are available on the market. A total of 7 buildings have loft areas of only 5 feet clearance. These 7 loft areas should not be needed when you use two 20 inch wide panels, which are available on the market. These 7 buildings currently have side by side panels which are 20 inches and 26 inches in width, therefore two 20 inch panels will have 8 inches to spare.

d. National Electric Code 210.26-C-1 at least 1 door of sufficient area shall be provided to give access to and egress from working space about electrical equipment. Are the doors to the lofts adequate to meet this requirement? Yes, we have adequate access and egress in all the buildings

e. Note: There may be other code concerns not listed here

f. Please provide a response of how you would like the contractor to proceed when faced with these code violations? Potential code violations shall be brought to the attention of the PPM and EPM.