Statement_of_Work_to_Replace_Kit_Greenhouse.pdf
PDF 112 KB Posted
- Solicitation number
- 12639519Q0229
About this file
SOW
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Q's_and_A's,_with_photos.docx | DOCX document | |
| 12639519Q0229-0001.pdf | ||
| 12639519Q0229.pdf | ||
| General_Decision_Number_MA20180001.pdf | ||
| IMG_0019.jpg | JPG image | |
| IMG_0018.jpg | JPG image |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
REPLACE KIT GREENHOUSE
1. General
The purpose of this Statement of Work is to provide the OITS PSDEL Facility a contract that will replace an existing “Kit” Greenhouse with a new one.
2. Background
The Otis PSDEL lab conducts activities for the U.S. Department of Agriculture’s Animal and Plant Inspection Services. The lab is located at 1398 West Truck Road, Buzzards Bay, MA 02542. This is on Joint Base Cape Cod.
The facility is approximately 44,600 square foot and consists of administrative offices, laboratories, greenhouses, and warehouse and maintenance shop. There are also several connex boxes and refrigerated trailers in use for storage.
3. Provide all material, equipment, tools and labor necessary to perform the following work:
3.1 Demo the existing “Kit greenhouse.” (The size of the greenhouse is 15’ 5” wide x 30’ 1” long). It sits on an 8” concrete stem wall 30” inches above grade.
3.2 Remove all lighting fixtures, gas heating units, fans, and wood sill plate from the existing greenhouse.
3.3 Dispose of all debris offsite in accordance with waste regulations.
3.4 Supply and install new sill plates on the existing concrete stem wall. The new sill plate shall be pressure treated lumber.
3.5 Supply and install new mechanical system for the greenhouse. The system must be sized to maintain a minimum of 50 degrees in winter and a maximum of 90 degrees in summer.
3.6 Supply and install new lights fixtures.
4. Personnel Security
The contractor shall submit the name and driver’s license number for any employee working under this contract and provide updates as changes occur.
5. Point of Contact
The COR is the facility manager for the Otis Lab: Dave Mills, phone (508) 563-0905. Mr. Mills shall coordinate any activities and services under the contract and discuss contractor requirements as well as address any potential problems.
6. Quote
Email your quote to james.g.roloff@usda.gov, 612-336-3223, by 09/16/2019 at noon Central Time.
mailto:james.g.roloff@usda.gov
File details come from the government source that posted it.