att4_Material_Inventory.pdf

PDF 91 KB Posted

Attached to
Rapid River Ranger District Tree Cooler Reprocurement Federal contract opportunity
Solicitation number
12569R19B0001
Issued by
Department of Agriculture Forest Service R9-Eastern Region

About this file

Attachment 4 - Materials Inventory Listing

View the file

Other files for this federal contract opportunity

Other files attached to Rapid River Ranger District Tree Cooler Reprocurement, newest first.
File Type Posted
amend4_sf_30.pdf PDF
amend3_sf_30.pdf PDF
amend2_sf_30.pdf PDF
amend1_sf_30.doc DOC document
att1_stamped_truss_submittal.pdf PDF
Att2_post_depth.docx DOCX document
att3_wage_rate.pdf PDF
att1_FinalSpecPackage(03.12.18).pdf PDF
att2_RRRD_Tree_Cooler_Pole_Barn_Final_Submission_03-19-18.pdf PDF
cooler_solicitation.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 4 Rapid River Ranger District Tree Cooler Reprocurement

Materials Inventory Sheet

The successful contractor may incorporate existing materials (as listed below) and work into the contract. The contractor is required to meet all contract specifications, and that the Forest Service does not warrant the suitability of existing materials or work.

Material Inventory:

Reinforcing bar #5: 23 each @ 20 lf

Reinforcing bar #4: 250 each @20 lf

Trusses: 16 each @7’6” span

Trusses: 13 each @ 41’6” span: Trusses were initially placed directly on the uneven ground and exposed to weather. Trusses have been blocked up, evenly supported, and covered.

Black steel pipe: 6 each @ 1.5” id x 20lf

2x4x20’: 14 each

20’ Tri-lam post on ground: 9 each

2x8x12’ treated: 10 each

2x8x10’ treated: 7 each

2x12x12’: 3 each

2x4x12’: 60 each

2x6x12’: 60 each

2x4x14’: 20 each

2x6x20’: 17 each

Concrete footings: 20 each, 20”d.

2x6x16’ treated: 1 each

2x8x14’: 1 each

1”x10’ pvc conduit: 19 each

¾”x10’ pvc conduit: 28 each

2.5”x10’ pvc conduit: 4 each.

Work in place:

1. Underground electric to pole building panel (partially installed – no grounding) from surveyor garage.

Attachment 4 Rapid River Ranger District Tree Cooler Reprocurement

2. 20’ Tri-lam post set in hole on footings, backfilled with bracing: 23 each, depth of footings approximately 6” shallower than previous shop drawings call for.