prebid_notes.pdf

PDF 89 KB Posted

Attached to
Whirlpool Parking Area Paving Federal contract opportunity
Solicitation number
12569R18C0004
Issued by
Department of Agriculture Forest Service R9-Eastern Region

About this file

Pre-bid Meeting Notes

View the file

Other files for this federal contract opportunity

Other files attached to Whirlpool Parking Area Paving, newest first.
File Type Posted
amend1_sf_30.pdf PDF
attendee_record.pdf PDF
Experience_Questionnaire.pdf PDF
Plans.pdf PDF
davis_bacon_wages.pdf PDF
whirlpool_sol.pdf PDF
SectionC.pdf PDF
Maps.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment No. 1 12569R18R0007 Whirlpool Parking Area Paving Amendment 1

Whirlpool Pre-Bid Conference

Project:

Whirlpool Parking Area Paving

Solicitation Number:

12569R18R0007

Location:

On-site

Date:

4/9/18

Attendees:

See attached.

Discussion:

• COR Jonathan Meeks introduced himself.

• Bid due date 4/23/18

• AGAR 452.215-71 Instructions for the preparation of technical and business proposals.

o COR pointed out section on page 34 and 35, so everyone knew what should be included in the bid proposal.

• Section M o COR indicated how proposals will be evaluated.

• Plans o Described the project having two main improvements, parking area paving and drainage.

o Sheet C-2.

Noted that plans/specs say some existing boulders may have to be moved and some minor clearing (5” dbh or less) is part of the work but is incidental to the other main pay items.

o Sheet C-4.

Noted existing aggregate needs to be loosened 2-3”, prior to placing new aggregate.

Specifications state that COR will layout elevations of ditch-lines and culverts.

Attachment No. 1 12569R18R0007 Whirlpool Parking Area Paving Amendment 1 o Sheet C-6 Noted that specifications have quantities of pavement markings.

o Sheet C-7 Reviewed shoulder detail.

• Section C/ Specifications o Noted Period of Performance of 25 days and must start after Labor Day.

o Section 151, discussed the requirement to power wash equipment before and after project is complete.

o Section 152, discussed that a third party surveyor is required to layout the site.

No elevations are required.

o Section 204, discussed that all earthwork activities fall under the 204 pay items, and that excess material would need to be placed outside of wooded area.

o Section 301, discussed that an independent testing company will have to take density tests of the aggregate.

o Section 401, discussed that an independent testing company will have to take density tests of the asphalt.

o Section 602, discussed that there are 3 different culverts required for the project, which includes needed materials to connect/band culvert sections. Also discussed that 2 products are listed, but approved equals may also be used.

o Section 625, discussed the need for a very specific specialty seed mix and where to locate it.

o Section 635, discussed the requirements to close off the site during construction and that the site is a known problem site for users trying to get back to the launch during construction activities.

• Q/A o No-one had any questions.