This is a Project Manual document for electrical upgrades at the CalVet Headquarters facility, prepared by the California Department of General Services Real Estate Services Division in coordination with the California Department of Veterans Affairs for a project located in Sacramento, Sacramento County, California. The project (Contract Number 26-329441, Project Number 12533) encompasses comprehensive electrical system upgrades including disconnection and replacement of existing switchgear, switchboards, distribution panelboards, transformers, disconnect switches, busway, and selective feeders throughout the facility, as well as busway replacement from the SMUD vault to the main electrical room and UPS replacement. The project requires temporary power installation prior to service disconnection to maintain critical loads including system security, server room HVAC and UPS systems, freight elevator, domestic water pumps, fire alarm and suppression systems, exit signs, and egress lighting. Circuit tracing work must identify, label, and document all devices powered by the engineer-provided Revit model, with deliverables including updated as-built Revit and AutoCAD files; this work is expected to occur during non-work hours. Sealed bids are due October 7, 2026, at 2:00 P.M. at 707 Third Street, West Sacramento, California 95605. Contractors must hold either an A or B Certificate of Reported Compliance (CRC) to bid, and must submit valid CRCs for all fleet vehicles retained by the contractor or listed subcontractors prior to contract execution.
The contract requires contractors to follow the approved sequencing plan as outlined in the contract documents. Project execution necessitates coordination with the building's operational requirements given the sensitive nature of the systems requiring continuous power and the restriction of major work to non-work hours to minimize disruption to facility operations.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 12533_-_Project_Manual_Book_I.pdf | ||
| 12533_-_Drawings_with_Issue_Date.pdf | ||
| 12533_-_Bid_Package_Documents.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATE OF CALIFORNIA DEPARTMENT OF GENERAL SERVICES
REAL ESTATE SERVICES DIVISION
PROJECT MANAGEMENT AND DEVELOPMENT BRANCH
PROJECT MANUAL – Book II of II
INTRODUCTORY INFORMATION
APPENDICES
FOR:
CALVET HEADQUARTERS ELECTRICAL UPGRADES
CALIFORNIA DEPARTMENT OF VETERANS AFFAIRS
SACRAMENTO, SACRAMENTO COUNTY, CALIFORNIA
Jennifer Tucker, Project Director/Manager West Sacramento, California
Consultants:
The Engineering Enterprise Scott Wheeler
July 2026 000000000012533
PROJECT TITLE PAGE
RESDMSTR: 02/03/2014v1 00 01 01 - 1 000000000012533
DOCUMENT 00 01 01
PROJECT TITLE PAGE
Title : CalVet Headquarters Electrical Upgrades
Client Agency : California Department of Veterans Affairs
Location : 1227 O Street Sacramento, California 95814
Project Number : 000000000012533
Project Director : Jennifer Tucker State of California Department of General Services Real Estate Services Division Project Management and Development Branch 707 Third Street, 4th Floor West Sacramento, California 95605 Telephone Number: (916) 212-0078 Email: jennifer.tucker@dgs.ca.gov
Consultant : The Engineering Enterprise Scott Wheeler Telephone Number: (530) 927-5794 Email: scott@engent.com mailto:jennifer.tucker@dgs.ca.gov mailto:scott@engent.com
CERTIFICATIONS PAGE
RESDMSTR: 02/03/2014v1 00 01 05 - 1 000000000012533
DOCUMENT 00 01 05
CERTIFICATIONS PAGE
PROJECT TITLE : CalVet Headquarters Electrical Upgrades
CLIENT AGENCY : Department of Veterans Affairs
LOCATION : Sacramento, CALIFORNIA
PROJECT NUMBER : 000000000012533
OWNER : STATE OF CALIFORNIA
PROJECT DIRECTOR : Jennifer Tucker Department of General Services Project Management and Development Branch 707 Third Street, 4th Floor West Sacramento, California 95605 Telephone Number: (279) 946-8516 Email: Jennifer.tucker@dgs.ca.gov
CONSULTANT: Scott Wheeler, PE The Engineering Enterprise
TABLE OF CONTENTS
RESDMSTR: 6/20/2025 00 01 10 - 1 000000000012533
DOCUMENT 00 01 10
TABLE OF CONTENTS
BOOK I
PROCUREMENT AND CONTRACTING REQUIREMENTS GROUP
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
INTRODUCTORY INFORMATION
Pages Document 00 01 01 Project Title Page .......................................................................... 1 only 00 01 05 Certifications Page ........................................................................ 1 only 00 01 10 Table of Contents .......................................................................... 1 through 4 00 01 15 List of Drawings ............................................................................. 1 through 2
BIDDING REQUIREMENTS
Document 00 11 00 Invitation for Bids ........................................................................... 1 through 4 00 21 00 Instructions to Bidders ................................................................... 1 through 8 Appendix 00 21 00.01 Request for Bidding Interpretation ................................................. 1 only Document 00 22 00 Supplementary Instructions to Bidders .......................................... 1 only 00 22 10 DVBE Participation Program Requirements ................................... 1 through 3 00 41 00 Bid Form (Sample) ........................................................................ 1 through 9 00 43 13 Bidder’s Bond ................................................................................ 1 only 00 43 16 Certified Small Business Subcontractor(s) Summary (Sample) ..... 1 through 2 00 45 46 Payee Data Record ....................................................................... 1 through 2
CONTRACTING REQUIREMENTS
Document 00 52 00 Agreement (Sample) ..................................................................... 1 only 00 61 13 Performance Bond (Sample) ......................................................... 1 only 00 61 14 Payment Bond to Accompany Construction Contract (Sample) ..... 1 only 00 63 63 Construction Contract Change Order (Sample) ............................. 1 only 00 72 00 General Conditions of the Contract for Construction ...................... 1 through 31 00 73 00 Supplementary Conditions ............................................................. 1 through 12
SPECIFICATIONS GROUP
GENERAL REQUIREMENTS SUBGROUP
DIVISION 01 - GENERAL REQUIREMENTS
Section 01 10 00 Summary ....................................................................................... 1 through 5 01 25 00 Substitution Procedures ................................................................. 1 through 2 01 29 00 Payment Procedures ..................................................................... 1 through 3 01 31 00 Project Management and Coordination .......................................... 1 through 7
RESDMSTR: 6/20/2025 00 01 10 - 2 000000000012533
01 32 00 Construction Progress Documentation .......................................... 1 through 7 01 32 33 Photographic Documentation ........................................................ 1 through 3 01 33 00 Submittal Procedures .................................................................... 1 through 7 01 35 16 Alteration Procedures .................................................................... 1 through 5 01 35 53 Security Procedures ...................................................................... 1 through 2 01 40 00 Quality Requirements .................................................................... 1 through 6 01 50 00 Temporary Facilities and Controls ................................................. 1 through 5 01 60 00 Product Requirements ................................................................... 1 through 5 01 73 00 Execution ...................................................................................... 1 through 6 01 74 19 Construction Waste Management and Disposal ............................ 1 through 5 Form 01 74 19.01 Construction Waste Estimate......................................................... 1 only 01 74 19.02 Waste Management Report ........................................................... 1 through 2 Section 01 74 20 Recycled Content Certification ....................................................... 1 through 4 Form 01 74 20.01 Recycled Content Certification Worksheet (Example) .................... 1 through 3 01 74 20.02 State Agency Buy Recycled Campaign Procurement Summary (Example) ...................................................................................................... 1 through 2 Section 01 75 00 Starting and Adjusting ................................................................... 1 through 3 01 77 00 Closeout Procedures ..................................................................... 1 through 12 Form STD 817 Prime Contractor’s Certifications – DVBE Subcontractor Report ... 1 through 5 01 77 00.01 Contractor’s Certification of Small Business Participation .............. 1 only 01 77 00.02 Contractor’ Certification of Small Business Participation ................ 1 only Section 01 79 00 Demonstration and Training .......................................................... 1 through 5 01 91 13 General Commissioning Requirements ......................................... 1 through 15
FACILITY CONSTRUCTION SUBGROUP
DIVISION 02 – EXISTING CONDITIONS
Section 02 41 20 Selective Demolition ...................................................................... 1 through 7 02 83 00 Lead-Containing Paint Removal and Lead-Related Construction .. 1 through 21 Attachment A – Lead-related Work Plan Outline ............................ 1 through 3
DIVISION 03 – CONCRETE – NOT USED
DIVISION 04 – MASONRY – NOT USED
DIVISION 05 – METALS – NOT USED
DIVISION 06 – WOOD, PLASTICS, AND COMPOSITES – NOT USED
DIVISION 07 – THERMAL AND MOISTURE PROTECTION
Section 07 84 00 Firestopping ................................................................................... 1 through 11
DIVISION 08 – OPENINGS
Section 08 11 13 Hollow Metal Doors ....................................................................... 1 through 5 Section 08 71 00 Door Hardware .............................................................................. 1 through 13
DIVISION 09 – FINISHES
Section 09 21 16 Gypsum Board Assemblies ........................................................... 1 through 8 09 90 00 Painting ......................................................................................... 1 through 11
DIVISION 10 – SPECIALTIES – NOT USED
RESDMSTR: 6/20/2025 00 01 10 - 3 000000000012533
DIVISION 11 – EQUIPMENT – NOT USED
DIVISION 12 – FURNISHINGS – NOT USED
DIVISION 13 – SPECIAL CONSTRUCTION – NOT USED
DIVISION 14 – CONVEYING EQUIPMENT – NOT USED
DIVISION 15 – RESERVED (NOT USED)
DIVISION 16 – RESERVED (NOT USED)
DIVISION 17 – RESERVED (NOT USED)
DIVISION 18 – RESERVED (NOT USED)
DIVISION 19 – RESERVED (NOT USED)
FACILITY SERVICES SUBGROUP
DIVISION 20 – RESERVED (NOT USED)
DIVISION 21 – FIRE SUPPRESSION – NOT USED
DIVISION 22 – PLUMBING – NOT USED
DIVISION 23 – HEATING, VENTILATING, AND AIR CONDITIONING (HVAC) – NOT USED
DIVISION 24 – RESERVED (NOT USED)
DIVISION 25 – INTEGRATED AUTOMATION – NOT USED
DIVISION 26 – ELECTRICAL
Section 26 00 10 Basic Electrical Requirements ....................................................... 1 through 13 26 00 60 Power System Study ..................................................................... 1 through 5 26 00 90 Electrical Demolition ...................................................................... 1 through 2 26 05 19 Building Wire and Cable ................................................................ 1 through 12 26 05 26 Grounding and Bonding ................................................................. 1 through 5 26 05 29 Electrical Hangers and Supports ................................................... 1 through 4 26 05 31 Conduit .......................................................................................... 1 through 11 26 05 33 Boxes ............................................................................................ 1 through 3 26 05 36 Cable Trays ................................................................................... 1 through 3 26 05 53 Electrical Identification ................................................................... 1 through 5 26 08 00 Electrical Commissioning ............................................................... 1 through 11 26 22 13 Dry Type Transformers .................................................................. 1 through 9 26 24 13 Switchboards ................................................................................. 1 through 11 26 24 16 Panelboards .................................................................................. 1 through 8 26 25 00 Busway .......................................................................................... 1 through 7 26 28 16 Overcurrent Protective Devices ..................................................... 1 through 12 26 28 19 Disconnect Switches ..................................................................... 1 through 3 26 33 53 Static Uninterruptible Power Supply............................................... 1 through 23 26 43 13 Surge Protective Devices .............................................................. 1 through 9
DIVISION 27 – COMMUNICATIONS – NOT USED
RESDMSTR: 6/20/2025 00 01 10 - 4 000000000012533
DIVISION 28 – ELECTRONIC SAFETY AND SECURITY - NOT USED
DIVISION 29 – RESERVED (NOT USED)
SITE AND INFRASTRUCTURE SUBGROUP
DIVISION 30 – RESERVED (NOT USED)
DIVISION 31 – EARTHWORK – NOT USED
DIVISION 32 – EXTERIOR IMPROVEMENTS – NOT USED
DIVISION 33 – UTILITIES – NOT USED
DIVISION 34 – TRANSPORTATION – NOT USED
DIVISION 35 – WATERWAY AND MARINE CONSTRUCTION – NOT USED
DIVISION 36 – RESERVED (NOT USED)
DIVISION 37 – RESERVED (NOT USED)
DIVISION 38 – RESERVED (NOT USED)
DIVISION 39 – RESERVED (NOT USED)
PROCESS EQUIPMENT SUBGROUP (NOT USED)
BOOK II
Appendix A Hazardous Materials Survey ........................................................ 1 through 104
END OF DOCUMENT
LIST OF DRAWINGS
RESDMSTR: 02/03/2014 00 01 15 - 1 000000000012533
DOCUMENT 00 01 15
SHEET NUMBER DESCRIPTION
GENERAL
G001 GENERAL
ELECTRICAL
E001 SYMBOLS AND ABBREVIATIONS
E002 FEEDER SCHEDULE, NOTES, & TABLES
E003 TITLE 24
E004 NOT USED
E005 SCHEDULES - PANELBOARDS - 1ST FLOOR
E006 SCHEDULES - PANELBOARDS - 2ND FLOOR
E007 SCHEDULES - PANELBOARDS - 3RD FLOOR
E008 SCHEDULES - PANELBOARDS - 4TH FLOOR
E009 SCHEDULES - PANELBOARDS - 5TH FLOOR
E010 SCHEDULES - PANELBOARDS - 6TH FLOOR
E011 SCHEDULES - PANELBOARDS - ROOF/PENTHOUSE
E100 SITE & FIRE ACCESS
E101 ELECTRICAL POWER PLAN - 1ST FLOOR
E102 ELECTRICAL POWER PLAN - 2ND FLOOR
E103 ELECTRICAL POWER PLAN - 3RD FLOOR
E104 ELECTRICAL POWER PLAN - 4TH FLOOR
E105 ELECTRICAL POWER PLAN - 5TH FLOOR
E106 ELECTRICAL POWER PLAN - 6TH FLOOR
E107 ELECTRICAL POWER PLAN - ROOF/PENTHOUSE
E200 ENLARGED PLANS - SMUD VAULT
E201 ENLARGED PLANS - MAIN ELECTRICAL ROOM
E202 ENLARGED PLANS - 1ST FLOOR EAST ELECTRICAL CLOSET
E203 ENLARGED PLANS – 1ST FLOOR WEST ELECTRICAL CLOSET
E204 ENLARGED PLANS - 2ND FLOOR EAST ELECTRICAL CLOSET
E205 ENLARGED PLANS - 2ND FLOOR WEST ELECTRICAL CLOSET
E206 ENLARGED PLANS - 3RD FLOOR EAST ELECTRICAL CLOSET/ROOM
E207 ENLARGED PLANS - 3RD FLOOR WEST ELECTRICAL CLOSET
E208 ENLARGED PLANS – 4TH FLOOR EAST ELECTRICAL CLOSET/ROOM
E209 ENLARGED PLANS – 4TH FLOOR WEST ELECTRICAL CLOSET/ROOM
RESDMSTR: 02/03/2014 00 01 15 - 2 000000000012533
E210 ENLARGED PLANS – 5TH FLOOR EAST ELECTRICAL CLOSET & SPACES
E211 ENLARGED PLANS – 5TH FLOOR WEST ELECTRICAL CLOSET & SPACES
E212 ENLARGED PLANS – 6TH FLOOR EAST ELECTRICAL CLOSET/ROOM
E213 ENLARGED PLANS – 6TH FLOOR WEST ELECTRICAL CLOSET/ROOM
E214 ENLARGED PLANS - ROOF/PENTHOUSE PANELS
E300 ELECTRICAL SINGLE-LINE DIAGRAM - EXISTING
E301 ELECTRICAL SINGLE-LINE DIAGRAM - NEW
E400 DETAILS - GROUNDING AND BONDING
E401 DETAILS - CABLE TRAY AND BUS DUCT ANCHORAGE
E402 DETAILS - ELECTRICAL EQUIPMENT ANCHORAGE
E403 DETAILS - WALL PENETRATIONS
Facilities | Environmental | Geotechnical | Materials
May 20, 2024 | Report Number: NB247034
Prepared for:
The Engineering Enterprise 1125 High Street Auburn, CA 95603
May 20, 2024
The Engineering Enterprise 1125 High Street Auburn CA, 95603
Attn: Mr. Keefe O’Toole T: (510) 263-1530 E: keefe@engent.com
RE: Pre-Renovation Hazardous Materials Survey
Terracon Project No:
Dear Mr. O’Toole:
Terracon Consultants, Inc. (Terracon) is pleased to submit the attached report for the referenced site to . The purpose of this report is to present the results of the Pre-renovation hazardous materials survey performed April 25, 2024. This survey was conducted in general accordance with Terracon’s proposal PNB247034, dated March 1, 2024. We understand this survey was requested due to the planned replacement of the existing building electrical service. The survey scope included the existing and new area for the electrical vault on the ground floor, electrical rooms on the 1st – 6th floors, electrical panels on the roof, and the north and east exterior elevations of the ground floor.
Terracon collected one hundred twenty-six (126) samples from thirty-eight (38) homogeneous areas of suspect asbestos containing materials (ACMs). Asbestos content was confirmed in two (2) of the materials identified, sampled, and analyzed. Twenty (20) painted surfaces and bulk materials were sampled and analyzed. Sixteen (16) of the paints and materials were found to contain detectable levels of lead. Four (4) samples of building enclosure sealants were collected to be analyzed for potential polychlorinated biphenyl (PCB) content. PCBs were not detected above the analytical reporting limit in any of the materials sampled. Other hazardous building materials present include mercury containing fluorescent light tubes and suspect PCB lighting ballasts. Please refer to the attached report for details.
Terracon appreciates the opportunity to provide this service to If you have any questions regarding this report, please contact our office at your convenience.
Sincerely, Terracon Consultants, Inc.
Ken Pilgrim, CAC Steff Steiner, CAC, Lead I/A Project Manager Office Manager
1.0 INTRODUCTION
1.1 Project Objective
1.2 Reliance
2.0 BUILDING DESCRIPTION
3.0 FIELD ACTIVITIES
3.1 Asbestos, Lead, PCBs, and Other Hazardous Building Materials
3.2 Visual Assessment - Asbestos
3.3 Physical Assessment - Asbestos
3.4 Sample Analysis - Asbestos
3.5 Lead Containing Paint and Materials
3.6 Visual Assessment – Lead Containing Paint and Materials
3.7 Physical Assessment – Lead Containing Paint and Materials
3.8 Sample Analysis - Lead Containing Paint
3.9 PCBs – Sealants
3.10 Visual Assessment - Other Hazardous Building Materials
4.0 REGULATORY OVERVIEW
4.1 Asbestos
4.2 Lead Containing Paint/Materials
4.3 Refrigerants
4.4 Universal Waste
4.5 PCBs
5.0 FINDINGS
5.1 Asbestos
5.2 Lead Containing Paint/Materials
5.3 PCB Containing Materials
5.4 Other Hazardous Building Materials
6.0 LIMITATIONS/GENERAL COMMENTS
APPENDIX A ASBESTOS SAMPLE SUMMARY
APPENDIX B ASBESTOS ANALYTICAL LABORATORY DATA
APPENDIX C LEAD ANALYTICAL LABORATORY DATA
APPENDIX D PCB ANALYTICAL LABORATORY DATA
APPENDIX E SAMPLE LOCATION FIGURES
APPENDIX F CERTIFICATIONS
Facilities | Environmental | Geotechnical | Materials 1
PRE-RENOVATION HAZARDOUS MATERIALS SURVEY
California Veteran Affairs (Cal-Vet) Building 1227 O Street
Sacramento, California
Terracon Project No. NB247034 May 20, 2024
1.0 INTRODUCTION
Terracon Consultants, Inc. (Terracon) conducted a pre-renovation hazardous materials survey of the existing and tentatively planned expanded electrical vault on the ground floor and electrical rooms on the 1st – 6th floors, and roof level at the California Veteran Affairs (Cal-Vet) Building located at 1227 O Street in Sacramento, California (Site). The survey was conducted April 25, 2024, in general accordance with Terracon’s proposal PNB247034, dated March 1, 2024, and the asbestos sampling protocols established in Environmental Protection Agency (EPA) regulation 40 Code of Regulations (CFR) Part 763 Subpart E 763.86, (Asbestos Hazard Emergency Response Act, AHERA). The survey scope included limited invasive sampling methods within the referenced survey area and north and east elevations of the exterior at the ground floor. The remaining interior, exterior and roof of the building were excluded from the scope of the survey. The survey included sample collection of suspect asbestos-containing materials (ACMs), lead containing paints (LCPs) and materials, and polychlorinated biphenyls (PCBs) materials. Other hazardous building materials were noted, if observed.
1.1 Project Objective
The objective of this survey was to identify the presence or absence of suspect ACMs and lead containing paints and materials, PCBs in materials (light ballasts, and building enclosure sealants), universal waste (fluorescent light tubes, mercury containing switches, batteries), tritium (radioactive) emergency egress equipment, and regulated refrigerants in mechanical or building equipment associated within the survey areas of the site structure.
EPA regulation 40 CFR 61, Subpart M, the National Emission Standards for Hazardous Air Pollutants (NESHAP) prohibits the release of asbestos fibers to the atmosphere during renovation or demolition activities. The asbestos NESHAP requires that regulated ACM be identified, classified, and quantified prior to planned disturbances, renovations, or demolition activities.
1.2 Reliance
This report is for the exclusive use of for the replacement of the existing electrical service for the Cal-Vet building located at 1227 O Street in Sacramento, California. Reliance by any other party on this report is prohibited without written authorization of Terracon, .
Reliance on this report by all authorized parties will be subject to the terms, conditions, and limitations stated in the proposal, this report, and the project contract.
Pre-renovation Hazardous Materials Survey
Facilities | Environmental | Geotechnical | Materials 2
2.0 BUILDING DESCRIPTION
The survey scope included the existing and planned new electrical vault area on the ground floor, electrical and transformer rooms on the 1st – 6th floors, and electrical panel areas on the roof.
Below is a summary of the survey area. See figures in Appendix E for a depiction of the survey area.
Floor Location Description
First Floor SMUD Transformer Room (not accessible), Electrical Closets 1A and 1B, and office area tentatively to be impacted by planned new electrical vault. Interior finishes include plaster walls, concrete walls, drywall, carpet, vinyl base cove, and gypsum lay-in ceiling tile.
Second Floor Electrical closets 2A and 2B. Finishes observed include drywall walls, plaster walls, and concrete flooring.
Third Floor Transformer room, Electrical Closet 3A and 3B. Interior finishes include plaster walls, fireproofing, drywall walls, fiberglass panel walls, ceramic tile and drywall ceiling tile.
Fourth Floor Transformer Room, Electrical Closet 4A and 4B. Interior finishes include concrete flooring, plaster walls, fireproofing, vinyl flooring tile, drywall walls, and ceiling tile.
Fifth Floor Five areas with electrical panels including Electrical Closet 5A and 5B. Interior finishes include concrete flooring, plaster walls, fireproofing, ceiling tile, drywall walls, carpet, vinyl cove base, vinyl flooring tile, and concrete walls with texture.
Sixth Floor Electrical closets 6A and 6B and two transformer rooms. Finishes include plaster walls, fireproofing, resilient floor and cove base.
Roof Large electrical panel located on the roof. Roof materials were excluded.
Exterior North and East Elevations at Ground Floor Level.
3.0 FIELD ACTIVITIES
3.1 Asbestos, Lead, PCBs, and Other Hazardous Building Materials
The survey was conducted by Remington Caldwell, California Division of Occupational Safety and Health (Cal/OSHA) Certified Asbestos Consultant (CAC) and California Department of Public Health (CDPH) Lead Inspector/Assessor. Ken Pilgrim, CAC, managed the field survey and preparation of report. Copies of pertinent training certifications are included in Appendix F. The asbestos portion of the survey was conducted in general accordance with the sample collection protocols established in EPA 40 CFR Part 763 Subpart E 763.86, AHERA. A summary of survey activities is provided below.
3.2 Visual Assessment - Asbestos
Survey activities were initiated with visual observation of the survey area to identify homogeneous areas of suspect ACM. A homogeneous area (HA) consists of a building material
Facilities | Environmental | Geotechnical | Materials 3 that appears similar throughout in terms of color, size and texture with consideration given to the date of application. The assessment was limited to the referenced survey area.
3.3 Physical Assessment - Asbestos
A physical assessment of each HA of suspect ACM was conducted to assess the current friability and condition of the materials. A friable material is defined by the EPA as a material which can be crumbled, pulverized, or reduced to powder by hand pressure when dry. Friability was assessed by physically touching suspect materials.
Based on results of the visual observation, bulk samples of suspect ACM were collected in general accordance with EPA AHERA sampling protocols. Samples of suspect materials were collected from representative locations in each homogeneous area. Bulk samples were collected using wet methods as applicable to reduce the potential for fiber release. Samples were placed in sealable containers and labeled with unique sample numbers using an indelible marker.
The selection of sample locations and frequency of sampling were based on Terracon’s observations and the assumption that like materials in the same area are homogeneous in content.
Terracon collected one hundred twenty-six (126) samples from thirty-eight (38) homogeneous areas of suspect ACMs. Laboratory analysis reported that two (2) of the materials sampled contain asbestos. A summary of the materials reported as containing asbestos is included in Table I below and a summary of all suspect ACM samples collected during the survey is included as Appendix A.
3.4 Sample Analysis - Asbestos
Asbestos bulk samples were submitted under chain of custody to Eurofins EPK Built Environment Testing, LLC (Eurofins) in Tustin, California for analysis by polarized light microscopy (PLM) with dispersion staining techniques per EPA methodology 600/R-93/116. The percentage of asbestos, where applicable, was determined by microscopic visual estimation. Eurofins is accredited under the National Voluntary Laboratory Accreditation Program (NVLAP) Accreditation (No. 200757-0).
The laboratory reports for the asbestos bulk samples are included as Appendix B.
3.5 Lead Containing Paint and Materials
Terracon collected paint chip, building sealant, ceramic tile, and resilient flooring samples to determine the lead content in parts per million (ppm) of the predominant painted interior and exterior surfaces and materials associated with the survey area. Suspect lead samples were collected in sealable containers and labeled with unique sample numbers using an indelible marker.
3.6 Visual Assessment – Lead Containing Paint and Materials
Inspection activities began with visual observations of painted surfaces to identify unique combinations of paint. A unique combination of paint consists of paint that is applied to a building material and has similar color, substrate, and component. The assessment was conducted throughout the referenced survey areas. Suspect lead containing sealants, ceramic tile, and resilient flooring were observed within the survey area.
Facilities | Environmental | Geotechnical | Materials 4
3.7 Physical Assessment – Lead Containing Paint and Materials
A physical assessment of unique combinations of paint was conducted to assess the condition of the paint. Lead paint chip samples were collected to comply with Cal-OSHA regulations (Title 8 CCR 1532.1 – Lead Exposure in Construction) for the proposed demolition activities. Paint was sampled to identify potential worker exposure and potential disposal restrictions. All interior and exterior painted surfaces were in fair to good condition and generally intact with the building substrates at the time of the survey.
Terracon sampled twenty (20) painted surfaces and building materials during the survey. Thirteen
(13) of the paints and three (3) materials sampled were found to contain lead concentrations in exceedance of the laboratory detection limit. A summary of suspect lead paint and materials collected during the survey is summarized in Table II.
3.8 Sample Analysis - Lead Containing Paint
Paint chip and bulk samples were submitted under chain of custody to Eurofins in Tustin and were analyzed by Flame Atomic Absorption method SW846-7000B. Eurofins is accredited by the American Industry Hygiene Association’s (AIHA) Environmental Lead Laboratory Accreditation Program (ELLAP) (Laboratory Code 178697) to perform Flame Atomic Absorption analysis. The laboratory reports for the lead samples are included as Appendix C.
3.9 PCBs – Sealants
Terracon collected four (4) bulk samples from multiple building enclosure sealants at the north and east elevations of the ground floor during the survey. Sealants associated with building enclosure including windows were assessed for potential PCB content. Bulk sealant samples were collected using a razor knife and were placed into individual containers. Each sample was provided a discrete sample number, which was recorded on a chain of custody form. The samples were preserved on ice and transported under chain of custody procedures to McCampbell Analytical, Inc. in Pittsburg, California. All samples were analyzed for PCB content in accordance with EPA Method SW8082. The laboratory reports for the PCB samples are included as Appendix D. A summary of the PCB materials samples is included in Table III.
3.10 Visual Assessment - Other Hazardous Building Materials
The survey area of the building was visually inspected for the presence of mercury containing products such as fluorescent light tubes, compact fluorescent bulbs, switches, high intensity discharge (HID) bulbs, and thermometers. Lighting fixtures were screened for the potential presence of PCB containing ballasts. Equipment with refrigerants were inspected to identify refrigerant type(s) if labels were present and legible. Emergency egress equipment was identified and assessed for the presence of batteries, light emitting diodes (LEDs) or radioactive material such as tritium gas. All materials were visually assessed and quantified if present. No testing was performed.
Facilities | Environmental | Geotechnical | Materials 5
4.0 REGULATORY OVERVIEW
4.1 Asbestos
The Asbestos NESHAP program in California is enforced by federal, state, and county Asbestos NESHAP Coordinators. For projects occurring in Sacramento, California, the Sacramento Metropolitan Air Quality Management District (SMAQMD) has been delegated authority from the EPA to enforce the Asbestos NESHAP within its respective jurisdictional boundaries, excluding tribal lands.
The asbestos NESHAP (40 CFR Part 61, Subpart M) regulates asbestos fiber emissions and asbestos waste disposal practices. The asbestos NESHAP regulation also requires the identification and classification of existing ACM according to friability prior to demolition or renovation activity.
Friable ACM is a material containing more than 1% asbestos that, when dry, can be crumbled, pulverized, or reduced to powder by hand pressure. All friable ACM is considered regulated asbestos-containing material (RACM). The NESHAP regulation is implemented locally by the SMAQMD under Regulation 902.
The asbestos NESHAP regulation classifies ACM as either RACM, Category I non-friable ACM or Category II non-friable ACM. RACM includes all friable ACM, along with Category I and Category II non-friable ACM that has become friable, will be or has been subjected to sanding, grinding, cutting, or abrading, or ACM that has a high probability of becoming or has become crumbled, pulverized, or reduced to powder during renovation or demolition activity. Category I non-friable ACM are exclusively asbestos-containing packings, gaskets, resilient floor coverings, and asphalt roofing products that contain more than 1% asbestos. Category II non-friable ACM are all other non-friable materials other than Category I non-friable ACM that contain more than 1% asbestos.
Friable ACM, along with Category I and Category II non-friable ACM, which is in poor condition and has become friable or which will be subjected to drilling, sanding, grinding, cutting, abrading and which could be crushed or pulverized during anticipated renovation or demolition activities are considered regulated ACM (RACM).
Building materials confirmed to be ACM through the collection of bulk sampling and subsequent laboratory analysis, or presumed ACM, must be removed prior to intentional disturbance during the planned demolition activities. Asbestos abatement must be conducted by California licensed and registered abatement contractors and workers with Cal/OSHA-accredited training. Third-party air monitoring is recommended during the abatement activities.
Cal/OSHA requires that only properly licensed and certified asbestos abatement contractors be allowed to remove ACM. As per NESHAP, all RACM shall be removed from a facility being demolished or renovated before any non-burning demolition or renovation begins that would break up, dislodge, or similarly disturb the material or preclude access to the material for subsequent removal. According to the SMAQMD Regulation 902, if more than 160 square feet or 260 linear feet of any RACM is to be stripped, removed, dislodged, cut, drilled, or similarly disturbed, or for any demolition, the asbestos abatement contractor or facility owner must submit an Asbestos Notification of Demolition and Renovation form to the SMAQMD along with the appropriate fees within at least 10 working days prior to the scheduled asbestos removal activity or demolition start date. Planned renovations that do not meet the definition of ‘demolition or renovation of a facility’ per SMAQMD and where no ACM exists do not require notification to
NESHAP.
Facilities | Environmental | Geotechnical | Materials 6
The Cal-OSHA asbestos standard for construction (Title 8 CCR 1529) regulates workplace exposure to asbestos. The Cal-OSHA standard requires that employee exposure to airborne asbestos must not exceed 0.1 fibers per cubic centimeter of air (0.1 f/cc) as an eight-hour time weighted average (TWA) and not exceed 1.0 fibers per cubic centimeter of air (1.0 f/cc) over a 30-minute time period known as an excursion limit (EL). The TWA and EL are known as Cal- OSHA’s asbestos permissible exposure limits (PELs). The Cal-OSHA standard classifies construction and maintenance activities which could disturb ACM and specifies work practices and precautions which employers must follow when engaging in each class of regulated work.
Asbestos containing construction materials (ACCM) is a term developed by Cal/OSHA out of concern for non-hazardous building materials used inside and outside a building that contain less than 1% asbestos. The definition of ACCM includes any manufactured building material that has more than one-tenth of 1% (>0.1%) asbestos content. The SMAQMD requires point counting of friable samples of ACM at concentrations of less than 10% to determine more accurately the content of asbestos and proper classification of the material for proper abatement and disposal requirements. Alternatively, materials may be presumed as ACMs. If the material is less than one tenth of 1%, the material is not regulated by the EPA however Cal/OSHA worker protection regulations apply if any asbestos is detected.
4.2 Lead Containing Paint/Materials
Personnel performing demolition activities that may disturb painted components or materials with concentrations of lead above the designated analytical detection limit should comply with all current Cal-OSHA regulations in order to minimize employee exposure. Cal-OSHA defines lead containing paint as a paint, which contains lead, regardless of the concentration. Currently, any proposed renovation/demolition is subject to the Cal-OSHA regulations (Title 8 CCR 1532.1 – Lead Exposure in Construction). The Cal-OSHA regulation defines specific training requirements, engineering controls and working practices for construction personnel subject to this standard.
Occupational exposure to lead occurring during construction work, including maintenance activities, painting, alteration, and repairs is subject to the Cal-OSHA Lead Exposure in Construction standard.
Construction work covered by Title 8 CCR 1532.1 includes any repair or renovation activities or other activities that disturb in-place lead-containing materials. Employers must assure that no employee will be exposed to lead at concentrations greater than 50 micrograms per cubic meter ( g/m3) averaged over an eight-hour period without adequate protection. The Cal-OSHA Standard also establishes an action level of 30 g/m3 which if exceeded triggers the requirement for medical monitoring.
Proper waste stream categorization is required for the disposal of all lead containing materials and painted construction debris with total lead content that exceeds 50 ppm. The debris should be classified as hazardous waste if lead waste concentrations exceed either the total lead concentration or soluble lead concentration regulatory limits. Total lead concentration is determined by Total Threshold Limit Concentration (TTLC). Soluble or leachable lead is determined by the Soluble Threshold Limit Concentration (STLC, California required test) and/or Toxicity Characteristic Leaching Procedure (TCLP) (Federal EPA required test). Regulatory limits characterize a lead waste as a hazardous waste if lead concentrations exceed 1,000 ppm by TTLC or 5 milligram per liter by STLC or TCLP.
The above overview is not intended to be inclusive of all potentially pertinent regulatory information. The relevant EPA and OSHA standards should be consulted prior to undertaking
Facilities | Environmental | Geotechnical | Materials 7 activities involving the demolition, renovation, or maintenance of surfaces coated with lead containing paints.
4.3 Refrigerants
The use, management, and release of ozone depleting substances used as refrigerants are regulated under the Clean Air Act (CAA) of 1990. Section 608 of the CAA forbids the venting of regulated refrigerants such as chlorofluorocarbon (CFC), hydrochlorofluorocarbon (HCFC), and blended refrigerants. All regulated refrigerants associated with the building and equipment must be recovered prior to severing pressurized systems or disposal of equipment.
4.4 Universal Waste
Universal wastes are common wastes with hazardous properties that must be managed and have landfill disposal restrictions. Examples include electronic devices, batteries, and mercury containing equipment or lighting. Handling, transportation, and disposal is simplified under the universal waste regulation in the California Code of Regulations Title 22, Division 4.5 Chapter 11.
All materials in the buildings meeting the definition of the universal waste must be removed prior to demolition and handled, transported, and disposed through an appropriate vendor.
4.5 PCBs
PCBs are regulated by the EPA under 40 CFR 761. The production of PCBs has been banned since 1979 and may be present in electrical capacitors, sealants, hydraulic oils, and transformers commonly found in buildings. Materials with greater than 50 ppm PCB content are considered PCB contaminated waste while materials with greater than 500 ppm PCB are considered PCB containing.
PCB containing equipment and/or contaminated materials must be removed and disposed properly prior to demolition of a building. PCB containing lighting ballasts may be present in some lighting fixtures and must be verified by labeling. All PCB containing materials must be removed and disposed prior to building demolition.
5.0 FINDINGS
5.1 Asbestos
Asbestos was identified in the building materials listed in Table I below. A complete sample summary is included as Appendix A. Laboratory analytical reports are included as Appendix B.
Sample locations are depicted on figures in Appendix E.
Facilities | Environmental | Geotechnical | Materials 8
Table I Asbestos Containing Materials
HM # / Material Description
Material Locations Asbestos Content NESHAP
Category Est. Qty
HM 36 / Residual Black Mastic
1st Floor Vault Doorway at Transition
Black Mastic: 2% CH Cat. II 2 sf
HM 37 / Window Caulk Off- White
North and East Elevation Glass to Metal
Gray Caulk: <1% CH by PLM
<0.25% - 1.25% CH by 400 Point Count
Cat. II 80 sf
ND = None Detected, CH = Chrysotile, NA = Not Applicable, RACM = Regulated asbestos containing material (friable), Cat. I = Non-friable (note ACM must be reclassified as a RACM if rendered friable during removal), Cat. II = Category II Non-friable (note ACM must be reclassified as a RACM if rendered friable during removal), LF = Linear Feet, SF = square feet, *Estimate quantity should be field verified prior to abatement or abatement design
It should be reemphasized that although reasonable efforts were made to survey accessible suspect materials, additional suspect but un-sampled materials could be located under existing building materials, inside walls, above ceilings, in isolated areas, in other concealed areas, or areas of the building outside of the defined survey area. Therefore, if suspect materials are encountered during abatement and demolition activities that do not appear to have been characterized as ACM or non-ACM, these materials must be assumed to be ACM until samples are collected and analyzed to prove otherwise. Any assumed material should be treated as asbestos or sampled to determine asbestos content before disturbing the material.
5.2 Lead Containing Paint/Materials
Terracon sampled fifteen (15) painted surfaces and five (5) bulk materials during the survey.
Sixteen (16) of the paint and building material samples were reported with lead content. A summary of sample locations and analytical results is below in Table II. Samples reported with “<” are below the laboratory analytical reporting limit for the sample submitted. The laboratory report is in Appendix C.
Table II Lead Containing Paint/Materials
Sample # Sample Description Sample Location Total Lead Result Condition
Pb-1 Off-White paint on stucco wall 4th Floor Electrical Closet B 930 ppm Intact
Pb-2 White paint on metal door frame 4th Floor Electrical Closet B West wall 1,500 ppm Intact
Pb-3 Off-White paint on drywall wall 4th Floor Transformer Room East wall 52 ppm Intact
Pb-4 Off-White paint on plaster wall 3rd Floor Electrical Closet B North wall 1,600 ppm Intact
Pb-5 Green ceramic tile 3rd Floor Transformer room floor <39 ppm Intact
Pb-6 4”x8” Green ceramic tile plaster on wall 3rd Floor Transformer room East wall <40 ppm Intact
Pb-7 Off-White paint on drywall wall 5th Floor Electrical Panel PNL5C1 South wall 40 ppm Intact
Facilities | Environmental | Geotechnical | Materials 9
Sample # Sample Description Sample Location Total Lead Result Condition
Pb-8 White paint on concrete wall 5th Floor Electrical Panel PNL5DP <39 ppm Intact
Pb-9 White paint on drywall wall 6th Floor Electrical Room 6A North wall <40 ppm Intact
Pb-10 Green linoleum on concrete floor 6th Floor Transformer Room adjacent to Electrical Closet 6A 1,600 ppm Intact
Pb-11 Gray epoxy on concrete floor Roof/Penthouse floor at main Electrical Panel 310 ppm Intact
Pb-12 Green paint on wood electrical panel
Roof/Penthouse at main Electrical Panel
80,000 ppm Fair
Pb-13 Green paint on metal door frame 1st Floor Transformer Vault South wall under panel 4,800 ppm Intact
Pb-14 Gray paint on wood panel support
1st Floor Transformer Vault South wall under panel 86 ppm Intact
Pb-15 White paint on drywall wall 1st Floor Northeast office West Wing wall 58 ppm Intact
Pb-16 Off-White Gray caulk on glass and metal window North Elevation West end 2,400 ppm Intact
Pb-17 White and Brown sealant on metal and concrete window East Elevation North window 1,400 ppm Intact
Pb-18 Brown paint on metal window frame North Elevation West window 38,000 ppm Intact
Pb-19 Brown paint on concrete wall North Elevation lower section of wall 210 ppm Intact
Pb-20 Light brown paint on concrete wall North Elevation upper section of wall 230 ppm Intact ppm = parts per million
Uncharacterized paints and/or suspect materials should be assumed to contain lead until sampling and analysis prove otherwise.
5.3 PCB Containing Materials
Terracon collected four (4) bulk samples from multiple building sealants during the survey. None of the materials sampled were reported to contain PCBs in concentrations exceeding the laboratory reporting limit. A summary of PCB sample locations and analytical results is below in Table III. Laboratory reports are in Appendix D.
Table III PCB Containing Materials
Sample # Material Description Sample Location PCB
Content
PCB-1A
Gray window caulking sealant at exterior window between glass and metal
North Elevation exterior window ND <10 ppm
PCB-1B
Gray window caulking sealant at exterior window between glass and metal
East Elevation exterior window ND <10 ppm
Facilities | Environmental | Geotechnical | Materials 10
Sample # Material Description Sample Location PCB
Content
PCB-2A
Gray and brown window sealant at exterior window between metal and concrete
East Elevation North end ND <10 ppm
PCB-2B
Gray and brown window sealant at exterior window between metal and concrete
East Elevation center ND <10 ppm ppm = parts per million, < = less than laboratory reporting limit
5.4 Other Hazardous Building Materials
Terracon visually assessed survey area for the presence of mercury containing products such as fluorescent light tubes, HID bulbs, mercury switches, thermostats, and compact fluorescent light bulbs. Mercury-containing tubes, bulbs, switches, and thermostats should be removed from the fixtures or equipment without breakage and packaged for mercury reclamation as a universal waste through an appropriate vendor prior to removal of any fixtures. Additionally, the building was inspected for the presence of exit signs and emergency lighting with backup batteries. No testing was performed.
Select lighting ballasts were inspected for labeling indicating the absence of PCBs. Ballasts observed were labeled as non-PCB ballasts. All ballasts should be inspected prior to disposal to verify the presence or absence of PCBs. Ballasts should be assumed to be PCB-containing unless specified by the manufacturer’s label as containing “No PCBs”. Table IV provides a summary and estimated quantity of materials observed within the survey area of the building. No testing was performed.
Table IV Hazardous and Restricted Disposal Materials
Material Description General Locations Estimated Quantity
Suspect PCB Containing Materials
Fluorescent Light Ballasts Interior – 1st Floor 40
Transformers 1st – 6th Floor – All Dry Type – No PCB Fluids Expected
Mercury Containing Lighting & Equipment
Fluorescent Light Tubes Interior – 1st Floor 80
Equipment with Batteries
Exit Signs Interior – 1st and 5th Floors 2
N/A = Not Applicable
Terracon did not identify any equipment with refrigerants within the survey area. The SMUD vault was inaccessible at the time of the survey and therefore the presence of equipment with hazardous or restricted waste disposal requirements could not be verified.
Facilities | Environmental | Geotechnical | Materials 11
6.0 LIMITATIONS/GENERAL COMMENTS
Terracon performed limited destructive testing such as knocking holes in walls, dismantling of equipment or removal of protective coverings during the pre-renovation hazardous materials survey. Uncharacterized hidden materials may exist under existing finishes, equipment, or structural materials.
This hazardous materials survey was conducted in a manner consistent with the level of care and skill ordinarily exercised by members of the profession currently practicing under similar conditions in the same locale. The results, findings, conclusions, and recommendations expressed in this report are based on conditions observed during our survey at the subject site. The information contained in this report is relevant to the dates on which this survey was performed and should not be relied upon to represent conditions at a later date.
This report has been prepared on behalf of and exclusively for use by for specific application to their project as discussed. This report is not a bidding document. Contractors or consultants reviewing this report must draw their own conclusions regarding further investigation or remediation deemed necessary. Terracon does not warrant the work of regulatory agencies, laboratories, or other third parties supplying information which may have been used in the preparation of this report. No warranty, express or implied is made.
APPENDIX A
PRE-RENOVATION HAZARDOUS MATERIALS SURVEY
1227 O Street Sacramento, California
Terracon Project No. NB247034 May 20, 2024
ASBESTOS SAMPLE SUMMARY
HM # Material Description Sample # Sample Location Asbestos Content by Layer NESHAP
Category Condition
1 Concrete Slab
1A 4th Floor Electrical Closet 4B None detected (ND) N/A Good
1B 3rd Floor Electrical Closet 3A ND N/A Good
1C Electrical Closet 2A ND N/A Good
1D Roof at large electrical panels center of floor ND N/A Good
1E 5th Floor Electrical Closet 5A ND N/A Good
2 Plaster Walls
2A 4th Floor Electrical Closet 4B ND N/A Good
2B 4th Floor Electrical Closet 4A ND N/A Good
2C 3rd Floor Electrical Closet 3A ND N/A Good
2D 5th Floor Electrical Closet 2A ND N/A Good
2E 2nd Floor Electrical Closet 2A ND N/A Good
2F 1st Floor Column Southwest Corner Office ND N/A Good
2G 6th Floor Electrical Closet 6A ND N/A Good
3 Fire Stop
3A 4th Floor Electrical Closet 4B ND N/A Good
3B 3rd Floor Electrical Closet 3B ND N/A Good
3C 2nd Floor Electrical Closet 2B ND N/A Good
# Sample Location Asbestos Content by Layer NESHAP
Category Condition
4 4" Grey Cove Base with Tan Glue
4A 4th Floor Transformer Room ND N/A Good
4B 4th Floor Transformer Room ND N/A Good
4C 4th Floor Transformer Room ND N/A Good
5 12" Grey Vinyl Flooring Tile with Black Mastic
5A 4th Floor Transformer Room ND N/A Good
5B 4th Floor Transformer Room ND N/A Good
5C 4th Floor Transformer Room ND N/A Good
6 Drywall with Joint Compound Rough Finish
6A 4th Floor Transformer Room North ND N/A Good
6B 4th Floor Transformer Room South ND N/A Good
6C 4th Floor Transformer Room East ND N/A Good
7 Drywall Texture
7A 4th Floor Transformer Room North ND N/A Good
7B 4th Floor Transformer Room South ND N/A Good
7C 4th Floor Transformer Room East ND N/A Good
8 2'x4' White Ceiling Tile (2'x2' Pattern)
8A 4th Floor Transformer Room Ceiling ND N/A Good
8B 4th Floor Transformer Room Ceiling ND N/A Good
8C 4th Floor Transformer Room Ceiling ND N/A Good
# Sample Location Asbestos Content by Layer NESHAP
Category Condition
9 Grey Fireproofing (on Deck)
9A 4th Floor Transformer Room ND N/A Good
9B 3rd Floor Transformer Room North (skip 2nd floor, no box) ND N/A Good
9C 5th Floor Above Break Room Panel PNL5LD ND N/A Good
9D 5th Floor Above Electrical Box 5LC1 ND N/A Good
9E 6th Floor Above Transformer Room ND N/A Good
9F 1st Floor Office adjacent to vault ND N/A Good
9G 1st Floor Office Center of office Northeast ND N/A Good
10 Drywall/Joint Compound (Building)
10A 3rd Floor Electrical Closet 3A hallway wall West ND N/A Good
10B 2nd Floor Electrical Closet 2A hallway wall West ND N/A Good
10C 5th Floor Electrical Closet 5A hallway wall West ND N/A Good
10D 6th Floor Electrical Closet 6A ND N/A Good
11 Fiberglass Panel with Glue
11A 3rd Floor Transformer Room walls West ND N/A Good
11B 3rd Floor Transformer Room wall East ND N/A Good
11C 3rd Floor Transformer Room walls North ND N/A Good
# Sample Location Asbestos Content by Layer NESHAP
Category Condition
12 8" Green Ceramic Tile with Grout and Mortar
12A 3rd Floor Transformer Room ND N/A Good
12B 3rd Floor Transformer Room ND N/A Good
12C 3rd Floor Transformer Room ND N/A Good
13 4"x8" Green Ceramic Tile with Grout and Mortar
13A 3rd Floor Transformer Room ND N/A Good
13B 3rd Floor Transformer Room…