This document is a set of Questions and Answers related to a federal contract opportunity for Pump and Motor Replacement at the United States Department of Agriculture (USDA) Agricultural Research Service (ARS) location in Peoria, Illinois.

The key details are:

  • The contract opportunity is for cooling tower pump and motor replacements, with an estimated value between $100,000 and $250,000.
  • The period of performance is 60 calendar days after receipt of the Notice to Proceed.
  • A site visit is scheduled for October 1, 2024, and proposals are due October 8, 2024.
  • The solicitation is a Total Small Business Set-Aside using the Contract Opportunities on SAM.gov website.
  • The NAICS code is 238290 with a $22.0 Million small business size standard.
  • A Bid Guarantee, Performance Bond, and Payment Bond will be required.
  • The Questions and Answers cover topics such as reuse of existing insulation and cladding, use of vibration isolators, and pricing of valve replacements.

View the file

Other files for this federal contract opportunity

Other files attached to Pump and Motor Replace, newest first.
File Type Posted
Sol_12505B24Q0365_Amd_0001.pdf PDF
Question and Answer.pdf PDF
1442 12505B24Q0365.pdf PDF
Wage Determination.pdf PDF
Statement of Work.pdf PDF
Past Performance Questionnaire.pdf PDF
ARS-371.pdf PDF
ARS-372.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Q: Should an add alternative be included or should it be incorporated into the price for heat trace?

A: Existing heat trace will only require replacement if damaged during the installation process. Pricing should reflect your risk tolerance.

Q: Given the unknown current state of the existing valves. Should there be an additional alternative price for those valves? As well as obvious rusted hardware?

A: This is not a written requirement but voluntary alternates are acceptable subject to CO approval. Intention is to reuse/maintain existing

Q: Should bids include vibration isolators and pads as a precaution or an add alternative?

A: Bid requirements reflect replacement of grout bed, anchor bolts, and mounting plate per manufacturer’s written installation requirements. Recommendations for a more robust, trouble free installation are welcome and should be submitted as a voluntary alternate subject to CO approval. Pictures provided of existing installation for pump 1/3/4/6 for reference.

Q: What is the weight rating of the concrete bad leading to towers? Should 3/4” plywood be factored in?

A: We do not have that information

Q: Can existing insulation and metal cladding be re-utilized or is it required to be replaced?

A: If the integrity of the existing insulation and metal cladding can be retained, it is acceptable to be re-utilized. If damaged during installation activities, it should be replaced. Pricing should reflect your risk tolerance.