Questions Responses to Industry Questions.pdf
PDF 63 KB Posted
- Solicitation number
- 12505B24Q0118
About this file
This document contains questions and responses related to Solicitation 12505B24Q0118 for the procurement, installation, setup, and commissioning of a new cage wash. The solicitation is a Request for Quote (RFQ) issued by the Department of Agriculture Agricultural Research Service Field Research Implementation and Information Delivery Midwest Area.
The key details include:
- The solicitation is a 100% Total Small Business Set-aside with a NAICS code of 332999 and a PSC code of 6640.
- The Government anticipates awarding a Firm Fixed Price contract.
- Vendors must submit quotes electronically and include pricing, technical specifications, and a completed FAR Provision 52.212-3.
- The basis for award is Lowest Price Technically Acceptable (LPTA).
- The Government will not hold a site survey, but drawings are available. Vendors are responsible for providing all chemicals required for startup and commissioning plus an additional 15-gallon barrel/tote for each chemical.
- The contractor shall have 365 days from the "Notice to Proceed" to complete the project, with 90 days for onsite work.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 3 Vivarium Cage Wash Installation Drawings.pdf | ||
| Attachment 2 QASP.pdf | ||
| RFQ 12505B24Q0118.pdf | ||
| RFQ 12505B24Q0118.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions from Industry
12505B24Q0118
Procurement, install, setup and commission of new Cage Wash
Q1. What is the current elevator size? Is there a freight elevator?
Response: The elevator door size is 54"W x 96" H and the internal dimensions are
65.75"W x 99"D x 120"H. The air lock door size is 66”W X 80.5” H and the airlock is
25.5’ long. Per the specification “Disassembled unit sections shall pass through a 36” W x 80” H door opening.” Please refer to the drawings .
Q2. Is it possible for a site survey to see the pathway to washroom and layout of washroom?
Response: A site survey will not be held, please refer to the drawings
Q3. Are we responsible for disconnecting the current washer?
Response: No, the current washers will remain in operation.
Q4. Please provide clarification on “provide chemicals”?
Response: Chemicals needed for chemical treatment, Acid cycles, Alkaline cycles, detergent for cycles and any other chemical required shall be provided for startup, commissioning and an additional 15-gallon barrel/tote for each chemical.