File Type Posted
Asbestos Management Plan 2019.pdf PDF
AsbestosOM ProgramFinal 2019.pdf PDF
Asbestos Flooring.ppt PPT presentation
Questions on Solicitation 12505B21Q0027.docx DOCX document
SF1449 Morris Janitorial.pdf PDF
Janitorial SOW updated 2021.docx DOCX document
SF1449 Morris Janitorial.pdf PDF
Wage Determination for Morris MN.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bldg. 1,2,3,8

Morris Asbestos Containing Building Materials 2005
IDSAMPLE #INSPECTORLOCATIONFunctional AreaMATERIAL DESCRIPTIONQUANTITY OF MATERIALMATERIAL CATEGORYACMFriableMATERIAL CONDITIONDATE/INSP of LAST INSPECTIONPhotoMapNotesDate of Abatement
MapMap
1A1-9-20-2005-aRJRm 24Efloorgrey 9"x9" tileflooringYN9/20/05HPIM0497.jpgBuilding 1z
1B1-9-20-2006-bRJRm 24Efloorglueflooring adhesiveNN9/21/05HPIM0497.jpgBuilding 1
22-9-20-2005-NorthRJRM 24Aabove suspended ceilingpipe insulationTSIYYgood9/20/05HPIM0498.jpgBuilding 1
33-9-20-2005-SouthRJRM 24Aabove suspended ceilingpipe insulationTSIYYgood9/21/05HPIM0498.jpgBuilding 1
4A4-9-20-2005-aRJRM 23entry area flooroff white 12"x12" tileflooringNNgood9/20/05HPIM0499.jpgEntrance hall adjacent to Office Rm 22
4B4-9-20-2005-bRJRM 23entry area floormastic for off white 12"x12" tileflooring adhesive?Ngood9/20/05HPIM0499.jpgBuilding 1
5A5-9-20-2005-aRJRM 33chem lab flooroff white 9"x9" tileflooringYNgood9/20/05HPIM0500.jpgBuilding 1
5B5-9-20-2005-bRJRM 33chem lab floormastic for off white 9"x9" tileflooringYNgood9/20/05HPIM0500.jpgBuilding 1
xNo sample takenRJRM 32&40chem lab floorgreen 9"x9" tileflooringPACMNgood9/20/2005-visualDec. 2007 -- RM 32, Jan. 2008 RM 40
66-9-20-2005RJRM 32above suspended ceilingpipe insulationTSIYNgood9/20/05HPIM0501.jpgNote: Cold Water pipe abatement, but likely other pipes with ACMReplace water pipe 2012
77-9-20-2005RJRm 14 brbexhaust stack of boilerpipe insulationTSINYgood9/20/05HPIM0502.jpgThere was abatement in 1980's so probably ok, checked sample earlier was okSee 2013 Report - Boiler Project
xNo sample takenRJRM 30 , 34, womens bathrmsuspended ceilingsmall old square ceiling tile (painted white)ceiling tileNYgood9/20/05ceiling tiles throughout building are NOT suspect for containing asbestos per Ralph Jesse
88-9-20-2005RJRm 15greenhouse accesspipe insulationTSINYgood9/20/05HPIM0503.jpgSee 2013 Report - Boiler Project
99-9-20-2005RJRm 15 SW cornergreenhouse accesspipe insulationTSIYYgood9/20/05HPIM0504.jpg2013 - Boiler Project
10A10-9-20-2005-aRJHall 126floorlight grey w. brown specks 12"x12" floor tileflooringYNgood9/20/05HPIM0505.jpgthis tile is found thoughout building #8
10B10-9-20-2006-bRJHall 126flooring mastic (glue)adhesive for light grey w. brown specks 12"x12" floor tileflooring adhesiveYNgood9/21/05HPIM0505.jpgthis tile is found thoughout building #8
1111-9-20-2005RJRM 102 - 105above suspended ceilingventilation ductcement pipeYNgood (see note)9/20/05HPIM0506.jpgpipe near hood stack in rm 148 is not in good condition - Building 8
xNo sample takenRJRm 32, 38, 102 & 148fume hoodtransite panelscement sheetPACMNgood9/20/05AsbestosTransitePanelsInHood.JPG
151-9-21-2005RJattic above rm 13original flat roofroof tarroofing adhesive / sealantYNgood9/21/05HPIM0508.jpgsimilar material was used in this area to seal roof penetrations through old flat roof & coat similar openings
144-9-21-2005RJRm 114 (tile stored in box)suppliesblack 12"x12" floor tileflooringNNvery good9/21/05HPIM0513.jpgthese are replacement tile for the black tile used in bulding 8
xL0404020-1RJRm 14 brbsteam pipingpipe insulationTSINYnot good4/12/04Room14P3.jpg2013 boiler project
xL0404020-2RJRm 14 brbsteam pipingpipe insulationTSINYnot good4/12/04Room14P2.jpg2013 boiler project
xL0404020-4ARJRm 15floorgrey 9"x9" tileflooringYNnot good4/12/04Asbestos Floor1.jpgtested positive, same tile appears to be used in other locationsAug-07
xL0404020-4BRJRm 15flooring mastic (glue)glueflooring adhesiveNNgood4/12/04Asbestos Floor1.jpgAug-07
122-9-21-2005RJRM 45 - Soil processing areaoverheadpipe insulationTSIYYNOT good9/21/05HPIM0510.jpgwater pipes extend over rms 45,46,47 Building 3Aug-07
133-9-21-2005RJRM 45 - Soil processing areastand-alone equipmentDispatch oven door gasketgasketYYgood9/21/05HPIM0512.jpgthese ovens will be replaced this year2005
none takenRJDroptower "Storage" Roomfloorfloor tileflooring?Ngood6/18/08
none takenRJRM 56G - Oven Roomstand-alone equipmentOld oven door gasketgasket?Ngood6/18/08about 2016
NCSCRL-1UoM Dean OlsenLab 117Rob Gardner Labfloor tileflooringNNnot good5/2/17NO ACMN.A.

&F Page &P&R&A Glossary of terms ACM - Asbestos Containing Material PACM - Probably Asbeston Containing Material RJ - Ralph Jesse

For convenience, building 3 and building 8 data are duplicated in this worksheet.

Note - Column added 10/4/2007 for Date of abatement completed. Entire row filled in green when abatement complete. SWW

Note - 2013 Replace Boiler Project should have removed any remaining ACM in Boiler Room 14 and RM15.

Also Suspended Ceiling in Building 8 was found to contain Asbestos and was replaced in 2013.

See 2013 report. SWW

RM56G - Oven Room Oven listed in Row 31 has been removed and replaced witi new equipment. SWW HPIM0497.jpg HPIM0497.jpg HPIM0498.jpg HPIM0498.jpg HPIM0499.jpg HPIM0500.jpg HPIM0501.jpg HPIM0502.jpg Map HPIM0503.jpg HPIM0504.jpg HPIM0505.jpg HPIM0505.jpg HPIM0499.jpg HPIM0500.jpg HPIM0506.jpg AsbestosTransitePanelsInHood.JPG HPIM0508.jpg HPIM0513.jpg Room14P3.jpg Room14P2.jpg Asbestos Floor1.jpg Asbestos Floor1.jpg Map HPIM0510.jpg HPIM0512.jpg water pipes extend over rms 45,46,47 Building 3

BLDG. 3

Morris Asbestos Containing Building Materials 2005
IDSAMPLE #INSPECTORLOCATIONFunctional AreaMATERIAL DESCRIPTIONQUANTITY OF MATERIALMATERIAL CATEGORYACMFriableMATERIAL CONDITIONDATE/INSP of LAST INSPECTIONPhotoMapNotesDate of Abatement
122-9-21-2005RJRM 45 - Soil processing areaoverheadpipe insulationTSIYYNOT good9/21/05HPIM0510.jpgwater pipes extend over rms 45,46,47Aug-07
133-9-21-2005RJRM 45 - Soil processing areastand-alone equipmentDispatch oven door gasketgasketYYgood9/21/05HPIM0512.jpgthese ovens will be replaced this yearAug-07

&F Page &P&R&A Note - Floor tile in Soil Weighing room - Rm 45B Asbestos abatement complete in August 2007. Building 3 now has no known PACM. 10/4/2007 SWW HPIM0510.jpg HPIM0512.jpg water pipes extend over rms 45,46,47

BLDG. 4

Morris Asbestos Containing Building Materials 2005
IDSAMPLE #INSPECTORLOCATIONFunctional AreaMATERIAL DESCRIPTIONQUANTITY OF MATERIALMATERIAL CATEGORYACMFriableMATERIAL CONDITIONDATE/INSP of LAST INSPECTIONPhotoMap
Building inspected on 9/21/2005, No PACM found

&F Page &P&R&A

BLDG. 5

Morris Asbestos Containing Building Materials 2005
IDSAMPLE #INSPECTORLOCATIONFunctional AreaMATERIAL DESCRIPTIONQUANTITY OF MATERIALMATERIAL CATEGORYACMFriableMATERIAL CONDITIONDATE/INSP of LAST INSPECTIONPhotoMap
Building inspected on 9/21/2005, No PACM found

&F Page &P&R&A

BLDG. 6 - Butler

Morris Asbestos Containing Building Materials 2005
IDSAMPLE #INSPECTORLOCATIONFunctional AreaMATERIAL DESCRIPTIONQUANTITY OF MATERIALMATERIAL CATEGORYACMFriableMATERIAL CONDITIONDATE/INSP of LAST INSPECTIONPhotoMapDate of Abatement
Doom & Cuyperssouth 1/3 of buildingWallsvermiculiteInsulationNYpoorly containedPhotoMap
L0404020-6RJsouth 1/3 of buildingWallsvermiculiteInsulationYYpoorly containedApr-04PhotoMap
sent to MVA LabsMVA Scientific Consultants

3300 Breckinridge Boulevard Suite 400 Duluth, Georgia 30096 Phone: 770.662.8509 FAX: 770.662.8532 RJ south 1/3 of building Walls vermiculite Insulation ? Y poorly contained Sept. 2005 Photo Map

Page &P&R&F Page &P&R&A

BLDG. 7

Morris Asbestos Containing Building Materials 2005
IDSAMPLE #INSPECTORLOCATIONFunctional AreaMATERIAL DESCRIPTIONQUANTITY OF MATERIALMATERIAL CATEGORYACMFriableMATERIAL CONDITIONDATE/INSP of LAST INSPECTIONPhotoMap
Building inspected on 9/21/2005, No PACM found

&F&RPage &P Page &P&R&A

BLDG. 8

Morris Asbestos Containing Building Materials 2005
IDSAMPLE #INSPECTORLOCATIONFunctional AreaMATERIAL DESCRIPTIONQUANTITY OF MATERIALMATERIAL CATEGORYACMFriableMATERIAL CONDITIONDATE/INSP of LAST INSPECTIONPhotoMapNotesDate of Abatement
10A10-9-20-2005-aRJHall 126floorlight grey w. brown specks 12"x12" floor tileflooringYNgood9/20/05HPIM0505.jpgthis tile is found thoughout building #8
10B10-9-20-2006-bRJHall 126flooring mastic (glue)adhesive for light grey w. brown specks 12"x12" floor tileflooring adhesiveYNgood9/21/05HPIM0505.jpgthis tile is found thoughout building #9
1111-9-20-2005RJRM 102 - 105above suspended ceilingventilation ductcement pipeYNgood (see note)9/20/05HPIM0506.jpgpipe near hood stack in rm 148 is not in good condition
xNo sample takenRJrm 102 & 148fume hoodtransite panelscement sheetPACMNgood9/20/05AsbestosTransitePanelsInHood.JPG
144-9-21-2005RJRm 114 (tile stored in box)suppliesblack 12"x12" floor tileflooringNNvery good9/21/05HPIM0513.jpgthese are replacement tile for the black tile used in bulding 8not required
xL0404020-3RJRm 105plumbingsink bowl insulationTSINNnot good4/12/04material in cabinet under sink in lab 105not required
xL0404020-5RJRm 114steam pipingpipe insulationTSINYgood4/12/04EquipmentRoomElbow.jpg2013 Replace Boiler Project - Abatement and Coverter Removednot required
NASee Legend Report in folder Note 1: belowLegendBuilding 8 Labs and OfficesCeiling Tile2x4 drop in (labs) and 1x1 office ceiling tilegrid ceilingYNgood2013See Note 2 belowDiscovered Asbestos in Ceiling Tile during Hazzmat Inspections (Legend) for 2013 Boiler ProjectNov-13
NCSCRL-1UoM Dean OlsenLab 117Rob Gardner Labfloor tileflooringNNnot good5/2/17NO ACMN.A.
Note 1: \\MW45-WS1\Safety Committee-SHEM\Asbestos Map and Hazmatt Reports\Reports and Studies\2013 Boiler Project hazzmat
Note 2: \\MW45-WS1\Safety Committee-SHEM\Asbestos Map and Hazmatt Reports\Reports and Studies\Wagner Facilities Project Asbestos abatement ceiling tile bldg 8\Photos
Note May 1, 2017: Floor tile and glue in Lab 117 was tested and No ACM was found. SWW

Page &P&R&F Page &P&R&A Johnson, Jane - ARS:

check the room number. Where is rom 148?

HPIM0505.jpg HPIM0505.jpg HPIM0506.jpg AsbestosTransitePanelsInHood.JPG HPIM0513.jpg EquipmentRoomElbow.jpg

BLDG. 9

Morris Asbestos Containing Building Materials 2005
IDSAMPLE #INSPECTORLOCATIONFunctional AreaMATERIAL DESCRIPTIONQUANTITY OF MATERIALMATERIAL CATEGORYACMFriableMATERIAL CONDITIONDATE/INSP of LAST INSPECTIONPhotoMap
Building inspected on 9/21/2005, No PACM found
NOTE -

&F Page &P&R&A See note on floor tile on Bldg. 8 tab.

10/4/2007 SWW

BLDG. 11

Morris Asbestos Containing Building Materials 2005
IDSAMPLE #INSPECTORLOCATIONFunctional AreaMATERIAL DESCRIPTIONQUANTITY OF MATERIALMATERIAL CATEGORYACMFriableMATERIAL CONDITIONDATE/INSP of LAST INSPECTIONPhotoMap
Building 11 inspected on 9/21/2005, No PACM found