| File | Type | Posted |
|---|---|---|
| Asbestos Management Plan 2019.pdf | ||
| AsbestosOM ProgramFinal 2019.pdf | ||
| Asbestos Flooring.ppt | PPT presentation | |
| Questions on Solicitation 12505B21Q0027.docx | DOCX document | |
| SF1449 Morris Janitorial.pdf | ||
| Janitorial SOW updated 2021.docx | DOCX document | |
| SF1449 Morris Janitorial.pdf | ||
| Wage Determination for Morris MN.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bldg. 1,2,3,8
| Morris Asbestos Containing Building Materials 2005 | ||||||||||||||||
| ID | SAMPLE # | INSPECTOR | LOCATION | Functional Area | MATERIAL DESCRIPTION | QUANTITY OF MATERIAL | MATERIAL CATEGORY | ACM | Friable | MATERIAL CONDITION | DATE/INSP of LAST INSPECTION | Photo | Map | Notes | Date of Abatement | |
| Map | Map | |||||||||||||||
| 1A | 1-9-20-2005-a | RJ | Rm 24E | floor | grey 9"x9" tile | flooring | Y | N | 9/20/05 | HPIM0497.jpg | Building 1 | z | ||||
| 1B | 1-9-20-2006-b | RJ | Rm 24E | floor | glue | flooring adhesive | N | N | 9/21/05 | HPIM0497.jpg | Building 1 | |||||
| 2 | 2-9-20-2005-North | RJ | RM 24A | above suspended ceiling | pipe insulation | TSI | Y | Y | good | 9/20/05 | HPIM0498.jpg | Building 1 | ||||
| 3 | 3-9-20-2005-South | RJ | RM 24A | above suspended ceiling | pipe insulation | TSI | Y | Y | good | 9/21/05 | HPIM0498.jpg | Building 1 | ||||
| 4A | 4-9-20-2005-a | RJ | RM 23 | entry area floor | off white 12"x12" tile | flooring | N | N | good | 9/20/05 | HPIM0499.jpg | Entrance hall adjacent to Office Rm 22 | ||||
| 4B | 4-9-20-2005-b | RJ | RM 23 | entry area floor | mastic for off white 12"x12" tile | flooring adhesive | ? | N | good | 9/20/05 | HPIM0499.jpg | Building 1 | ||||
| 5A | 5-9-20-2005-a | RJ | RM 33 | chem lab floor | off white 9"x9" tile | flooring | Y | N | good | 9/20/05 | HPIM0500.jpg | Building 1 | ||||
| 5B | 5-9-20-2005-b | RJ | RM 33 | chem lab floor | mastic for off white 9"x9" tile | flooring | Y | N | good | 9/20/05 | HPIM0500.jpg | Building 1 | ||||
| x | No sample taken | RJ | RM 32&40 | chem lab floor | green 9"x9" tile | flooring | PACM | N | good | 9/20/2005-visual | Dec. 2007 -- RM 32, Jan. 2008 RM 40 | |||||
| 6 | 6-9-20-2005 | RJ | RM 32 | above suspended ceiling | pipe insulation | TSI | Y | N | good | 9/20/05 | HPIM0501.jpg | Note: Cold Water pipe abatement, but likely other pipes with ACM | Replace water pipe 2012 | |||
| 7 | 7-9-20-2005 | RJ | Rm 14 brb | exhaust stack of boiler | pipe insulation | TSI | N | Y | good | 9/20/05 | HPIM0502.jpg | There was abatement in 1980's so probably ok, checked sample earlier was ok | See 2013 Report - Boiler Project | |||
| x | No sample taken | RJ | RM 30 , 34, womens bathrm | suspended ceiling | small old square ceiling tile (painted white) | ceiling tile | N | Y | good | 9/20/05 | ceiling tiles throughout building are NOT suspect for containing asbestos per Ralph Jesse | |||||
| 8 | 8-9-20-2005 | RJ | Rm 15 | greenhouse access | pipe insulation | TSI | N | Y | good | 9/20/05 | HPIM0503.jpg | See 2013 Report - Boiler Project | ||||
| 9 | 9-9-20-2005 | RJ | Rm 15 SW corner | greenhouse access | pipe insulation | TSI | Y | Y | good | 9/20/05 | HPIM0504.jpg | 2013 - Boiler Project | ||||
| 10A | 10-9-20-2005-a | RJ | Hall 126 | floor | light grey w. brown specks 12"x12" floor tile | flooring | Y | N | good | 9/20/05 | HPIM0505.jpg | this tile is found thoughout building #8 | ||||
| 10B | 10-9-20-2006-b | RJ | Hall 126 | flooring mastic (glue) | adhesive for light grey w. brown specks 12"x12" floor tile | flooring adhesive | Y | N | good | 9/21/05 | HPIM0505.jpg | this tile is found thoughout building #8 | ||||
| 11 | 11-9-20-2005 | RJ | RM 102 - 105 | above suspended ceiling | ventilation duct | cement pipe | Y | N | good (see note) | 9/20/05 | HPIM0506.jpg | pipe near hood stack in rm 148 is not in good condition - Building 8 | ||||
| x | No sample taken | RJ | Rm 32, 38, 102 & 148 | fume hood | transite panels | cement sheet | PACM | N | good | 9/20/05 | AsbestosTransitePanelsInHood.JPG | |||||
| 15 | 1-9-21-2005 | RJ | attic above rm 13 | original flat roof | roof tar | roofing adhesive / sealant | Y | N | good | 9/21/05 | HPIM0508.jpg | similar material was used in this area to seal roof penetrations through old flat roof & coat similar openings | ||||
| 14 | 4-9-21-2005 | RJ | Rm 114 (tile stored in box) | supplies | black 12"x12" floor tile | flooring | N | N | very good | 9/21/05 | HPIM0513.jpg | these are replacement tile for the black tile used in bulding 8 | ||||
| x | L0404020-1 | RJ | Rm 14 brb | steam piping | pipe insulation | TSI | N | Y | not good | 4/12/04 | Room14P3.jpg | 2013 boiler project | ||||
| x | L0404020-2 | RJ | Rm 14 brb | steam piping | pipe insulation | TSI | N | Y | not good | 4/12/04 | Room14P2.jpg | 2013 boiler project | ||||
| x | L0404020-4A | RJ | Rm 15 | floor | grey 9"x9" tile | flooring | Y | N | not good | 4/12/04 | Asbestos Floor1.jpg | tested positive, same tile appears to be used in other locations | Aug-07 | |||
| x | L0404020-4B | RJ | Rm 15 | flooring mastic (glue) | glue | flooring adhesive | N | N | good | 4/12/04 | Asbestos Floor1.jpg | Aug-07 | ||||
| 12 | 2-9-21-2005 | RJ | RM 45 - Soil processing area | overhead | pipe insulation | TSI | Y | Y | NOT good | 9/21/05 | HPIM0510.jpg | water pipes extend over rms 45,46,47 Building 3 | Aug-07 | |||
| 13 | 3-9-21-2005 | RJ | RM 45 - Soil processing area | stand-alone equipment | Dispatch oven door gasket | gasket | Y | Y | good | 9/21/05 | HPIM0512.jpg | these ovens will be replaced this year | 2005 | |||
| none taken | RJ | Droptower "Storage" Room | floor | floor tile | flooring | ? | N | good | 6/18/08 | |||||||
| none taken | RJ | RM 56G - Oven Room | stand-alone equipment | Old oven door gasket | gasket | ? | N | good | 6/18/08 | about 2016 | ||||||
| NCSCRL-1 | UoM Dean Olsen | Lab 117 | Rob Gardner Lab | floor tile | flooring | N | N | not good | 5/2/17 | NO ACM | N.A. |
&F Page &P&R&A Glossary of terms ACM - Asbestos Containing Material PACM - Probably Asbeston Containing Material RJ - Ralph Jesse
For convenience, building 3 and building 8 data are duplicated in this worksheet.
Note - Column added 10/4/2007 for Date of abatement completed. Entire row filled in green when abatement complete. SWW
Note - 2013 Replace Boiler Project should have removed any remaining ACM in Boiler Room 14 and RM15.
Also Suspended Ceiling in Building 8 was found to contain Asbestos and was replaced in 2013.
See 2013 report. SWW
RM56G - Oven Room Oven listed in Row 31 has been removed and replaced witi new equipment. SWW HPIM0497.jpg HPIM0497.jpg HPIM0498.jpg HPIM0498.jpg HPIM0499.jpg HPIM0500.jpg HPIM0501.jpg HPIM0502.jpg Map HPIM0503.jpg HPIM0504.jpg HPIM0505.jpg HPIM0505.jpg HPIM0499.jpg HPIM0500.jpg HPIM0506.jpg AsbestosTransitePanelsInHood.JPG HPIM0508.jpg HPIM0513.jpg Room14P3.jpg Room14P2.jpg Asbestos Floor1.jpg Asbestos Floor1.jpg Map HPIM0510.jpg HPIM0512.jpg water pipes extend over rms 45,46,47 Building 3
BLDG. 3
| Morris Asbestos Containing Building Materials 2005 | |||||||||||||||
| ID | SAMPLE # | INSPECTOR | LOCATION | Functional Area | MATERIAL DESCRIPTION | QUANTITY OF MATERIAL | MATERIAL CATEGORY | ACM | Friable | MATERIAL CONDITION | DATE/INSP of LAST INSPECTION | Photo | Map | Notes | Date of Abatement |
| 12 | 2-9-21-2005 | RJ | RM 45 - Soil processing area | overhead | pipe insulation | TSI | Y | Y | NOT good | 9/21/05 | HPIM0510.jpg | water pipes extend over rms 45,46,47 | Aug-07 | ||
| 13 | 3-9-21-2005 | RJ | RM 45 - Soil processing area | stand-alone equipment | Dispatch oven door gasket | gasket | Y | Y | good | 9/21/05 | HPIM0512.jpg | these ovens will be replaced this year | Aug-07 |
&F Page &P&R&A Note - Floor tile in Soil Weighing room - Rm 45B Asbestos abatement complete in August 2007. Building 3 now has no known PACM. 10/4/2007 SWW HPIM0510.jpg HPIM0512.jpg water pipes extend over rms 45,46,47
BLDG. 4
| Morris Asbestos Containing Building Materials 2005 | |||||||||||||
| ID | SAMPLE # | INSPECTOR | LOCATION | Functional Area | MATERIAL DESCRIPTION | QUANTITY OF MATERIAL | MATERIAL CATEGORY | ACM | Friable | MATERIAL CONDITION | DATE/INSP of LAST INSPECTION | Photo | Map |
| Building inspected on 9/21/2005, No PACM found |
&F Page &P&R&A
BLDG. 5
| Morris Asbestos Containing Building Materials 2005 | |||||||||||||
| ID | SAMPLE # | INSPECTOR | LOCATION | Functional Area | MATERIAL DESCRIPTION | QUANTITY OF MATERIAL | MATERIAL CATEGORY | ACM | Friable | MATERIAL CONDITION | DATE/INSP of LAST INSPECTION | Photo | Map |
| Building inspected on 9/21/2005, No PACM found |
&F Page &P&R&A
BLDG. 6 - Butler
| Morris Asbestos Containing Building Materials 2005 | ||||||||||||||
| ID | SAMPLE # | INSPECTOR | LOCATION | Functional Area | MATERIAL DESCRIPTION | QUANTITY OF MATERIAL | MATERIAL CATEGORY | ACM | Friable | MATERIAL CONDITION | DATE/INSP of LAST INSPECTION | Photo | Map | Date of Abatement |
| Doom & Cuypers | south 1/3 of building | Walls | vermiculite | Insulation | N | Y | poorly contained | Photo | Map | |||||
| L0404020-6 | RJ | south 1/3 of building | Walls | vermiculite | Insulation | Y | Y | poorly contained | Apr-04 | Photo | Map | |||
| sent to MVA LabsMVA Scientific Consultants |
3300 Breckinridge Boulevard Suite 400 Duluth, Georgia 30096 Phone: 770.662.8509 FAX: 770.662.8532 RJ south 1/3 of building Walls vermiculite Insulation ? Y poorly contained Sept. 2005 Photo Map
Page &P&R&F Page &P&R&A
BLDG. 7
| Morris Asbestos Containing Building Materials 2005 | |||||||||||||
| ID | SAMPLE # | INSPECTOR | LOCATION | Functional Area | MATERIAL DESCRIPTION | QUANTITY OF MATERIAL | MATERIAL CATEGORY | ACM | Friable | MATERIAL CONDITION | DATE/INSP of LAST INSPECTION | Photo | Map |
| Building inspected on 9/21/2005, No PACM found |
&F&RPage &P Page &P&R&A
BLDG. 8
| Morris Asbestos Containing Building Materials 2005 | |||||||||||||||
| ID | SAMPLE # | INSPECTOR | LOCATION | Functional Area | MATERIAL DESCRIPTION | QUANTITY OF MATERIAL | MATERIAL CATEGORY | ACM | Friable | MATERIAL CONDITION | DATE/INSP of LAST INSPECTION | Photo | Map | Notes | Date of Abatement |
| 10A | 10-9-20-2005-a | RJ | Hall 126 | floor | light grey w. brown specks 12"x12" floor tile | flooring | Y | N | good | 9/20/05 | HPIM0505.jpg | this tile is found thoughout building #8 | |||
| 10B | 10-9-20-2006-b | RJ | Hall 126 | flooring mastic (glue) | adhesive for light grey w. brown specks 12"x12" floor tile | flooring adhesive | Y | N | good | 9/21/05 | HPIM0505.jpg | this tile is found thoughout building #9 | |||
| 11 | 11-9-20-2005 | RJ | RM 102 - 105 | above suspended ceiling | ventilation duct | cement pipe | Y | N | good (see note) | 9/20/05 | HPIM0506.jpg | pipe near hood stack in rm 148 is not in good condition | |||
| x | No sample taken | RJ | rm 102 & 148 | fume hood | transite panels | cement sheet | PACM | N | good | 9/20/05 | AsbestosTransitePanelsInHood.JPG | ||||
| 14 | 4-9-21-2005 | RJ | Rm 114 (tile stored in box) | supplies | black 12"x12" floor tile | flooring | N | N | very good | 9/21/05 | HPIM0513.jpg | these are replacement tile for the black tile used in bulding 8 | not required | ||
| x | L0404020-3 | RJ | Rm 105 | plumbing | sink bowl insulation | TSI | N | N | not good | 4/12/04 | material in cabinet under sink in lab 105 | not required | |||
| x | L0404020-5 | RJ | Rm 114 | steam piping | pipe insulation | TSI | N | Y | good | 4/12/04 | EquipmentRoomElbow.jpg | 2013 Replace Boiler Project - Abatement and Coverter Removed | not required | ||
| NA | See Legend Report in folder Note 1: below | Legend | Building 8 Labs and Offices | Ceiling Tile | 2x4 drop in (labs) and 1x1 office ceiling tile | grid ceiling | Y | N | good | 2013 | See Note 2 below | Discovered Asbestos in Ceiling Tile during Hazzmat Inspections (Legend) for 2013 Boiler Project | Nov-13 | ||
| NCSCRL-1 | UoM Dean Olsen | Lab 117 | Rob Gardner Lab | floor tile | flooring | N | N | not good | 5/2/17 | NO ACM | N.A. | ||||
| Note 1: \\MW45-WS1\Safety Committee-SHEM\Asbestos Map and Hazmatt Reports\Reports and Studies\2013 Boiler Project hazzmat | |||||||||||||||
| Note 2: \\MW45-WS1\Safety Committee-SHEM\Asbestos Map and Hazmatt Reports\Reports and Studies\Wagner Facilities Project Asbestos abatement ceiling tile bldg 8\Photos | |||||||||||||||
| Note May 1, 2017: Floor tile and glue in Lab 117 was tested and No ACM was found. SWW |
Page &P&R&F Page &P&R&A Johnson, Jane - ARS:
check the room number. Where is rom 148?
HPIM0505.jpg HPIM0505.jpg HPIM0506.jpg AsbestosTransitePanelsInHood.JPG HPIM0513.jpg EquipmentRoomElbow.jpg
BLDG. 9
| Morris Asbestos Containing Building Materials 2005 | |||||||||||||
| ID | SAMPLE # | INSPECTOR | LOCATION | Functional Area | MATERIAL DESCRIPTION | QUANTITY OF MATERIAL | MATERIAL CATEGORY | ACM | Friable | MATERIAL CONDITION | DATE/INSP of LAST INSPECTION | Photo | Map |
| Building inspected on 9/21/2005, No PACM found | |||||||||||||
| NOTE - |
&F Page &P&R&A See note on floor tile on Bldg. 8 tab.
10/4/2007 SWW
BLDG. 11
| Morris Asbestos Containing Building Materials 2005 | |||||||||||||
| ID | SAMPLE # | INSPECTOR | LOCATION | Functional Area | MATERIAL DESCRIPTION | QUANTITY OF MATERIAL | MATERIAL CATEGORY | ACM | Friable | MATERIAL CONDITION | DATE/INSP of LAST INSPECTION | Photo | Map |
| Building 11 inspected on 9/21/2005, No PACM found |
File details come from the government source that posted it. Updated .