This is a Questions and Answers document for federal contract solicitation 124PSA27Q0004, a waste collection and recycling service requirement for a USDA facility.

The contract is a re-compete of previous contract 12805B22P0017 valued at $52,585.20. The requirement covers collection and disposal of trash and recycling at two locations: a Main Complex and a South Station/Farm. Services include weekly pickup of eight trash dumpsters (four 2-yard and four 4-yard containers) at the Main Complex, weekly pickup of one 4-yard trash dumpster at the South Station, and bi-weekly pickup of one 2-yard recycling dumpster at the Main Complex. The recycling dumpster accepts paper, plastics, and glass. All ten dumpsters are Government-owned and Government-maintained; contractors are responsible only for damage they cause. Required pickup occurs one day per week, Monday through Friday, with no truck size restrictions. The South Station location may require a gate key depending on pickup time. The contract period runs from December 1, 2026 through November 30, 2031 (base year plus four one-year option years). Quotes must be submitted to jennifer.busbea@usda.gov per revised terms and conditions. Evaluation will use lowest-price technically acceptable methodology, with only the lowest-priced offer initially evaluated for technical acceptability. The solicitation is a total small business set-aside with no specific prime contractor workshare requirement. Personnel identification and access checks are not required. A non-mandatory site visit is scheduled for November 12, 2026 at 10:00 AM CST, with the quote due date pushed back accordingly. Contractors may select any appropriately permitted disposal and recycling facility without separate Government approval. Wage determination requirements apply per FAR 52.222-62.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Answers for 124PSA27Q0004

1.We are performing independent research on the Combined Synopsis/Solicitation (124PSA27Q0004). We would like to know if this is a brand-new contract OR if there is (was) an incumbent performing these services. If not brand new, could you please provide the current / previous contract number and what the total contract value was?

• Previous contract number, 12805B22P0017 for $52,585.20.

2. Please confirm how quotes are to be submitted, including the email address(es), required subject line, accepted file format, and any page limit for the Technical Section.

• Submit your quote to jennifer.busbea@usda.gov per revised terms and conditions.

3. Is the contractor required to use a specific landfill, transfer station, or recycling facility?

Please also confirm which materials are accepted in the 2-yard recycling dumpster.

• Nothing specifically required that I know of. Paper, plastics and glass.

4. Please provide the amount of trash and recycling collected over the past 12–24 months, and the frequency of any extra pickups during that period.

• Amounts are not known. No extra pickups required.

5. Please confirm whether the 10 dumpsters are Government-owned?

• Government owned.

6. Please confirm the required pickup days and times for the Main Complex and the South Station/Farm, and any truck size or site access restrictions at either location.

• Required pickup is one day of the week in the timeframe of Monday through Friday.

No truck size restrictions. South location pickup site may require a key issued to unlock the gate depending on pickup time.

7. RFQ page 8 describes highest technically rated/fair-and-reasonable price, while pages 9–10 describe lowest-price technically acceptable. Which evaluation method governs?

• The Government will evaluate quotations based on the lowest price technically acceptable criteria. Only the lowest priced offer will be evaluated for Technical Acceptability. Should the lowest priced quote not receive an acceptable technical or past performance rating, the process will continue in order of lowest priced quote mailto:jennifer.busbea@usda.gov until the lowest price, technically acceptable offer with acceptable or neutral past performance is identified.

8. May an eligible small-business prime use a named local waste-collection subcontractor for field services and demonstrate technical capability through that team? Please confirm any required prime workshare, as 52.219-14 is unchecked.

• Yes. 52.219-14 is not applicable to this contract.

9. The SOW says the Government furnishes dumpsters. Please provide their lift/connection type, photographs or dimensions as needed, and the South Station Farm Building 33 address or map. Is an optional site check available, and is there any mandatory visit requirement?

• The dumpsters are rear lift type. No actual physical address for the south location.

Question on optional site check is unclear and cannot provide a response. A site visit is scheduled for November 12th, 2026 but not mandatory.

10. Please confirm that each pricing-schedule monthly rate includes the full weekly/every-other-week service throughout each stated year, and whether the six-month extension evaluation is added by the Government outside the workbook total.

• Yes

11. Period of performance. Line 0001 in the RFQ shows a period of performance of 12/01/2026 to 11/30/2031 with a delivery date of 11/30/2027, while the Statement of Work and Pricing Schedule show the base year as 12/01/2026 to 11/30/2027. Can you confirm the base year is 12/01/2026 to 11/30/2027, with each option year running 12 months after that?

• The base year is 12/01/2026-11/30/2027 and is listed on page two of the SF-1449.

The total period of performance for the base plus four option years is 12/01/2026- 11/30/2031.

12. Container counts. The Statement of Work lists 8 dumpsters at the Main Complex (4 two-yard and 4 four-yard) for weekly trash, 1 four-yard dumpster at the South Station/Farm for weekly trash, and 1 two-yard dumpster at the Main Complex for recycling every other week. Is that a total of 10 containers and does the Pricing Schedule's Main Complex trash line cover all 8 trash dumpsters?

• Yes

13. Recycling. What materials go in the recycling dumpster (single stream, cardboard only, or other), and does the Government have a preferred or required recycling facility?

• Paper, plastics and glass. No.

14. Containers. Are all dumpsters Government-owned and Government-maintained, including lids, locks and pads? Who is responsible for replacing or repairing a damaged container?

• Yes, the dumpsters are government owned. Government will repair or replace it. If contractor damages container, they will be responsible for replacement.

15. Access. Are there gate hours, escort requirements or days of the week when the trucks cannot enter either location? Can the pickup day be set by the Contractor, or will the COR assign it?

• Required pickup is one day of the week in the timeframe of Monday through Friday.

No truck size restrictions. South location pickup site may require a key issued to unlock the gate depending on pickup time.

16. Volume and history. Could you share the current fill levels (for example, how full the dumpsters typically are at weekly pickup) and the incumbent's current pricing or monthly cost, if it can be released?

• Amounts are not known. Previous contract number, 12805B22P0017 for $52,585.20.

17. Limitations on subcontracting. This is a total small business set-aside, and FAR 52.219- 14 is not checked in the RFQ. Can you confirm whether the limitations on subcontracting clause applies to this requirement?

• All clauses that apply for sub-contracting are checked.

18. Wage and benefits. The RFQ lists FAR 52.222-62 and shows a Statement of Equivalent Rates for Federal Hires of $23.31 for Refuse Collector. Can you confirm the Wage Determination in Attachment 3 and the health and welfare rate that applies to this requirement?

• The wage determinations that will apply to this contract are attached

19. Site visit. Is a site visit available before quotes are due on November 12?

• A site visit has been scheduled for Thursday, November 12th at 10:00AM CST and the quote due date has been pushed back.

20. Which evaluation method will be used? The RFQ describes both, the highest technically rated (no tradeoffs) and lowest price technically acceptable.

• The Government will evaluate quotations based on the lowest price technically acceptable criteria. Only the lowest priced offer will be evaluated for Technical Acceptability. Should the lowest priced quote not receive an acceptable technical or past performance rating, the process will continue in order of lowest priced quote until the lowest price, technically acceptable offer with acceptable or neutral past performance is identified.

21. FAR 52.219-14 (Limitations on Subcontracting) isn't checked. Does it apply to this set-aside, and can I subcontract the collection work?

• 52.219-14 is N/A. All subcontract clauses are checked.

22. On the pricing sheet, the Main Complex trash lines list 4 containers each (4 – 2yd and 4

– 4yd) but have a single monthly unit cost, and the total is calculated as 12 months x unit cost. Should the unit cost be one monthly price covering all 4 containers on that line, or a per-container monthly price? If it's per container, the sheet would not multiply by 4 and the total would be understated.

• The cost on the pricing sheet should be the total monthly cost

23. Can you share the current or prior contract pricing and typical container volumes?

• See response above

24. What type of dumpsters does the Government provide (front-load or roll-off), and who is responsible for replacing a damaged container?

• See response above

25. Locations and distance: What is the street address or map pin for South Station/Farm Building 33? Could you provide a site map marking all dumpster locations and truck entrances at both sites?

• See response above

26. Truck compatibility: Are the Government dumpsters front-load or rear-load? Are there any lifting, height, weight, turning-space or gate restrictions? Photos of the containers and approaches would help.

• See response above

27. Actual waste and recycling: Are recent collection weights or typical fill levels available for each site, including seasonal peaks? What materials go in the recycling dumpster, and are any special waste streams included beyond ordinary municipal solid waste?

• No. Paper, plastics and glass.

28. Cleanup: Does removal of debris inside and around dumpsters mean loose-trash pickup only, or does it also include washing or disinfecting containers and pads? Is there a defined cleanup area or any recurring bulky waste?

• Loose trash only. Contractor is not responsible for cleaning or disinfecting.

29. Access and winter conditions: What service hours, gate/escort arrangements and truck-access restrictions apply? Who clears snow and ice from access roads and dumpster pads?

• See above for hours and truck access. Government clears snow and ice as they deem necessary.

30. Schedule and recovery: Are specific pickup days or time windows required? Does next-day recovery after a missed pickup mean the next calendar day, including weekends and holidays? How much notice is normally given for a requested alternate pickup day?

• See above for hours. Weekends and holidays are not required to work, next calendar day is permitted. 1-2 day notice would be acceptable.

31. Disposal and recycling facilities: May the contractor choose any appropriately permitted facility, or must facilities receive separate Government approval? Are any particular facilities required?

• Contractor may choose appropriate permitted facility.

32. Startup: What personnel identification, training records or access checks must be completed before service begins, and what is the usual processing time? What is the first required pickup date after the December 1 start?

• Personnel ID, training records or access checks are not required as they are not entering the facility. See above for hours. Required pickup is anticipated to be the first week the contract begins.

33. Submission. The RFQ gives your two addresses for questions but does not say where or how quotes are to be submitted. Should the quote be emailed to both of you, and is there a required subject line or file format?

• See revised terms and conditions

34. Posted file. The RFQ pages are numbered "of 14" but the posted PDF has 13 pages, and the SF 1449 lists FAR 52.212-3 as attached, which is not in the file. Is a page missing, and may offerors rely on their SAM representations for 52.212-3?

• See revised terms and conditions. 52.212-3 is N/A

35. Dumpsters. The Statement of Work says the Government furnishes the designated dumpsters. Please confirm that all ten containers at the Main Complex and the South Station are Government-owned and remain in place for the new contractor, so that the price covers collection and disposal only.

• Yes