Attachment 2 revised 120419

SCHEDULE OF ITEMS

SHULER CREEK STREAM RESTORATION PROJECT

Description
Measure
Quantity
Unit
Unit Price
Totals

SHULER CREEK STREAM RESTORATION PROJECT

1A. EQUIPMENT & LABOR

Track hoe w/ hydraulic thumb & operator
AQ
80
hours
Mobilization - Track hoe
LS
1
each
Track truck & operator
AQ
5
hours
Mobilization - Track truck
LS
1
each
Disposal of Log Crib material off-site
LS
1
each

1B. EROSION & SEDIMENT CONTROL

Seed – seed all disturbed area
CQ
0.40
acre
Matting - Erosion Control COIR-700
AQ
500
linear foot
Wooden stakes (2’ length)
AQ
600
Each

1C. MATERIALS

Boulders delivered to site (48"x24"x24")
AQ
610
ton
Non-woven geotextile (7’ wide)
AQ
800
linear foot
Silt Fence
AQ
300
Linear foot

Project Costs:

Any work shown on drawings or in specifications that is not included in bid items is incidental to other items.

Payment will be made on Actual Quantity (AQ) of work performed, for Lump Sum (LS) or “CQ” designating Contract Quantity.