Attachment 2 REVISED Schedule of Items 12042019.docx
DOCX document 14 KB Posted
- Solicitation number
- 12455020R0003
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SF 30 amendment 1 12455020R0003.pdf | ||
| Questions and Answers 1245502R0003.docx | DOCX document | |
| Revised Attachment 3 Specifications 120419.docx | DOCX document | |
| 12455020R0003 Attachment 3 Specifications.docx | DOCX document | |
| 12455020R0003 Attachment 1 Wage Determination.docx | DOCX document | |
| SF 1442 Continued.docx | DOCX document | |
| SF 1442 12455020R0003.pdf | ||
| 12455020R0003 Attachment 5 Experience Questionaire.docx | DOCX document | |
| 12455020R0003 Attachment 4 Plans Drawings Maps.pdf | ||
| 12455020R0003 Attachment 2 Schedule of Items.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 2 revised 120419
SCHEDULE OF ITEMS
SHULER CREEK STREAM RESTORATION PROJECT
| Description |
| Measure |
| Quantity |
| Unit |
| Unit Price |
| Totals |
SHULER CREEK STREAM RESTORATION PROJECT
1A. EQUIPMENT & LABOR
| Track hoe w/ hydraulic thumb & operator |
| AQ |
| 80 |
| hours |
| Mobilization - Track hoe |
| LS |
| 1 |
| each |
| Track truck & operator |
| AQ |
| 5 |
| hours |
| Mobilization - Track truck |
| LS |
| 1 |
| each |
| Disposal of Log Crib material off-site |
| LS |
| 1 |
| each |
1B. EROSION & SEDIMENT CONTROL
| Seed – seed all disturbed area |
| CQ |
| 0.40 |
| acre |
| Matting - Erosion Control COIR-700 |
| AQ |
| 500 |
| linear foot |
| Wooden stakes (2’ length) |
| AQ |
| 600 |
| Each |
1C. MATERIALS
| Boulders delivered to site (48"x24"x24") |
| AQ |
| 610 |
| ton |
| Non-woven geotextile (7’ wide) |
| AQ |
| 800 |
| linear foot |
| Silt Fence |
| AQ |
| 300 |
| Linear foot |
Project Costs:
Any work shown on drawings or in specifications that is not included in bid items is incidental to other items.
Payment will be made on Actual Quantity (AQ) of work performed, for Lump Sum (LS) or “CQ” designating Contract Quantity.