Revised_Attachment_4_Schedule_Of_Items.docx
DOCX document 14 KB Posted
- Solicitation number
- 12455019R0015
About this file
Revised Attachment 4 Schedule of Items
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SF_30_Amendment_1.pdf | ||
| Revised_Attachment_3_Project_Description.docx | DOCX document | |
| Revised_Attachment_2_Specifications.docx | DOCX document | |
| Attachment_5_Experience_Questionaire.docx | DOCX document | |
| Attachment_3_Project_Description.docx | DOCX document | |
| SF_1442.pdf | ||
| Attachment_1_Wage_Determination.docx | DOCX document | |
| Attachment_2_Specifications.docx | DOCX document | |
| Attachment_4_Schedule_of_Items.docx | DOCX document | |
| SF_1442_Cont.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Schedule of Items
Swannanoa Creek Stream Enhancement Project 2019
| Description |
| Measure |
| Quantity |
| Unit |
| Unit Price |
| Totals |
ITEM 1. Swannanoa Creek Stream Enhancement Project 2019 - Pre-Bid Modification#1
1A. EQUIPMENT & LABOR
| Track hoe w/ hydraulic thumb & operator |
| AQ |
| 40 |
| hours |
| Mobilization - Track hoe |
| LS |
| 1 |
| each |
| Track truck & operator |
| AQ |
| 10 |
| hours |
| Mobilization - Track truck |
| LS |
| 1 |
| each |
1B. EROSION & SEDIMENT CONTROL
| Seed all disturbed soil |
| CQ |
| 1.00 |
| acre |
| Erosion Control COIR-700 Matting |
| AQ |
| 150 |
| linear foot |
1C. MATERIALS
| Boulders (48"x24"x18") |
| AQ |
| 90 |
| ton |
| Non-woven geotextile |
| AQ |
| 30 |
| linear foot |
Project Costs:
Any work shown on drawings or in specifications that is not included in bid items is incidental to other items.
Payment will be made on Actual Quantity (AQ) of work performed, for Lump Sum (LS) or “CQ” designating Contract Quantity.