Attachment_4_Schedule_of_Items.docx
DOCX document 19 KB Posted
- Solicitation number
- 12455019R0015
About this file
Attachment 4 Schedule of Items
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SF_30_Amendment_1.pdf | ||
| Revised_Attachment_3_Project_Description.docx | DOCX document | |
| Revised_Attachment_2_Specifications.docx | DOCX document | |
| Revised_Attachment_4_Schedule_Of_Items.docx | DOCX document | |
| Attachment_5_Experience_Questionaire.docx | DOCX document | |
| Attachment_3_Project_Description.docx | DOCX document | |
| SF_1442.pdf | ||
| Attachment_1_Wage_Determination.docx | DOCX document | |
| Attachment_2_Specifications.docx | DOCX document | |
| SF_1442_Cont.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
12455019R0015 Attachment 4 Swannanoa Creek Enhancement Project Grandfather Ranger District Schedule of Items
Swannanoa Creek Stream Enhancement Project 2019
| Description |
| Measure |
| Quantity |
| Unit |
| Unit Price |
| Totals |
ITEM 1. Swannanoa Creek Stream Enhancement Project 2019
1A. EQUIPMENT & LABOR
| Track hoe w/ hydraulic thumb & operator |
| AQ |
| 36 |
| hours |
| Mobilization |
| LS |
| 1 |
| each |
1B. EROSION & SEDIMENT CONTROL
| Provide & maintain Pump-Around |
| LS |
| 1.00 |
| each |
| Seed all disturbed soil |
| CQ |
| 1.00 |
| acre |
| Erosion Control COIR-700 Matting |
| AQ |
| 150 |
| linear foot |
| Plantings - Container |
| AQ |
| 50 |
| each |
1C. MATERIALS
| Boulders (48'x24'x18') |
| AQ |
| 55 |
| ton |
| Non-woven geotextile |
| AQ |
| 300 |
| linear foot |
Project Costs:
Any work shown on drawings or in specifications that is not included in bid items is incidental to other items.
Payment will be made on actual work (AC) performed, for Lump Sum (LS) or “CQ” designating Contract Quantity.
File details come from the government source that posted it.