Attachment_4_Schedule_of_Items_Pisgah.xls
XLS spreadsheet 3 MB Posted
- Attached to
- USDA FS Pisgah RD Road Repair and Maintenance
- Solicitation number
- 12455019R0006
About this file
Schedule of Items
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Revised_Attachment_3_Description_of_Work_and_Drawings_4.15.19Rev1.pdf | ||
| SF_30_Amendment_1.pdf | ||
| Attachment_5_Experience_Questionaire.docx | DOCX document | |
| Attachment_1_Wages.docx | DOCX document | |
| SF_1442_Cont.docx | DOCX document | |
| SF_1442.pdf | ||
| Attachment_6_Accomplishment_Report.docx | DOCX document | |
| Attachment_2_Supplemental_Specs.pdf | ||
| Attachment_3_Desciption_of_Work_and_Drawings.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Totals
| Pisgah Road Maint Schedule of Items | ||||||
| ITEM NO. | DESCRIPTION | METHOD OF MEASURE | UNIT | Quantity | Unit Price | TOTALS |
| 15702 | Soil erosion (Silt Fence) | AQ | LF | 100.00 | $ - 0 | $ - 0 |
| 15707 | Wattles | AQ | EA | 0.00 | $ - 0 | $ - 0 |
| 20101 | Clearing and grubbing, |
disposal of tops and limbs (e)
| logs (e), and stumps (e) | CQ | Acre | 0.20 | $ - 0 | $ - 0 | ||
| 20301 | Removal of Structure | AQ | EA | 124.00 | $ - 0 | $ - 0 | |
| 20401b | Roadway excavation, compaction method (e) finishing method (e) | CQ | CY | 515.00 | $ - 0 | $ - 0 | |
| 20408 | Suitable Borrow Material | CQ | CY | 0.00 | $ - 0 | $ - 0 | |
| 20411 | Embankment Construction, Compaction Method e, Finishing Method e | CQ | CY | 2540.00 | $ - 0 | $ - 0 | |
| 20419 | Drainage Excavation, | ||||||
| type Ditch | CQ | LF | 2555.00 | $ - 0 | $ - 0 | ||
| 204.2 | Drainage Excavation, | ||||||
| type Rolling Dip | AQ | EA | 20.00 | $ - 0 | $ - 0 | ||
| 25105 | Keyed riprap, class B | AQ | Ton | 180.00 | $ - 0 | $ - 0 | |
| 301.05 | Subbase, Railroad Ballast Stone | ||||||
| Compaction Method A | AQ | Ton | 2720.00 | $ - 0 | $ - 0 | ||
| 301.09 | Aggregate Surface Course, |
Grading ABC
| Compaction Method A. | AQ | Ton | 8240.00 | $ - 0 | $ - 0 | ||
| 30307 | Roadway Reconditioning, | ||||||
| Compaction Method (d) | AQ | MI | 42.51 | $ - 0 | $ - 0 | ||
| 60201a | 24" Corrugated Metal Pipe Culvert, 14 Gauge, (0.079) | ||||||
| Aluminized-Steel Type 2 | AQ | LF | 3432.00 | $ - 0 | $ - 0 | ||
| 60201b | 30" Corrugated Metal Pipe Culvert, 14 Gauge, (0.079) | ||||||
| Aluminized-Steel Type 2 | AQ | LF | 68.00 | $ - 0 | $ - 0 | ||
| 60203a | 36" Corrugated Metal Pipe, 14 Gauge, (0.79) Aluminized Steel Type 2 | AQ | LF | 32.00 | $ - 0 | $ - 0 | |
| 60203b | 73"x55" Aluminum Pipe-Arch, 12 Gauge (0.109) | AQ | LF | 0.00 | $ - 0 | ||
| 60513 | Geotextile Material, Type I-B | AQ | SY | 560.00 | $ - 0 | $ - 0 | |
| 61901 | Gate Installation | LSQ | EA | 0.00 | $ - 0 | $ - 0 | |
| 62527 | Seeding, fertilizing, and mulching, hydraulic method | CQ | Acre | 0.25 | $ - 0 | $ - 0 | |
| 63301 | Permanent Traffic Control Signs | AQ | EA | 4.00 | $ - 0 | $ - 0 | |
| Total | $ - 0 |
&R&D &RPage 1 of 1
File details come from the government source that posted it.