Specifications Summary: Superior National Forest – Whiteface CG Well Replacement
This document is a Performance Work Statement (Specifications) for well equipment replacement at Whiteface Campground, Makinen, Minnesota, operated by the Superior National Forest's Laurentian Ranger District. The project scope includes replacing obsolete well equipment at Loop 3 with new serviceable components and extends through optional work on Loop 4. The base contract requires contractor responsibility for all labor, management, materials, equipment, transportation, and supplies. Work must comply with federal, state, and local regulations, including Minnesota Department of Health Chapter 4725 (water well licensing requirements), OSHA standards, and the National Electrical Code.
The primary work task involves replacing the submersible pump, buried Amtrol hydro-pneumatic pressure tank, frost-free hydrant, control box, pressure switch, pitless adapter, electrical wiring, and polyethylene water line on Loop 3. The contractor must extend the well casing from approximately 8 inches to 12–18 inches above grade through welding. Specific equipment requirements include a Woodford model S4H frost-proof hydrant (ADA-compliant), Amtrol Well-X-Tol model WX-202-UG pressure tank precharged at 30–35 psi, 3/4-horsepower submersible pump delivering minimum 10 gallons per minute at 240 volts, and "At The Well Controls-Baker Water Systems" pump controls with pressure switch. All piping must be polyethylene pipe rated 160 psi per ASTM standards with stainless steel clamps and brass inserts. The project must maintain public access to Loop 3 during the May 1–October 1 operating season, with work restricted to Monday–Friday, 8 a.m.–5 p.m., excluding federal holidays and 5 p.m.–8 a.m. The completion deadline is June 25, 2027. Hydrostatic testing is required at 1.5 times working pressure (or 150 psi, whichever is higher) with maximum allowable leakage of 0.012 gallons per joint per inch of pipe diameter over four hours. Water samples must be tested for Total Coliform bacteria by the Forest Service Water Lab in Ely before public use. Option items include pitless adapter replacement for Loop 3 (OP-1) and full equipment replacement plus optional pitless adapter replacement for Loop 4 (OP-2 and OP-3).
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Att 03_Wage Rates_260730.pdf | ||
| Att 01_Schedule of Items_261105.docx | DOCX document | |
| Sol_12445527Q0008.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Superior National Forest – Whiteface CG Well Replacement
Superior National Forest Whiteface CG Well Replacement
Specifications Dated: 2026
Background The Laurentian Ranger District within the Superior National Forest has a need to upgrade the well equipment at its Whiteface Campground location. Currently the well equipment located at the Whiteface Campground is obsolete and hard to find replacement parts for. The purpose of this contract is to replace the current well equipment with new equipment that can be serviced.
Photo of Whiteface CG Loop 3 Well
GENERAL REQUIREMENTS
1.0 Description of Services:
The contractor shall provide all management, supervision, labor, personnel, transportation, materials, equipment, and supplies, except as otherwise specified, necessary to provide services at the Whiteface Campground located in Makinen, MN. All work shall be performed in accordance with this statement of work and all federal, state, and local laws and regulations.
2.0 Location and Description:
The project is located within the Superior National Forest at the Whiteface Campground in Makinen, MN on the Whiteface Reservoir. The Whiteface Campground is located at the following address:
Whiteface Campground Whiteface Reservoir Road, County Rd 618 Makinen, MN 55763
2.1 Accessibility:
The site is accessible by a paved/gravel driveway and parking lot. The driveway and parking lots are routinely cleared of snow during the winter months.
3.0 Performance Period:
This project is expected to be completed before June 25th, 2027.
4.0 Prework Conference:
Prior to commencement of work, the Contracting Officer (CO) or the Contracting Officer Representative (COR) will schedule a meeting with the contractor to discuss the contract terms, work requirements and schedule. At the conference, the Contractor shall designate, in writing, the name and phone number of the Contractor’s on-site representative and their contract responsibilities and authority.
5.0 Contractor Representative:
Provide an onsite contract representative who will oversee the performance of the work specified in this contract. Designate in writing to the CO, the name of the contract representative and an alternate(s) who shall have the authority to authority to act for the Contractor on all contract matters relating to daily operation of this contract. Notify the CO/COR at least 10 work days in advance of any subsequent change of personnel in this position. Replacement personnel shall have the same level or better experience as the person being replaced.
6.0 Government-Furnished Items:
Not applicable- Contractor shall be responsible for all materials, supplies and services.
7.0 Hours of Operation:
The contractor may work Monday-Friday between the hours of 8 a.m. and 5:00 p.m. No work shall be done over the weekends.
8.0 Federal Holidays:
No work shall be performed on a Federal holiday.
9.0 Bio-Based Cleaning Products:
Not applicable
10.0 Qualifications Of Contractor Or Employees:
The Contractor and his/her employees shall be capable and experienced in the type of work mentioned below in section 14.0 Tasks. The on-site supervisor shall have experience and demonstrated ability in the tasks mentioned in section 14.0 Tasks. The Contractor shall provide a list of employees authorized to work under this contract.
11.0 Safety and General Requirements:
11.1 Safety
The Contractor shall comply with all Federal and State safety requirements for the type of work to be performed. Refer to the Occupation Safety and Health Standards (OSHA) for details of these and other safety requirements.
11.2 General
The Contractor shall take all precautions necessary to minimize and restore all construction impacts. All existing work and conditions impacted or modified by the contractor shall be replaced with like kind at the contractor’s expense.
11.2.1 Damages
All cutting, patching and repairs on systems shall be coordinated with COR at the weekly construction meeting in advance of the work. The Contractor is responsible to fix, and repair affected areas on un-approved work to the original condition or better.
11.2.2 Housekeeping
Keep project neat, orderly, and in a safe condition always. At the end of the work week a more thorough cleanup and policing shall be performed. All debris shall be removed and properly disposed.
11.2.3 Smoking
Smoking inside Forest Service buildings or near building entrances is prohibited, cigarette butts shall not be discarded on the ground.
12.0 Work Items:
Existing Conditions:
Whiteface Campground Loop 3 has a water system consisting of a well with submersible pump, a buried “Amtrol” hydro-pneumatic tank, 1- “Woodford” frost-free hydrant, and 1” diameter polyethylene water line. The water system is operated from approximately May 1 to October 1 annually. There is no chlorination, filtration or water treatment system connected to the water system.
General Requirements:
*It is required that all water well alteration/repair work be performed by a water well contractor who is licensed in Minnesota. [Minn. Rules, Chapter 4725].
Work consists of furnishing all labor, superintendence, materials, tools, equipment, transportation, and all other items not listed to upgrade the well equipment on the loop 3 well (see attached map for location). This includes the submersible pump, buried pressure tank, frost free hydrant, control box, pressure switch, pitless adapter, electrical wiring and all water line.
Work also consists of extending the well casing so that it is 12”-18” above grade. The removed hydrant will remain property of the U.S. government to be used as parts for the remaining hydrants. It will be the contractor’s responsibility to remove and dispose of the remaining equipment once the project has been completed.
Whiteface Campground loop 3 facilities shall be maintained open for public use during the normal operating season of May 1 to October 1. The contractor shall plan and conduct operations to allow full public use of the existing road access on loop 3 and safeguard public users from construction hazards.
The site shall be kept clear of debris. Holes and trenches shall be signed and barricaded as necessary in accordance with OSHA regulations. Visual and noise disturbances should be kept to a minimum. The contractor shall not work in the campground area between the hours of 5 p.m. and 8 a.m.
The contractor shall comply with the National Electrical Code, OSHA regulations, Minnesota Department of Health, and all state and local codes that are applicable to this contract.
Any equipment not listed below in the specifications that is necessary to furnish a complete operating well system shall be included in the contractor’s bid.
Sitework:
This section specifies excavation and backfill for the project including disposal of excess or unsuitable excavated material, furnishing, hauling and placing of backfill material, and grading.
The contractor will be responsible for locating any underground utilities prior to starting any excavation on the project.
The contractor shall notify the COR 48 hours prior to the start of excavating. Do not place backfill until installation of pipe, and appurtenances have been approved by the COR.
Granular bedding shall meet the requirements of MN DOT spec. 3149.2F and granular backfill shall mee the requirements of MN DOT spec. 3149.2D.
Backfill material shall consist of excavated or borrow material containing no rocks larger than 3 inches and containing no frozen or organic material.
Where trench excavation is inadvertently carried below proper elevation backfill with approved material and then compact as approved by the COR. Backfilling over piping shall be done after hydrostatic testing.
All shoring and sheeting shall be removed when construction is completed and shall be withdrawn in a manner that will prevent caving off the sides of the excavation.
Compact each layer of bedding and backfill in 12” lifts or less. The initial backfill layer above the water line shall be a 12” layer of “granular backfill”. Subsequent layers shall be 12” or less of “backfill” material.
Mound topsoil and compact with tracks or wheels of the backfilling equipment over the entire area.
After the utility installation and backfill has been completed the new ground surface shall be finished to a smooth, uniform grade and texture that is well blended into the original contours to show minimum evidence of construction activity.
Any excess or unsuitable excavated material that is to be removed from the project site can be disposed of at the Moose Line pit located approximately 5 miles from the project site near the intersection of FR 130 and SLC 16.
Pipe and Fittings Waterline pipes shall consist of polyethylene pipe; 160 psi pressure rated in conformance with ASTM D 2774 and ASTM F 2620 and shall be the product of a single manufacturer. Fittings shall be of the same class and pressure rating as pipe. Clamps shall be stainless steel and inserts shall be brass.
Hydrants The hydrant shall be frost proof and accessible. A “Woodford” model S4H (7 foot bury depth) shall be installed. The opening and closing device shall meet American Disability Act requirements of 5 pounds per square inch pressure. Hydrant shall have a built-in vacuum breaker and be installed in accordance with the manufacturer’s recommendation.
All fittings and connections shall be tested watertight and disinfected in accordance with AWWA C 601. Total Coliform samples will be taken by the COR to be tested at the Forest Service Water Lab located in Ely before the hydrant is opened for public use.
Waterlines and Appurtenances Install pipe in accordance with applicable AWWA and ASTM specifications and manufacturer’s recommendations.
Place pipe so that the full length of each section of pipe bears uniformly upon the formed bedding material. Keep interior of pipeline and joining surfaces clean.
Cutting the pipe for any reason shall be done in a neat manner so that it will not damage the pipe.
If pipe and fittings are assembled with a lubricant it must be nontoxic and water soluble and as recommended by the manufacturer.
Pipelines shall be installed in accordance with the attached original installation drawings.
Thrust blocks, if needed, shall be placed on undisturbed soil and bearing minimum 1/3 circumference of fitting. Thrust blocks shall be installed at all bends.
A hydrostatic test of the waterlines shall be performed prior to backfilling. The contractor shall furnish all equipment necessary for tests. Allow thrust blocks in test section to cure for at least
48 hours prior to testing. Flush all pipelines. Fill pipelines with water for a minimum of 24 hours before testing. The contractor shall furnish and install all temporary supports, blocking and plugs necessary to tun the hydrostatic test and shall remove them after testing.
Perform hydrostatic test in accordance with applicable AWWA specifications and in the presence of the COR. Test each section at 1.5 times the working pressure at the point of testing or at 150 psi whichever is the highest for a period of 2 hours. Maximum allowable overall leakage for a test section 0.012 gallons per joint per inch of pipe diameter for 4-hour period.
Repair any leakage at joints and repeat the test until leakage is reduced to an amount less than or equal to the maximum allowable. The COR shall be notified 24 hours before the test.
Submersible Pump and Pressure Tank The submersible well pump shall be capable of delivering a minimum of 10 gallons per minute, 3/4 horsepower, 240 volts. A flow control valve shall be installed to limit flow to the rates listed for the well and as verified by the COR after well pump testing is completed.
The underground pressure tank shall be an Amtrol Well-X-Tol model WX-202-UG precharged at 30-35lbs pressure operating at a 40-60 psi pressure cycle.
All piping in the well shall be threaded Schedule 80 polyvinyl chloride pipe meeting the requirements of ASTM 2464.
The pitless adapter shall be inspected by the contractor and COR. If the pitless adapter is still in good condition the adapter will not need to be replaced. However, it will be the responsibility of the contractor to supply and install new O-ring seals on the adapter. If the pitless adapter is found to be unusable there is an option item with this contract for the contractor to replace the pitless adapter with an adapter that is in accordance with the rules found in Minnesota Department of Health Chapter 4725.
Pump controls shall be “At The Well Controls-Baker Water Systems” with pressure switch.
Execution The contractor shall remove and discard existing well components. Hydrant is to be salvaged and become the property of the US Forest Service.
Current well casing is approximately 8” above grade. The contractor shall extend the well casing by welding on a new section of pipe, so the well casing is 12”-18” above grade.
Install a new submersible pump with pipe and fittings as shown in the attached drawing of the existing system. Pump depth will be determined after pump testing of wells.
Install pressure tank as shown in the attached drawing of the existing system. Pressure tank shall be installed in accordance with the Minnesota Department of Health Administrative Rules Chapter 4725.5350 Subp. 2.
The well shall be test pumped for a minimum period of 30 minutes to verify the well delivery rate. The submersible pump specified may be used to conduct the pump test. Once this rate is established a flow control valve shall be permanently installed in the hydrant supply line to limit the flow to the well’s delivery rate.
Disinfection of Water Supply System Disinfect all pump parts and pipes prior to installation into the well. Disinfect pipeline and entire water system after hydrostatic testing is completed in accordance with AWWA C 601. The contractor shall allow the COR to take water samples for Coliform Bacteriological testing after all chlorine has been flushed from the system.
Electrical The contractor shall replace the electrical wiring running from the new pump to the well control box. The electrical wiring that currently runs from the control box to the electrical panel can be used by the contractor if it is determined that the wiring is still in good condition (i.e. no corrosion or cracked insulation).
Demobilization The contractor shall thoroughly clean up the project site and remove all construction equipment and debris from the project.
Option Items OP-1: If the pitless adapter on the loop 3 well is found to be in an unusable condition this option is to replace the pitless adapter with a new pitless adapter.
OP-2: The same replacement specifications listed in base item 1 are used as the specifications for this option item. This option is to replace the well components on the loop 4 well system with the same equipment used to replace the loop 3 well system. The loop 4 well system has the same design as the loop 3 well system. The original well drilling log is included in the attachments.
OP-3: If the pitless adapter on the loop 4 well is found to be in an unusable condition this option is to replace the pitless adapter with a new pitless adapter.
13.0 Submittals
• Product Data: Submit manufacturer's current technical literature for each type of product being used.
14.0 Tasks:
Costs associated with preparation, materials, clean-up, and disposal shall be included in the following tasks.
T1: Replace well equipment on loop 3 well at Whiteface Campground
OP-1 (Option): Replace pitless adapter on loop 3 well OP-2 (Option): Replace well equipment on loop 4 well at Whiteface Campground OP-3 (Option): Replace pitless adapter on loop 4 well
Photos
Photo of Well and Hydrant Photo of Hydrant and Slab
Photo of Well Casing Height Photo of Well Breaker Panel
Photo of Inside Well Casing
Photo of Well Top with Cover Removed
Attachments
Original Well Drilling Log Loop 3 Well
Whiteface Campground Layout Loop 3 Well
Drawing of Existing Well Systems
Option: Original Well Drilling Log Loop 4 Well
Option: Whiteface Campground Layout Loop 4 Well
| Superior National Forest |
| Whiteface CG Well Replacement |
| Specifications |
| Background |
| GENERAL REQUIREMENTS |
| 3.0 Performance Period: |
| 6.0 Government-Furnished Items: |
| 11.0 Safety and General Requirements: |
| 11.1 Safety |
| The Contractor shall comply with all Federal and State safety requirements for the type of work to be performed. Refer to the Occupation Safety and Health Standards (OSHA) for details of these and other safety requirements. |
| 11.2 General |
| The Contractor shall take all precautions necessary to minimize and restore all construction impacts. All existing work and conditions impacted or modified by the contractor shall be replaced with like kind at the contractor’s expense. |
| 11.2.1 Damages |
| All cutting, patching and repairs on systems shall be coordinated with COR at the weekly construction meeting in advance of the work. The Contractor is responsible to fix, and repair affected areas on un-approved work to the original condition or bet... |
| 11.2.2 Housekeeping |
| Keep project neat, orderly, and in a safe condition always. At the end of the work week a more thorough cleanup and policing shall be performed. All debris shall be removed and properly disposed. |
| 11.2.3 Smoking |
| Smoking inside Forest Service buildings or near building entrances is prohibited, cigarette butts shall not be discarded on the ground. |
| 12.0 Work Items: |
| General Requirements: |
| Costs associated with preparation, materials, clean-up, and disposal shall be included in the following tasks. |
| T1: Replace well equipment on loop 3 well at Whiteface Campground |
| OP-1 (Option): Replace pitless adapter on loop 3 well |
| OP-2 (Option): Replace well equipment on loop 4 well at Whiteface Campground |