260422 GMF FR42C Road Recon - RFI log for Q and A.xlsx
XLSX spreadsheet 12 KB Posted
- Attached to
- GMF FR42C Road Reconstruction
- Solicitation number
- 12445526Q0052
- Issued by
-
Department of Agriculture Forest Service
About this file
This is a Request for Information (RFI) log documenting contractor inquiries and agency responses for Forest Service Solicitation No. 12445526Q0052, the GMF FR42C Road Reconstruction project. As of April 22, 2026, the log contains one recorded inquiry and response regarding erosion control specifications on project plans page C-01.
The single documented inquiry requests clarification on seed mixture designation for erosion control measures specified in the plans. The Forest Service response directs contractors to reference the Low Risk Handbook for Erosion Prevention and Sediment Control, available from the Vermont Department of Environmental Conservation, and specifically cites Section 3.3.3 on page 25 for seeding details. The response indicates that a standard Conservation mix seed mixture should be used, noting it represents a minor cost fraction compared to alternative seed mixtures previously specified on similar projects. The RFI log appears to be a template with rows 2 through 60 remaining blank, indicating this is the only question submitted during the RFI period as of the log date.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 260423 GMF FR42C Road Recon - RFI log for Q and A.xlsx | XLSX spreadsheet | |
| 02 FR42C Spec Road Reconstruction_Schedule of Items.xlsx | XLSX spreadsheet | |
| 04 FR42C Spec Road Reconstruction Plans_Signed.pdf | ||
| 06 Wage Determination VT20250065 Windsor County.pdf | ||
| 01 Solicitation Terms and Conditions.pdf | ||
| 03 FR42C Spec Road Reconstruction SOW.docx | DOCX document | |
| 05 FR42C Spec Road Reconstruction_FSSS.docx | DOCX document | |
| HOW TO FOLLOW PROJECTS ON SAM FOR EMAIL ALERTS.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| RFI log | As of 4/22/2026 | gov or FS = Forest Service | ||
| Sol No. 12445526Q0052 GMF FR42C Road Recon | ||||
| No. | Inquiry | Answer | Posted Supporting Documents (If Applicable) | |
| 1 | On plans page C-01 # 6 (second one under EROSION CONTROL NOTES:) | |||
| Can you please give a more specific designation for the seed mixture? A regular Conservation mix Is a minor fraction of the cost for what some of the other seed mixtures that have been spec’d in the past. | Contractors need to reference the Low Risk Handbook for Erosion Prevention and Sediment Control for erosion control measures, which is available online from the Vermont Department of Environmental Conservation. Seeding details can be found on page 25 under Section 3.3.3. | |||
| 2 | ||||
| 3 | ||||
| 4 | ||||
| 5 | ||||
| 6 | ||||
| 7 | ||||
| 8 | ||||
| 9 | ||||
| 10 | ||||
| 11 | ||||
| 12 | ||||
| 13 | ||||
| 14 | ||||
| 15 | ||||
| 16 | ||||
| 17 | ||||
| 18 | ||||
| 19 | ||||
| 20 | ||||
| 21 | ||||
| 22 | ||||
| 23 | ||||
| 24 | ||||
| 25 | ||||
| 26 | ||||
| 27 | ||||
| 28 | ||||
| 29 | ||||
| 30 | ||||
| 31 | ||||
| 32 | ||||
| 33 | ||||
| 34 | ||||
| 35 | ||||
| 36 | ||||
| 37 | ||||
| 38 | ||||
| 39 | ||||
| 40 | ||||
| 41 | ||||
| 42 | ||||
| 43 | ||||
| 44 | ||||
| 45 | ||||
| 46 | ||||
| 47 | ||||
| 48 | ||||
| 49 | ||||
| 50 | ||||
| 51 | ||||
| 52 | ||||
| 53 | ||||
| 54 | ||||
| 55 | ||||
| 56 | ||||
| 57 | ||||
| 58 | ||||
| 59 | ||||
| 60 |
File details come from the government source that posted it. Updated .