02 FR42C Spec Road Reconstruction_Schedule of Items.xlsx

XLSX spreadsheet 11 KB Posted

Attached to
GMF FR42C Road Reconstruction
Solicitation number
12445526Q0052
Issued by

About this file

This is a Schedule of Items document that outlines the pay items, quantities, and pricing structure for the Falls Brook Timber Sale road reconstruction project on the Green Mountain National Forest, Rochester Ranger District. The project involves reconstruction of Forest Road 42C and includes 19 distinct pay line items covering mobilization, surveying, erosion control, clearing and grubbing, excavation, riprap placement, aggregate surfacing, ditch reconditioning, culvert installation and cleaning, seeding, mulching, and temporary traffic control. Work quantities are estimated in good faith and include lump sum items (mobilization, surveying, erosion control, clearing and grubbing, seeding, mulching, and traffic control) and measured quantity items such as 10 cubic yards of roadway excavation, 60 cubic yards of rock excavation, 114 square yards of geotextile separation, various riprap classes totaling 217 cubic yards, 200 cubic yards of aggregate surface course, 130 cubic yards of pit run material, 100 linear feet of ditch reconditioning, 30 linear feet of 18-inch pipe culvert, and one culvert cleaning operation.

The document includes a critical note stating that contractors bear responsibility for confirming all quantities prior to quote submission, and that a firm fixed price award will not allow for quantity adjustments after award due to contractor failure to verify quantities. This Schedule of Items is associated with RFQ 12445526Q0052 issued by the Department of Agriculture Forest Service for a small business set-aside acquisition under NAICS code 237310, with a small business size standard of $45 million. Contractors must submit unit prices for each line item to develop total project pricing.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Table 1

PART 1 - SCHEDULE OF ITEMS

SECTION B - SERVICES AND PRICES

FALLS BROOK TIMBER SALE - FR42C SPECIFIED ROAD RECONSTRUCTION

GREEN MOUNTAIN NATIONAL FOREST | ROCHESTER RANGER DISTRICT

B-1 SCHEDULE OF ITEMS
PAY ITEMITEM DESCRIPTIONPAY
UNITEST.
QTY.UNIT PRICETOTAL

PRICE

15101MOBILIZATIONLUMP SUM1
15280CONSTRUCTION SURVEY AND STAKING,
METHOD II, TOLERANCE BLUMP SUM1
15701SOIL EROSION CONTROLLUMP SUM1
20102CLEARING AND GRUBBINGLUMP SUM1
20401ROADWAY EXCAVATIONCUBIC YARD10
20421ROCK EXCAVATIONCUBIC YARD60
20701SEPARATION GEOTEXTILE, NON-WOVENSQUARE YARD114
25101-01PLACED RIPRAP, CLASS 1CUBIC YARD12
25101-04PLACED RIPRAP, CLASS 4CUBIC YARD5
25101-07PLACED RIPRAP, CLASS 7CUBIC YARD200
30183AGGREGATE SURFACE COURSE, GRADING B, COMPACTION METHOD BCUBIC YARD70
30280PIT RUN MAXIMUM SIZE 3",
COMPACTION METHOD BCUBIC YARD130
30302DITCH RECONDITIONINGLINEAR FEET100
6020118-INCH PIPE CULVERTLINEAR FEET30
60704CLEANING CULVERT IN PLACEEACH1
62510SEEDING, DRY METHODLUMP SUM1
62515MULCHING, DRY METHODLUMP SUM1
63501TEMPORARY TRAFFIC CONTROLLUMP SUM1
NOTE: THESE QUANTITIES ARE ESTIMATED IN GOOD FAITH HOWEVER IT IS THE CONTRACTOR'S RESPONSIBILITY TO CONFIRM QUANTITIES PRIOR TO SUBMITTING A QUOTE. A FIRM FIXED PRICE AWARD DOES NOT ALLOW FOR QUANTITY ADJUSTMENTS AFTER AWARD DUE TO FAILURE BY THE CONTRACTOR TO CONFIRM QUANTITIESTOTAL