This Statement of Work (SOW) details a refrigeration system replacement project for the Chequamegon-Nicolet National Forest's Washburn District Office located in Washburn, Wisconsin. The project involves three primary components: demolition of the existing refrigeration system, installation of a new refrigeration system, and associated electrical work. The new system must maintain a constant 33-degree Fahrenheit temperature for storing up to 400,000 tree seedlings, with specific requirements including a split system condenser and evaporator, 208-230V power supply, and a condensing unit placed on a 4" concrete pad outside the walk-in cooler.
Key technical specifications include: a 20' x 27' x 9' walk-in cooler with concrete floor and 2"x6" wall construction, no dehumidification requirements, and mandatory compliance with the Buy America Act. Additional requirements encompass providing a thermostat, condensate drain, "snow legs" for elevation, maximum manufacturer warranty, electric defrost capability, electronically commutated fan motors, automatic restart after power loss, and external disconnect. The contractor must submit detailed load calculations, equipment specifications, and performance characteristics for approval prior to purchasing and installing any equipment.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 12445525Q0084 Amendment 0001 250904.pdf | ||
| Att. 3 Schedule of Items 250827.docx | DOCX document | |
| Att. 2 Wage Determination WI20250011 2500808.pdf | ||
| RFQ 12445525Q0084 250825.pdf | ||
| Att .1 Statement of Work 250807.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work
Project: Tree Cooler Washburn
Location: 113 East Bayfield St. Washburn, WI 54891
Summary: The work consists of providing all the materials, equipment, labor, supervision, transportation, and supplies necessary to replace the refrigeration system for a walk-in tree cooler at the Washburn District Office of the Chequamegon-Nicolet National Forest.
The project consists of three components demolition of existing refrigeration system and related components, provide new refrigeration system, provide electrical components
Provide submittals where required below. Submittals must be approved before equipment and materials are purchased and installed.
1. Base Bid Demolition: Demolish the entire existing refrigeration system including but not limited to all associated appurtenances, electrical components, and overhead cover of external unit. Seal all penetrations that are not reused.
2. Base Bid New Refrigeration System: Provide new condenser and evaporator as a split system, and all necessary equipment for a functional system. Size and design a system by completing a load calculation and other considerations that will maintain an internal temperature of 33 degrees Fahrenheit throughout the year.
a. Relevant information:
i. The cooler is used to hold up to 400,000 tree seedlings. Seedlings are brought into the cooler at approximately 38 degrees.
ii. Maintain a space temperature of 33 degrees Fahrenheit throughout the year.
iii. Power supply is 208-230/1 PH/60 Hz
iv. Dehumidification and humidification of space is not required.
v. Walk-in cooler is 20’ x 27’ x 9’. No windows. Concrete floor. Assume walls are 2”x6” construction with batt insulation.
b. Other Requirements
i. Locate condensing unit on 4” concrete pad directly outside of the walk-in cooler in a location close to the existing condensing unit.
ii. Provide thermostat.
iii. Provide condensate drain.
iv. Provide “snow legs” or other system to elevate the condensing unit to accommodate snow conditions.
v. Provide maximum extended warranty offered by manufacturer.
vi. Equipment must comply with the Buy America Act
vii. Provide electric defrost
viii. System shall function in low ambient temperatures
ix. Provide external disconnect
x. Mount evaporator coil to ceiling or wall
xi. Evaporator and condenser fan motors shall be electronically commutated motors.
xii. Comply with Department of Energy energy efficiency requirements
xiii. Automatic restart after loss of power
xiv. Provide rectangular synthetic or concrete pad for outdoor condensing unit
xv. Seal exterior penetrations.
c. Required Submittals for approval:
i. Load calculations and recommended size of refrigeration equipment
ii. Condenser and evaporator specifications and performance characteristics
iii. Thermostat
3. Base Bid Electrical components: Provide all necessary conductors and conduit.
Provide new breaker in electrical panel. Provide new external disconnect at refrigeration unit. All work shall be in compliance with the National Electrical Code.
a. Required submittals for approval:
i. Breaker
ii. External disconnect