This document outlines a federal contract opportunity for HVAC replacement services on the Green Mountain National Forest in Vermont. The USDA Forest Service is soliciting to replace HVAC systems under NAICS code 238220, with a small business size standard of $19M. All questions regarding solicitation number 12445524Q0014 must be submitted by March 7, 2024. The opportunity is for HVAC replacement on the Green Mountain National Forest located in the state of Vermont. The solicitation will use NAICS code 238220 for plumbing, heating, and air conditioning contractors, with a small business size standard of $19M.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

davidpdonahue Polygon davidpdonahue Callout

· REMOVE & DISPOSE A/C UNITS & CONCRETE PAD.

· DISCONNECT ELECTRICAL AND PLUMBING LINES. REMOV LINES TO WITHIN 2' OF BUILDING. CUT AND CAP BELOW GRADE.

· FILL WITH TOPSOIL TO ADJACENT GRADES, SEED, AND MULCH.

davidpdonahue Polygon davidpdonahue Callout

PROPOSED CONCRETE PAD, 10'-0" X 10'-0"

davidpdonahue Text Box WORK SPECIFIED IN RED TEXT. EXISTING PLANS ARE USED FOR INFORMATION ONLY. CONTRACTOR SHALL IS RESPONSIBLE TO VERIFY EXISTING CONDITIONS AND CONFIGURATION PRIOR TO STARTING WORK.

Rectangle davidpdonahue Callout

PROPOSED CONCRETE PAD

davidpdonahue Rectangle davidpdonahue Rectangle davidpdonahue Typewritten Text 10'-0" davidpdonahue Typewritten Text 6" davidpdonahue Polygon davidpdonahue Rectangle davidpdonahue Typewritten Text davidpdonahue Callout

OPTIONAL BID ITEM

· REMOVE AND DISPOSE EXISTING HOT WATER HEATER.

· REMOVE PENETRATIONS THROUGH CEILING AND ROOF

· PATCH/PAINT CEILING TO MATCH EXISTING

· PATCH/SEAL/SHINGLE ROOF TO MATCH EXISTING

Callout MODIFY PLUMBING IN MECHANICAL ROOM AS NEEDED TO SUPPORT PROPOSED FURNACE AND HEAT PUMP INSTALLATIONS.

davidpdonahue Polygon davidpdonahue Callout

OPTIONAL BID ITEM

· REMOVE AND DISPOSE EXISTING HOT WATER HEATER.

· INSTALL NEW HEAT PUMP HOT WATER TANK.

· MODIFY ELECTRICAL AND PLUMBING TO SUPPORT WATER HEATER REPLACEMENT.

· REMOVE AND/OR CAP UNUSED PROPANE LINES.

OPTIONAL BID ITEM. REPLACE HOT WATER HEATER. SEE SPECIFICATIONS FOR PROPOSED WATER HEATER davidpdonahue Callout

· REMOVE AND DISPOSE EXISTING PROPANE FURNACES

· INSTALL NEW PROPANE FURNACES

· MODIFY HVAC DUCTS AS NEEDED TO SUPPORT PROPOSED FURNACE AND HEAT PUMP INSTALLATIONS.

davidpdonahue Polygon davidpdonahue Polygon davidpdonahue Polygon davidpdonahue Callout

REPLACE THERMOSTAT

davidpdonahue Callout

REPLACE THERMOSTAT

davidpdonahue Callout

REPLACE THERMOSTAT

davidpdonahue Callout

REPLACE THERMOSTAT

davidpdonahue Rectangle davidpdonahue

PROPOSED CONCRETE PAD. RUN NEW REFRIGERANT PIPING FOR HEAT PUMPS TO MECHANCIAL ROOM THROUGH THE ATTIC. REMOVE ALL EXISTING REFRIGERANT PIPING WITHIN BUILDING. PENETRATIONS THROUGH EXTERIOR WALL SHALL BE INSULATED AND SEALED WITH EXTERIOR RATED CAULKING/SILICONE. ALL REFRIGERANT LINES SHALL BE INSULATED. EXTERIOR LINES SHALL BE COVERED FOR UV PROTECTION. SEE SPECIFICATIONS FOR DETAILS.

davidpdonahue

OPTIONAL BID ITEM. REPLACE FOUR (4) EXHAUST FANS. MODIFY DUCTS AS NEEDED TO SUPPORT REPLACEMENTS.

davidpdonahue Callout OPTIONAL BID ITEM. REPLACE FOUR (4) EXHAUST FANS. ENSURE PROPOSED FANS OPERATE AS SPECIFED. REPLACE CONTROLS AS NEEDED. EF-2 & EF-3 SHALL TO BE 150 CFM AND EF-4 & EF-5 SHALL TO BE 200 CFM.

davidpdonahue Polygon davidpdonahue

REPLACE WITH PROPOSED PROPANE FURNACES & HEAT PUMPS. SEE SPECIFICATIONS FOR PROPOSED REPLACEMENTS. EQUIPMENT COOLING AND HEATING LOADING SHALL BE SIZED TO MATCH EXISTING EQUIPMENT.

davidpdonahue

· REMOVE & DISPOSE A/C UNITS

MODIFY ELECTRICAL IN MECHANICAL ROOM AS NEEDED TO SUPPORT PROPOSED FURNACE AND HEAT PUMP INSTALLATIONS.

davidpdonahue Rectangle davidpdonahue

PROPOSED CONCRETE PAD. RUN NEW ELECTRICAL LINES FOR HEAT PUMPS TO MECHANCIAL ROOM THROUGH THE ATTIC. PENETRATIONS THROUGH EXTERIOR WALL SHALL BE INSULATED AND SEALED WITH EXTERIOR RATED CAULKING/SILICONE. SEE SPECIFICATIONS FOR DETAILS.

davidpdonahue

OPTIONAL BID ITEM. REPLACE FOUR (4) EXHAUST FANS. MODIFY ELECTRICAL AS NEEDED TO SUPPORT REPLACEMENTS.

Landscaping Drawings
L401_Enlarged Landscape Plan_Final Submission
L501_Site Details_Final Submission
First Floor Plan
Plumbing Plans
P001_Plumbing Legends Notes & Details_Final Submission
P101_Plumbing Floor Plan_Final Submission
P102_Plumbing Attic Plan_Final Submission
P601_Plumbing DWV Riser Diagram_Final Submission
P602_Plumbing Schedules_Final Submission
Mechanical Drawings
M001_Mechanical Legend-General Notes_Final Submission
M101_Mechanical Floor Plan_Final Submission
M102_Mechanical Attic Floor Plan_Final Submission
M501_Mechanical Details_Final Submission
M601_Mechanical Schedule_Final Submission
Electrical Plans
E101_Electrical Site Plan_Final Submission
E102_Power-Signal Floor Plan_Final Submission
E103_Lighting Floor Plan_Final Submission
E104_Electrical Attic Plan_Final Submission
E105_Electrical Details_Final Submission
E601_Electrical Schedules & Legends_Final Submission