Questions and Answers as of 8-9-23.pdf

PDF 101 KB Posted

Attached to
Midewin Culvert Replacement
Solicitation number
12445523Q0104
Issued by

About this file

This document contains questions and answers regarding solicitation number 12445523Q0104 for the Midewin Culvert Replacement project. The Forest Service is seeking to replace an existing culvert and conduct related roadwork at Midewin National Tallgrass Prairie. The questions and answers provide specifications for tasks such as removing the existing culvert, cleaning the pipe and channel, and furnishing gravel materials for over 1000 feet of affected road areas at multiple sections as needed. Contractors will have access to the project site from both River Road and Highway 53 entrances.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Midewin Culvert Replacement Solicita on No.: 12445523Q0104

Midewin Na onal Tallgrass Prairie

Ques ons and Answers as of 8/9/2023

Ques on

Answers

General:

A: Is there more than one access port for the project?

Yes, there are two entrances, one from River Road and one from Highway 53

Task 1: Replace the sewer A: Where is Riprap place needed?

On each side of the pipe upstream, downstream and channel.

Task 2: Remove Culvert A: How long does the pipe need to be removed?

Minimum three feet from the opening of the current point (exis ng opining on the pipe)if it is too long. It should be removed to indicate where the road should be safe.

Task 3:

A: Does the pipe and channel need to be cleaned?

B: What if there is a previous hole in the tube a er cleaning?

Cleaning needed for pipe just to open them up.

This will be Midewin NTP responsibility

Task 4:

A: Does the gravel material furnish of in one layer for 1000 feet length?

No. Gravel materials need to be furnished on more than one layer, if necessary, especially for the affected road areas, also the gravel materials should be placed on different sec ons of the road as needed, put all material will be on West Patrol road only.

File details come from the government source that posted it. Updated .