C05 0002 FY26PSGSouthDitchReliefCulvert- SOI rev2.xlsx

XLSX spreadsheet 50 KB Posted

Attached to
Pisgah South Culvert Rehab
Solicitation number
12445226Q0046
Issued by

About this file

This is a Schedule of Items (SOI) pricing template for the FY26 Pisgah South Ranger District Ditch Relief Culverts project. The document outlines all line items and quantities requiring unit price quotations for a ditch culvert replacement and road rehabilitation project within the Pisgah National Forest in North Carolina (Buncombe, Haywood, Henderson, and Transylvania Counties). The project encompasses removal of 214 ditch relief culverts and replacement with 7,414 linear feet of 24-inch corrugated metal pipe culverts, plus associated road reconditioning work to Forest Service standards.

Key work items include mobilization and equipment inspection (lump sum), silt fence installation and removal (5,350 linear feet), wattles installation (2,568 linear feet), roadside brushing and mowing (41.662 miles), roadway excavation and embankment (6,590.22 cubic yards), riprap placement (1,070 tons), aggregate surface course (6,420 tons), roadway rehabilitation (74.94 miles), asphalt concrete patching (65.93 cubic yards), culvert pipe installation with catch basins and outlet controls (7,414 linear feet), headwall construction (17 each), drop inlet construction (16 each), turf establishment (21.4 acres), temporary traffic control (lump sum), and GIS data collection mapping (lump sum). The SOI includes Economic Price Adjustment (EPA) provisions for fuel costs at three tier levels ($6.01-$8.00, $8.01-$10.00, and >$10.00 per gallon) applied at 25%, 50%, and 75% project milestones. Contractors must provide unit prices for all line items; the total cost calculation will determine the maximum potential obligation for this small business set-aside solicitation (solicitation number 12445226Q0046, with submission deadline September 14, 2026 at 5:00 PM ET).

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOI_26DRCPSGSOUTH

SCHEDULE OF ITEMS
PISGAH RANGER DISTRICT - 2026 DITCH RELIEF CULVERTS SOUTH
NATIONAL FORESTS IN NORTH CAROLINA - PISGAH NATIONAL FOREST
BUNCOMBE, HAYWOOD, HENDERSON, AND TRANSYLVANIA COUNTIES
Item #DescriptionPay UnitMethod of MeasureQtyUnit PriceTotal
15101Mobilization, includes pre-wash and equipment inspectionLump SumCQ1$_____________$____________________
15702Silt fence Installation, Removal and Disposal off Government Land after all other contract items are completedFootAQ5350$_____________$____________________
15707Wattles, 6" Diameter Min.FootAQ2568$_____________$____________________
20203Roadside Brushing and Mowing, disposal method <f>MileCQ41.662$_____________$____________________
20403Roadway excavation and embankment, compaction placement method (1)Cubic YardCQ6590.22$_____________$____________________
25102Placed riprap, NCDOT Class BTonAQ1070$_____________$____________________
30208Aggregate surface course, NCDOT ABC, Method 2, Compaction BTonAQ6420$_____________$____________________
30315Roadway Rehabilitation (perform 2 services per mile), Placement Method 2MileCQ74.94$_____________$____________________
40305Asphalt Concrete Patching (Localized Repair)CYCQ65.93$_____________$____________________
60201aReplace with 24" inch pipe culvert, Aluminized corrugated steel, Type 2, 14-Gauge, with standard Catch Basin, Ditchline, and Outlet Controls, Compaction Method 2. Disposal off Government LandFootAQ7414$_____________$____________________
60201bHeadwall Construction associated with Specific Culverts (remove/replace)EachAQ17$_____________$____________________
60201cDrop Inlet Construction associated with Specific Culverts (remove/replace)EachAQ16$_____________$____________________
62502Turf establishmentAcreCQ21.4$_____________$____________________
63501Temporary traffic controlLump SumCQ1$_____________$____________________
90101Drainage Culvert Assest Status and Location Data Collection GIS Digital MapLump SumCQ1$_____________$____________________
Total Cost$ - 0
% Work CopletedSupplemental: Fuel Price Variance Allowance (only 1 option potentially awarded per milestone)
25% Milestone: Tier 1Economic Price Adjustment (EPA) for Fuel - Option 1: $6.01 - $8.00Lump SumCQ1$_____________
25% Milestone: Tier 2Economic Price Adjustment (EPA) for Fuel - Option 2: $8.01 - $10.00Lump SumCQ1$_____________
25% Milestone: Tier 3Economic Price Adjustment (EPA) for Fuel - Option 3: > $10.00Lump SumCQ1$_____________
25% MilestoneMaximum potential obligationLump SumCQ1$_____________$____________________
50% Milestone: Tier 1Economic Price Adjustment (EPA) for Fuel - Option 4: $6.01 - $8.00Lump SumCQ1$_____________
50% Milestone: Tier 2Economic Price Adjustment (EPA) for Fuel - Option 5: $8.01 - $10.00Lump SumCQ1$_____________
50% Milestone: Tier 3Economic Price Adjustment (EPA) for Fuel - Option 6: > $10.00Lump SumCQ1$_____________
50% MilestoneMaximum potential obligationLump SumCQ1$_____________$____________________
75% Milestone: Tier 1Economic Price Adjustment (EPA) for Fuel - Option 7: $6.01 - $8.00Lump SumCQ1$_____________
75% Milestone: Tier 2Economic Price Adjustment (EPA) for Fuel - Option 8: $8.01 - $10.00Lump SumCQ1$_____________
75% Milestone: Tier 3Economic Price Adjustment (EPA) for Fuel - Option 9: > $10.00Lump SumCQ1$_____________
75% MilestoneMaximum potential obligationLump SumCQ1$_____________$____________________
Total Maximum Cost (Base plus Options)$____________________