C05 0002 FY26PSGSouthDitchReliefCulvert- SOI rev2.xlsx
XLSX spreadsheet 50 KB Posted
- Attached to
- Pisgah South Culvert Rehab
- Solicitation number
- 12445226Q0046
- Issued by
-
Department of Agriculture Forest Service
About this file
This is a Schedule of Items (SOI) pricing template for the FY26 Pisgah South Ranger District Ditch Relief Culverts project. The document outlines all line items and quantities requiring unit price quotations for a ditch culvert replacement and road rehabilitation project within the Pisgah National Forest in North Carolina (Buncombe, Haywood, Henderson, and Transylvania Counties). The project encompasses removal of 214 ditch relief culverts and replacement with 7,414 linear feet of 24-inch corrugated metal pipe culverts, plus associated road reconditioning work to Forest Service standards.
Key work items include mobilization and equipment inspection (lump sum), silt fence installation and removal (5,350 linear feet), wattles installation (2,568 linear feet), roadside brushing and mowing (41.662 miles), roadway excavation and embankment (6,590.22 cubic yards), riprap placement (1,070 tons), aggregate surface course (6,420 tons), roadway rehabilitation (74.94 miles), asphalt concrete patching (65.93 cubic yards), culvert pipe installation with catch basins and outlet controls (7,414 linear feet), headwall construction (17 each), drop inlet construction (16 each), turf establishment (21.4 acres), temporary traffic control (lump sum), and GIS data collection mapping (lump sum). The SOI includes Economic Price Adjustment (EPA) provisions for fuel costs at three tier levels ($6.01-$8.00, $8.01-$10.00, and >$10.00 per gallon) applied at 25%, 50%, and 75% project milestones. Contractors must provide unit prices for all line items; the total cost calculation will determine the maximum potential obligation for this small business set-aside solicitation (solicitation number 12445226Q0046, with submission deadline September 14, 2026 at 5:00 PM ET).
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOI_26DRCPSGSOUTH
| SCHEDULE OF ITEMS |
| PISGAH RANGER DISTRICT - 2026 DITCH RELIEF CULVERTS SOUTH |
| NATIONAL FORESTS IN NORTH CAROLINA - PISGAH NATIONAL FOREST |
| BUNCOMBE, HAYWOOD, HENDERSON, AND TRANSYLVANIA COUNTIES | ||||||
| Item # | Description | Pay Unit | Method of Measure | Qty | Unit Price | Total |
| 15101 | Mobilization, includes pre-wash and equipment inspection | Lump Sum | CQ | 1 | $_____________ | $____________________ |
| 15702 | Silt fence Installation, Removal and Disposal off Government Land after all other contract items are completed | Foot | AQ | 5350 | $_____________ | $____________________ |
| 15707 | Wattles, 6" Diameter Min. | Foot | AQ | 2568 | $_____________ | $____________________ |
| 20203 | Roadside Brushing and Mowing, disposal method <f> | Mile | CQ | 41.662 | $_____________ | $____________________ |
| 20403 | Roadway excavation and embankment, compaction placement method (1) | Cubic Yard | CQ | 6590.22 | $_____________ | $____________________ |
| 25102 | Placed riprap, NCDOT Class B | Ton | AQ | 1070 | $_____________ | $____________________ |
| 30208 | Aggregate surface course, NCDOT ABC, Method 2, Compaction B | Ton | AQ | 6420 | $_____________ | $____________________ |
| 30315 | Roadway Rehabilitation (perform 2 services per mile), Placement Method 2 | Mile | CQ | 74.94 | $_____________ | $____________________ |
| 40305 | Asphalt Concrete Patching (Localized Repair) | CY | CQ | 65.93 | $_____________ | $____________________ |
| 60201a | Replace with 24" inch pipe culvert, Aluminized corrugated steel, Type 2, 14-Gauge, with standard Catch Basin, Ditchline, and Outlet Controls, Compaction Method 2. Disposal off Government Land | Foot | AQ | 7414 | $_____________ | $____________________ |
| 60201b | Headwall Construction associated with Specific Culverts (remove/replace) | Each | AQ | 17 | $_____________ | $____________________ |
| 60201c | Drop Inlet Construction associated with Specific Culverts (remove/replace) | Each | AQ | 16 | $_____________ | $____________________ |
| 62502 | Turf establishment | Acre | CQ | 21.4 | $_____________ | $____________________ |
| 63501 | Temporary traffic control | Lump Sum | CQ | 1 | $_____________ | $____________________ |
| 90101 | Drainage Culvert Assest Status and Location Data Collection GIS Digital Map | Lump Sum | CQ | 1 | $_____________ | $____________________ |
| Total Cost | $ - 0 | |||||
| % Work Copleted | Supplemental: Fuel Price Variance Allowance (only 1 option potentially awarded per milestone) | |||||
| 25% Milestone: Tier 1 | Economic Price Adjustment (EPA) for Fuel - Option 1: $6.01 - $8.00 | Lump Sum | CQ | 1 | $_____________ | |
| 25% Milestone: Tier 2 | Economic Price Adjustment (EPA) for Fuel - Option 2: $8.01 - $10.00 | Lump Sum | CQ | 1 | $_____________ | |
| 25% Milestone: Tier 3 | Economic Price Adjustment (EPA) for Fuel - Option 3: > $10.00 | Lump Sum | CQ | 1 | $_____________ | |
| 25% Milestone | Maximum potential obligation | Lump Sum | CQ | 1 | $_____________ | $____________________ |
| 50% Milestone: Tier 1 | Economic Price Adjustment (EPA) for Fuel - Option 4: $6.01 - $8.00 | Lump Sum | CQ | 1 | $_____________ | |
| 50% Milestone: Tier 2 | Economic Price Adjustment (EPA) for Fuel - Option 5: $8.01 - $10.00 | Lump Sum | CQ | 1 | $_____________ | |
| 50% Milestone: Tier 3 | Economic Price Adjustment (EPA) for Fuel - Option 6: > $10.00 | Lump Sum | CQ | 1 | $_____________ | |
| 50% Milestone | Maximum potential obligation | Lump Sum | CQ | 1 | $_____________ | $____________________ |
| 75% Milestone: Tier 1 | Economic Price Adjustment (EPA) for Fuel - Option 7: $6.01 - $8.00 | Lump Sum | CQ | 1 | $_____________ | |
| 75% Milestone: Tier 2 | Economic Price Adjustment (EPA) for Fuel - Option 8: $8.01 - $10.00 | Lump Sum | CQ | 1 | $_____________ | |
| 75% Milestone: Tier 3 | Economic Price Adjustment (EPA) for Fuel - Option 9: > $10.00 | Lump Sum | CQ | 1 | $_____________ | |
| 75% Milestone | Maximum potential obligation | Lump Sum | CQ | 1 | $_____________ | $____________________ |
| Total Maximum Cost (Base plus Options) | $____________________ |