QA Document.docx

DOCX document 15 KB Posted

Attached to
Florida National Forest Road Construction and Maintenance SATOC
Solicitation number
12445223R0001
Issued by

View the file

Other files

File Type Posted
NFF RM IDIQ SOW v4 Final (3).pdf PDF
02 OSC SOI v2.xlsx XLSX spreadsheet
NFF RM IDIQ SOW v4 Final (3).pdf PDF
QA Document.docx DOCX document
02 APA SOI v2.xlsx XLSX spreadsheet
02 OCA SOI v2.xlsx XLSX spreadsheet
12445223R0001_002.pdf PDF
SOW Final.pdf PDF
12445223R0001_001.pdf PDF
12445223R0001_SF30.pdf PDF
Attachment B Performance Report.docx DOCX document
Attachment A Experience Form.docx DOCX document
QA Document.docx DOCX document
12445223R0001.pdf PDF
02 OCA SOI.xlsx XLSX spreadsheet
12445223R0001.pdf PDF
WDOL_WD_Baker.pdf PDF
WDOL_WD_Lake.pdf PDF
WDOL_WD_Leon.pdf PDF
WDOL_WD_Franklin.pdf PDF
WDOL_WD_Liberty.pdf PDF
WDOL_WD_Putnam.pdf PDF
WDOL_WD_Marion.pdf PDF
WDOL_WD_Columbia.pdf PDF
02 OSC SOI.xlsx XLSX spreadsheet
02 APA SOI.xlsx XLSX spreadsheet
NFF RM IDIQ SOW v4 Final.docx DOCX document
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. The Solicitation states the following: “6. You can submit a proposal for each forest or all of the Forest. A separate proposal must be submitted for each individual Forest and each proposal must be clearly identified with the Forest name.” This only pertains to the schedule of items, correct? Therefore, the Offeror would only need to submit one technical proposal for the entire SATOC, but price all of interest?

Answer: No a proposal for each forest, that is clearly marked.

2. The Solicitation states the following requirement regarding questions, “Email all questions to Brad Higley by 1400 local time by February 27, 2023 @ bradley.higley@usda.gov”. This date is post the bid due date. Please confirm that questions are due January 27, 2023 by 1400 local time.

Answer: It is January 27, 2023 at 1400 Local.

3. The Solicitation states the following, “(a) The Government is planning a pre-bid/pre-proposal conference, during which potential offerors may obtain a better understanding of the work required.” But, I do not see a date listed for a pre-bid site visit. Can you provide the date proposed if there is one?

Pre-Bid will be on Thursday, January 26th at 1100 am – 100 eastern at 24874 US90, Sanderson, FL 32087

4. On each of the Excel Schedule of Items sheets provided to price, does the Offeror need to provide pricing for each tab (to include single road, multi road, 6T) on the entire excel sheet, or only on the schedule of items tab on each excel sheet? Please advise.

Answer: Fill in all of the areas that ask for pricing.

5. The Solicitation states the following, “Experience Project Data Sheet (Attachment A) is MANDATORY and SHALL be used to submit project information.” Attachment A is not included in the solicitation documents, can you please provide?

Answer: See the attachments.

6. The Solicitation states the following, “Submit a Past Performance Questionnaires (PPQ) (RFP Attachment B) for each project included in Factor 2 for Experience.” Attachment B is not included in the solicitation documents, can you please provide?

Answer: See the attachments.

7. The Solicitation does not list instructions for bid submission. Are proposals to be emailed to Bradley.higley@usda.gov by 1700 LT on 2/10/2023, or physically mailed by that time and date to the following location:

USDA-FS CSA EAST 12

1720 PEACHTREE ST NW

STE 876S

ATLANTA GA 30309-2449

See block 8 of the 1442.