This is a federal construction contract solicitation for parking lot pavement restoration services at the USDA Forest Service Northern Research Station in Morgantown, West Virginia.

The solicitation (Number 12445127B0005) is an Invitation for Bid (IFB) for a firm-fixed-price contract with a Total Small Business Set-Aside under FAR 19.5. The project involves crack sealing, seal coating, and line painting of parking lots at 180 Canfield Street, Morgantown, WV, with an estimated magnitude between $25,000 and $100,000. The scope includes providing all labor, materials, tools, equipment, permits, testing, and reports. Work must be performed during evening hours only, with sealcoating and line painting restricted to Friday, Saturday, or Sunday. The performance period is 65 calendar days after Notice to Proceed, with work to be completed by April 6, 2027. Bids are due January 6, 2027, at 1000 EST, submitted electronically to cynthia.granderson@usda.gov. A mandatory pre-bid meeting is scheduled for December 9, 2026, at 1000 EST, with the final question deadline of December 18, 2026. Bidders must submit a Bid Bond (Standard Form 24), signed SF1442, and completed Schedule B with pricing for all five line items: Crack Seal (2,000 LF), Sealcoat (46,000 SQFT), Line Striping (5,440 LF), ADA Striping (6 LF), and Mobilization (1 LS). The contract requires performance and payment bonds. Award will be made to the lowest responsive and responsible bidder. The NAICS code is 237310 (Highway, Street, and Bridge Construction), and prevailing wage rates from Wage Determination WV20260112 apply, with rates ranging from $22.12 to $40.35 per hour depending on classification.

View the file

Other files

File Type Posted
SF24.pdf PDF
A04_SOW_12445127B0005.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION, OFFER,

AND AWARD

2. TYPE OF SOLICITATION

6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.

PAGE OF PAGES

7. ISSUED BY CODE 8. ADDRESS OFFER TO

SOLICITATION

(Construction, Alteration, or Repair)

1. SOLICITATION NO. 3. DATE ISSUED

IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.

9.

INFORMATION CALL

a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."

FOR

SEALED BID (IFB)

NEGOTIATED (RFP)

1175266

USDA-FS CSA EAST 11

1720 PEACHTREE ST NW

STE 876S

ATLANTA GA 30309-2449

cynthia.granderson@usda.gov

Email Subject Line: 12445127B0005_CO Name_BID

Call 601-965-1619 or email to confirm receipt

CYNTHIA GRANDERSON 601-965-1619

x

11/20/2026

12445127B0005

INVITATION FOR BID

REQUEST FOR PROPOSAL

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)

This is an Invitation For Bid (IFB) will result in award of a firm-fixed price Contract Award will be made using a Lowest Price responsive/responsible evaluation.

The contractor SHALL BID ALL LINES.

Award Methodology: The government intends to award One (1) Contract based upon overall low bid. All work to be performed under the awarded contract will be in accordance with the contract terms/conditions and the requirements, including specifications and drawings provided for this project(s):

Project Title: MORGANTOWN PAVEMENT RESTORATION

Original Set Aside: Total Small Business Set-Aside (FAR 19.5)

NAICS: 237310 Highway, Street, and Bridge Construction $45.0

PSC: Z2LB Repair Or Alteration of Highways/Roads/Streets/Bridges/Railways

Continued ...

11. The Contractor shall begin performance within

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)

13. ADDITIONAL SOLICITATION REQUIREMENTS:

a. Sealed offers in original and is not required.is, b. An offer guarantee

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

d. Offers providing less than

12b. CALENDAR DAYSYES NO

(If "YES", indicate within how many calendar days after award in Item 12b.)

10 65 calendar days and complete it within ________________ ________________ calendar days after receiving

01/06/2027

NSN 7540-01-155-3212

x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________

STANDARD FORM 1442 (Rev. 12/2022)

Prescribed by GSA

FAR(48 CFR) 53.236-1(d) cgranderson Highlight cgranderson Highlight cgranderson Highlight cgranderson Highlight

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)

16. REMITTANCE ADDRESS (Include only if different than item 14.)

CODE FACILITY CODE

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGEMENT OF AMENDMENTS

OFFER (Must be fully completed by offeror)

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO THE UNITED STATES CODE AT

26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this document solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE

BY

2PAGE OF

USDA-FS CSA EAST 11

1720 PEACHTREE ST NW

STE 876S

ATLANTA GA 30309-2449

CYNTHIA B. GRANDERSON

28. NEGOTIATED AGREEMENT 29. AWARD

and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations,certifications, and specifications incorporated by reference in or attached to this contract.

copies to issuing office.) Contractor agrees to furnish

10 U.S.C. 3204(a) 41 U.S.C. 3304(a)

STANDARD FORM 1442 (REV. 12/2022) BACK

Continued...

and return

(Contractor is not required to sign this document.) Your offer on this cgranderson Highlight cgranderson Highlight cgranderson Highlight cgranderson Highlight cgranderson Highlight cgranderson Highlight

ITEM NO.

(A)

SUPPLIES/SERVICES

(B)

QUANTITY

(C)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

NAME OF OFFEROR OR CONTRACTOR

3 3

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

12445127B0005

Magnitude: Between $25,000 and $100,000

Location(s): USDA Northern Research Station Lab and Annex at 180 Canfield Street, Morgantown, WV

Scope of Work Summarized: This project shall generally consist of but not limited to the following: providing all labor, materials, tools, equipment, permits, testing, and reports required to crack seal, seal coat, and line paint parking lots of the USDA Northern Research Station Lab and Annex at the 180 Canfield Street, Morgantown, WV location as defined by the drawings and specifications.

Site Visit: December 9, 2026@ 10:00 am

Last Day for Questions: December 18, 2026, POC:

Patrick Meyer, Patrick.R.Meyer@usda.gov, 304-704-2429. Please RSVP so we don¿t leave you behind

BID Submittal Deadline: January 6, 2027 @ 1000EST. All bids shall be received by 1000EST and emailed to cynthia.grandersooN@usda.gov subject line: 12445127B0005 BID_Co. Name Delivery: 65 Days After Award

Delivery Location Code: 3428

USDA FOREST SERVICE

NORTHERN RESEARCH STATION

180 CANFIELD STREET

MORGANTOWN WV 26505-3101 US

FOB: Destination

Period of Performance: 02/01/2027 to 04/06/2027

Parking lot pavement restoration complete in accordance with the Statement of Work

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

cgranderson Highlight cgranderson Highlight cgranderson Highlight cgranderson Highlight

ITEM

NUMBER DESCRIPTION PAY

UNIT Quantity Unit Cost Amount

0001 Crack Seal LF 2000 0002 Sealcoat SQFT 46000 0003 Line Stripping LF 5440 0004 ADA Striping LF 6 0005 Mobiliazation LS 1

Total

LF - Lineal Foot SQFT - Square Foot Award anticipated to be a firm fixed price contract.

SCHEDULE OF ITEMS

Northern Research Station

PROJECT TITLE: MORGANTOWN PAVEMENT RESTORATION

SCHEDULE OF ITEMS

Period of Performance TBD

Anticipated Delivery Date TBD

MORGANTOWN PAVEMENT RESTORATION

Solicitation Number 12445127B0005

Template Date:2026118 / FAC # 2025-06

Statement of Requirement - This project shall generally consist of but not limited to the following: providing all labor, materials, tools, equipment, permits, testing, and reports required to crack seal, seal coat, and line paint parking lots of the USDA Northern Research Station Lab and Annex at the 180 Canfield Street, Morgantown, WV location as defined by the drawings and specifications.

Schedule of Items - Attachment 0001 - Schedule of Items.

Technical Data - Technical data and supporting documentation associated with this solicitation are available through the following sources:

1. Solicitation Attachments The following documents are included as attachments to this solicitation and can be accessed via the “Attachments/Links” section of the posting.

• Attachment 0002 - Performance Work Statement

• Attachment 0003 – Technical Specifications

• Attachment 0004 – Site Map

• Attachment 0005 – SF24 Bid Bond

• Attachment 0006 – Wage Determination No. WV20260112

Project Location Project Location: 180 Canfield Street, Morgantown, WV

Project locations are listed in:

Attachment 0003 – Technical Specifications.

Definitization of Equitable Adjustments for Change Orders -

Pursuant to FAR 36.101-4(b), information regarding USDA’s definitization of equitable adjustments for change orders under construction contracts may be found at Contracting with USDA under “Federal Acquisition Regulation 36.101-4”. USDA’s procedures that apply to the definitization of equitable adjustments for change orders under construction contracts may be found in AGAR

443.304 -70.

https://www.usda.gov/about-usda/general-information/staff-offices/departmental-administration/office-contracting-and-procurement-ocp/policies-regulations

Federal Acquisition Regulation (FAR) and United States Department of Agriculture Acquisition Regulation (AGAR) Clauses and Provisions The clauses and provisions contained herein are applicable to any order awarded as a result of this solicitation. The terms and conditions set forth herein supersede all other terms and conditions.

Acceptance of the order in accordance with (IAW) FAR 12.201-1(b)(2) constitutes acceptance of all terms and conditions contained herein.

As part of the Revolutionary FAR Overhaul (RFO), system updates may lag policy updates. The System for Award Management (SAM) may continue to require entities to complete representations based on provisions that are not included in this solicitation. Contracting officers will rely on representations from offers based on provisions in the solicitation. Entities are not required to, nor are they able to, update their entity registration to remove these representations in SAM.

52.252-2 Clauses Incorporated by Reference Feb 1998 This solicitation incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also the full text of the clause may be accessed electronically at Internet address https://www.acquisition.gov/far-overhaul/far-part-deviation-guide/far-overhaul-part-52

52.212-4 Terms and Conditions—Commercial Products and Commercial Services (Nov 2025) ☐ Alternate I (Nov 2025) of 52.212-4

This is a commercial construction acquisition. FAR 52.212-4 is amended as follows:

(b) Inspection/Acceptance. Inspection and Acceptance will be conducted in accordance with FAR 52.246-12, Inspection of Construction (Aug 1996).

(d) Changes. Changes will be handled in accordance with the following FAR clause(s):

☒ FAR 52.243-4, Changes (Nov 2025) ☒ FAR 52.243-5, Changes and Changed Conditions (Nov 2025)

(o) Warranty. FAR 52.246-21, Warranty of Construction is applicable to this contract.

52.203-17 Contractor Employee Whistleblower Rights (Nov 2023) 52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (Jan 2017) 52.222-50 Combating Trafficking in Persons (Nov 2025)

☐ Alternate I (Nov 2025) of 52.222-50 52.226-8 Encouraging Contractor Policies to Ban Text Messaging While Driving (May 2024) 52.232-39 Unenforceability of Unauthorized Obligations (Jun 2013) 52.232-40 Providing Accelerated Payments to Small Business Subcontractors (Mar 2023) 52.233-3 Protest After Award (Sep 2025) 52.233-4 Applicable Law for Breach of Contract Claim (Sep 2025) 52.240-91 Security Prohibitions and Exclusions (Nov 2025) https://www.acquisition.gov/far-overhaul/far-part-deviation-guide/far-overhaul-part-52

☐ Alternate I (Nov 2025) of 52.240-91 52.244-6 Subcontracts for Commercial Products and Commercial Services (Nov 2025)

The following clauses are applicable if checked:

☐ 52.203-6 Restrictions on Subcontractor Sales to the Government (Jun 2020) with Alternate I (Nov 2021) of 52.203-6 ☐ 52.203-13 Contractor Code of Business Ethics and Conduct (Nov 2021) ☐ 52.204-9 Personal Identity Verification of Contractor Personnel Jan 2011 ☒ 52.204-13 System for Award Management—Maintenance (Nov 2025) ☐ 52.204-91 Contractor identification (Nov 2025) ☒ 52.209-6 Protecting the Government’s Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment (Sep 2025) ☐ 52.209-9 Updates of Publicly Available Information Regarding Responsibility Matters (Sep 2025) ☒ 52.209-10 Prohibition on Contracting with Inverted Domestic Corporations (Sep 2025) ☐ 52.219-4 Notice of Price Evaluation Preference for HUBZone Small Business Concerns (Nov 2025) ☒ 52.219-6 Notice of Total Small Business Aside (Nov 2025)

☐ Alternate I (Mar 2020).

☐ 52.219-8 Utilization of Small Business Concerns (Nov 2025) ☐ 52.219-9 Small Business Subcontracting Plan (Nov 2025)

☐ Alternate III (Nov 2025) of 52.219-9.

☐ Alternate IV (Nov 2025) of 52.219-9

☐ 52.219-14 Limitations on Subcontracting (Nov 2025) ☐ 52.219-16 Liquidated Damages—Subcontracting Plan (Nov 2025) ☐ 52.219-33 Nonmanufacturer Rule (Nov 2025) ☒ 52.222-3 Convict Labor (June 2003) ☒ 52.222-19 Child Labor—Cooperation with Authorities and Remedies (Nov 2025) ☐ 52.222-35 Equal Opportunity for Veterans (Nov 2025)

☐ Alternate I (Jul 2014) of 52.222-35 ☒ 52.222-36 Equal Opportunity for Workers with Disabilities (Nov 2025)

☐ Alternate I (Jul 2014) of 52.222-36 ☐ 52.222-37 Employment Reports on Veterans (Nov 2025) ☐ 52.222-40 Notification of Employee Rights Under the National Labor Relations Act (Dec 2010) ☒ 52.222-41 Service Contract Labor Standards (Aug 2018) ☒ 52.222-42 Statement of Equivalent Rates for Federal Hires (May 2014)

This Statement is for Information Only:

It is not a Wage Determination

Employee Class Monetary Wage -- Fringe Benefits Aircraft Mechanic $XX.XX

☐ 52.222-43 Fair Labor Standards Act and Service Contract Labor Standards -- Price Adjustment (Multiple Year and Option Contracts) (Aug 2018) ☐ 52.222-44 Fair Labor Standards Act and Service Contract Labor Standards -- Price Adjustment (May 2014) ☐ 52.222-51 Exemption from Application of the Service Contract Labor Standards to Contracts for Maintenance, Calibration, or Repair of Certain Equipment-Requirements (May 2014) ☐ 52.222-53 Exemption from Application of the Service Contract Labor Standards to Contracts for Certain Services-Requirements (Nov 2025) ☐ 52.222-54 Employment Eligibility Verification (Nov 2025) ☒ 52.222-62 Paid Sick Leave Under Executive Order 13706 (Jan 2022) ☒ 52.222-90 Addressing DEI Discrimination by Federal Contractors (Apr 2026) ☒ 52.223-2 Reporting of Biobased Products Under Service and Construction Contracts (Nov 2025) ☐ 52.223-9 Estimate of Percentage of Recovered Material Content for EPA-Designated Items (May 2008)

☐ Alternate I (May 2008) of 52.223-9 ☐ 52.223-11 Ozone-Depleting Substances and High Global Warming Potential Hydrofluorocarbons (Nov 2025) ☐ 52.223-12 Maintenance, Service, Repair, or Disposal of Refrigeration Equipment and Air Conditioners (Nov 2025) ☒ 52.223-23 Sustainable Products and Services (Nov 2025) ☐ 52.224-3 Privacy Training (Jan 2017)

☐ Alternate I (Jan 2017) of 52.224-3 ☒ 52.225-1 Buy American-Supplies (Nov 2025)

☐ Alternate I (Oct 2022) of 52.225-1 ☐ 52.225-3 Buy American--Free Trade Agreements--Israeli Trade Act (Nov 2025)

☐ Alternate II (Nov 2025) of 52.225-3.

☐ Alternate III (Nov 2025) of 52.225-3.

☐ Alternate IV (Oct 2022) of 52.225-3

☐ 52.225-5 Trade Agreements (Nov 2023) ☐ 52.225-19 Contractor Personnel in a Designated Operational Area or Supporting a Diplomatic or Consular Mission outside the United States (May 2020) ☐ 52.225-26 Contractors Performing Private Security Functions Outside the United States (Oct 2016) ☐ 52.226-4 Notice of Disaster or Emergency Area Set-Aside (Nov 2007) ☐ 52.226-5 Restrictions on Subcontracting Outside Disaster or Emergency Area (Aug 2025) ☐ 52.229-12 Tax on Certain Foreign Procurements ☐ 52.232-29 Terms for Financing of Purchases of Commercial Products and Commercial Services (Nov 2021)

☒ 52.232-30 Installment Payments for Commercial Products and Commercial Services (Nov 2021) ☒ 52.232-33 Payment by Electronic Funds Transfer— System for Award Management (Oct 2018) ☐ 52.232-34 Payment by Electronic Funds Transfer—Other Than System for Award Management (Jul 2013) ☐ 52.232-36 Payment by Third Party (Nov 2025) ☐ 52.240-92 Security Requirements (Nov 2025)

☐ Alternate II (Nov 2025) of 52.240-92 ☐ 52.240-93 Basic Safeguarding of Covered Contractor Information Systems (Nov 2025) ☐ 52.242-13 Bankruptcy (July 1995) ☒ 52.246-21 Warranty of Construction (Mar 1994) ☐ 52.247-64 Preference for Privately Owned U.S.-Flag Commercial Vessels (Nov 2025)

☐ Alternate I (Apr 2023) of 52.247-64.

☐ Alternate II (Nov 2021) of 52.247-64

The Contractor shall comply with the following FAR Clauses for Commercial Construction.

52.222-6 Construction Wage Rate Requirements (Nov 2025) 52.222-7 Withholding of Funds (Nov 2025) 52.222-8 Payrolls and Basic Records (Nov 2025) 52.222-9 Apprentices and Trainees (Nov 2025) 52.222-10 Compliance with Copeland Act Requirements (Nov 2025) 52.222-11 Subcontracts (Labor Standards) (Nov 2025) 52.222-12 Contract Termination-Debarment (May 2014) 52.222-13 Compliance with Construction Wage Rate Requirements and Related Regulations.

(May 2014) 52.222-14 Disputes Concerning Labor Standards (Nov 2025) 52.222-15 Certificate of Eligibility (May 2014) 52.236-5 Material and Workmanship (Jul 2025)

The following clauses are applicable when checked:

☐ 52.222-30 Construction Wage Rate Requirements-Price Adjustment (None or Separately Specified Pricing Method (Aug 2018) ☐ 52.222-31 Construction Wage Rate Requirements-Price Adjustment (Percentage Method) (Aug 2018) ☒ 52.222-32 Construction Wage Rate Requirements-Price Adjustment (Actual Method) (Nov 2025) ☒ 52.225-9 Buy American-Construction Materials (Nov 2025) ☐ Alternate I (Oct 2022) of 52.25-9 ☐ 52.225-11 Notice of Buy American Requirement-Construction Materials under Trade Agreements (Nov 2025) ☐ Alternate I (Nov 2025) (of 52.225-11 ☐ Alternate II (Oct 2022) of 52.225-11

☒ 52.228-2 Additional Bond Security (Oct 1997) ☐ 52.228-5 Insurance-Work on Government Installation (Jan 1997) ☐ 52.228-11 Individual Surety-Pledge of Assets (Feb 2021) ☐ 52.228-13 Alternative Payment Protections (Jul 2020) ☒ 52.228-14 Irrevocable Letter of Credit (Nov 2014) ☒ 52.228-15 Performance and Payment Bonds-Construction (Jun 2020) ☒ 52.228-17 Individual Surety-Pledge of Assets (Bid Guarantee) (Feb 2021) ☐ 52.236-2 Differing Site Conditions (Jul 2025) ☐ 52.236-3 Site Investigation and Conditions Affecting the Work (Jul 2025) ☒ 52.236-6 Superintendent by the Contractor (Jul 2025) ☒ 52.236-7 Permits and Responsibilities (Jul 2025) ☐ 52.236-8 Other Contracts (Jul 2025) ☒ 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements (Jul 2025) ☒ 52.236-10 Operations and Storage Areas (Jul 2025) ☒ 52.236-11 Use and Possession Prior to Completion (Jul 2025) ☒ 52.236-12 Cleaning Up (Jul 2025) ☒ 52.236-13 Accident Prevention (Jul 2025) ☐ Alternate I (Nov 1991) of 52.236-13 ☐ 52.236-14 Availability and Use of Utility Services (Jul 2025) ☒ 52.236-15 Schedules for Construction Contracts (Jul 2025) ☒ 52.236-16 Quantity Surveys (Jul 2025) ☐ Alternate I (Apr 1984) of 52.236-16 ☒ 52.236-17 Layout of Work (Jul 2025) ☒ 52.236-21 Specifications and Drawings for Construction (Jul 2025) ☐ Alternate I (Apr 1984) of 52.236-21 ☐ Alternate II (Apr 1984) of 52.236-21 ☒ 52.242-14 Suspension of Work (Apr 1984) ☐ 52.248-3 Value Engineering (Oct 2025) ☐ Alternate I (Apr 1984) of 52.248-3

Other Applicable Clauses

52.217-7 Option for Increased Quantity - Separately Priced Line Item (Mar 1989) 52.217-8 Option to Extend Services (Nov 1999) 30 calendar days prior to contract expiration 52.217-9 Option to Extend the Term of the Contract (Mar 2000)

(a) 30 Calendar days prior to contract expiration and 60 days

(c) five years and 6 months.

52.232-90 Fast Payment Procedures (Nov 2025) 52.245-2 Government Property Installation Operation Services (Apr 2012) 52.245-9 Use and Charges (Apr 2012) 52.246-15 Certificate of Conformance (Apr 1984) 52.247-34 F.O.B. Destination (Jan 1991)

AGAR Clauses This solicitation incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of the clause may be accessed electronically at Internet address https://www.usda.gov/guidance-documents/acquisition-policy/ocp/usda-agar30-sept-26pdf

AGAR 452.203-70 Unenforceable Supplier Terms (Sep 2026)

AGAR 452.204–70 Modification for Contract Closeout (Apr 2026)

AGAR 452.204‑71 Personal Identity Verification and Workforce Integrity of Contractor Employees (Apr 2026)

AGAR 452.232-71 Progress Payments for Commercial Construction Contracts (May 2026)

AGAR 452.236-70 Electronic Submission of Payment Requests (Sep 2026)

Solicitation Information -

Award Type

It is anticipated that a firm-fixed price contract(s) will be awarded as a result of this IFB.

Lowest price per responsive/responsible package will be selected.

The Government reserves the right to make more than one award (multiple awards) for different line items, if, after considering the additional administrative cost to the Government of awarding and administering separate purchase orders, it is determined that the multiple awards will result in the best value to the Government. For purposes of evaluating the cost of making multiple awards, it is assumed that the administrative cost of awarding and administering a purchase order is $500.

The Government intends to make one award from this solicitation. Therefore, to be considered responsive, contractors must submit pricing for all items.

Period of Performance

Period of Performance: 65 Days After Notice to Proceed

Organized Site Visit This project is located at, USDA 180 Canfield Street, Morgantown, WV Date: 12/9/2026 Time: 1000 EST POC: Patrick Meyer, Patrick.R.Meyer@usda.gov, 304-704- 2429. Please RSVP so we don’t leave you behind

Last Day for Questions: 12/18/2026

BID SUBMITTAL DEADLINE:

− Date: 01/06/2027 Time: 1000 EST − Bids will be submitted electronically and include Bid Bond/signed SF1442/Schedule B of items − Email as follows:

o To Cynthia.granderson@usda.gov o Subject Line: 12445127B0005_Company Name_BID o Call 601-965-1619 to confirm receipt. The USDA-FS will send an email confirmation of receipt.

Evaluation and Basis for Award The provision at FAR 52.212-2, Evaluation—Commercial Products and Commercial Services is not applicable to this IFB. In lieu of this provision, quotes will be evaluated in accordance with FAR

14.306 based on the criteria listed below. Award will be made to the lowest price that is:

− FAR 14.306-1 Responsive − FAR 14.306-2 Responsible mailto:Patrick.R.Meyer@usda.gov

Other Information - Include any other information as needed for the solicitation.

52.252-1 Solicitation Provisions Incorporated by Reference Feb 1998 This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es): https://www.acquisition.gov/far-overhaul/far-part-deviation-guide/far-overhaul-part-52

52.212-1 Instructions to Offerors - Commercial Products and Commercial Services (Nov 2025) Add any items at FAR 52.212-1 not already stated and any other applicable instructions such as page limits, font size, document type required for submission (PDF, Excel). Remember to keep things simple under simplified acquisitions. In most cases there is no need for explicit instructions for page limits, font size, volumes, etc. This should be limited to more complex acquisitions. Some examples of what would be routinely used for simplified acquisitions are:

FAR 52.212-1 is amended as follows:

General Instructions. Each of the parts shall be separate and complete so that evaluation of one may be accomplished independently from evaluation of the other. Bids submitted in response to this solicitation shall be furnished as specified below:

The bids must include the following:

a. Acknowledgement of solicitation amendments (if any). This can be accomplished by submitting the signed SF-30(s).

b. Scanned copy of fully executed Bid Guarantee (Standard Form 24 and Power of Attorney)

c. Schedule B completed (Package Attachment 1- Schedule of Items- Format- Adobe PDF

d. Signed SF1442

Period for acceptance of offers.

The Offeror agrees to hold the prices in its offer firm for 90 calendar days from the date specified for receipt of offers.

Questions Questions shall be submitted via email to cynthia.granderson@usda.gov and are due no later than December 18, 2026, at 12:00 PM Eastern Time. This will ensure enough time to respond before the solicitation period ends. Please include the solicitation name and number as the subject line of the email.

52.203-18 Prohibition on Contracting with Entities that Require Certain Internal Confidentiality Agreements or Statements-Representation (Jan 2017) https://www.acquisition.gov/far-overhaul/far-part-deviation-guide/far-overhaul-part-52 https://www.acquisition.gov/far-overhaul/far-part-deviation-guide/far-overhaul-part-52 mailto:cynthia.granderson@usda.gov

52.209-2 Prohibition on Contracting with Inverted Domestic Corporations - Representation (Sep 2025) 52.209-11 Representation by Corporations Regarding Delinquent Tax Liability or a Felony Conviction under any Federal Law (Sep 2025) 52.240-90 Security Prohibitions and Exclusions Representations and Certifications (Nov 2025)

The following provisions are applicable if checked: You can either leave all clauses and check the boxes of the ones that apply or delete the clauses that do not apply. If you delete lines, you will need to right-click on the box and select “remove content control” before it will delete.

☐ 52.203-11 Certification and Disclosure Regarding Payments to Influence Certain Federal Transactions (Sep 2024) ☒ 52.204-7 System for Award Management—Registration (Nov 2025)

☐ Alternate I (Nov 2025) to 52.204-7 ☐ 52.204-90 Offeror Identification (Nov 2025) ☐ 52.207-6 Solicitation of Offers from Small Business Concerns and Small Business Teaming Arrangements or Joint Ventures (Multiple-Award Contracts) (Aug 2024) ☐ 52.209-12 Certification Regarding Tax Matters (Oct 2025) ☐ 52.219-2 Equal Low Bids (Nov 2025) ☒ 52.222-5 Construction Wage Requirements, Secondary Site of the Work (Nov 2025) ☒ 52.222-18 Certification Regarding Knowledge of Child Labor for Listed End Products (Feb 2021) ☐ 52.222-48 Exemption from Application of the Service Contract Labor Standards for Maintenance, Calibration, or Repair of Certain Equipment–Certification (Nov 2025) ☐ 52.222-52 Exemption from Application of the Service Contract Labor Standards for Certain Services-Certification (Nov 2025) ☐ 52.222-56 Certification Regarding Trafficking in Persons Compliance Plan (Oct 2020) ☐ 52.223-4 Recovered Material Certification (May 2008) ☐ 52.225-2 Buy American Certificate (Oct 2022) ☐ 52.225-4 Buy American-Free Trade Agreements-Israeli Trade Act Certificate (Nov 2025) ☐ 52.225-6 Trade Agreements-Certificate (Feb 2021) ☒ 52.225-10 Notice of Buy American Requirement- Construction Materials (May 2014) ☐ Alternate I (May 2014) of 52.225-10 ☐ 52.225-12 Notice of Buy American Requirement-Construction Materials under Trade Agreements (May 2014) ☐ Alternate I (May 2014) of 52.225-12 ☐ Alternate II (Nov 2023) of 52.225-12

☐ 52.226-3 Disaster or Emergency Area Representation (Nov 2007) ☒ 52.228-1 Bid Guarantee (Sep 1996) ☐ 52.229-11 Tax on Certain Foreign Procurements—Notice and Representation (Jul 2025)

Other Applicable FAR Provisions

AGAR Provisions This solicitation incorporates one or more provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of the clause may be accessed electronically at Internet address

NOTICE FOR FILING AGENCY PROTESTS

United States Department of Agriculture (USDA) Protest Procedures

The United States Department of Agriculture (USDA) is committed to fair, transparent, and efficient acquisitions. Interested parties with concerns about this solicitation are encouraged to seek resolution through the following USDA procedures.

Tier 1: Contracting Officer Concern Resolution

Submission: Interested parties with concerns about either the solicitation or subsequent award should first submit their concern directly to the Contracting Officer, providing sufficient detail to allow the Contracting Officer to understand and assess the issue.

Process: The Contracting Officer will review the concern, seek clarification as needed, and engage with the interested party to attempt prompt resolution.

Review Timeline: The Contracting Officer will make every effort to provide a response or resolution within 10 business days of receiving the concern.

Effect on Award or Performance: Tier 1 engagement is not considered an official notification of filing an agency protest and does not pause solicitation deadlines, delay award decisions, or suspend contract performance.

Next Steps: If the matter cannot be resolved at Tier 1, the interested party may file a written agency protest under Tier 2. USDA encourages all parties to seek resolution with the Contracting Officer before filing an agency protest.

Tier 2: Agency Protest If concerns cannot be resolved at Tier 1, an interested party may file a written agency protest with either the Contracting Officer or the USDA Independent Review Authority. The decision by the USDA Independent Review Authority is an alternative to a decision by the Contracting Officer. The USDA Independent Review Authority will not consider an appeal of the Contracting Officer’s decision on an agency protest.

The protest must state whether the protester elects review by the Contracting Officer, by the UDSA Independent Review Authority. If no election is stated, the Contracting Officer will decide the protest.

Required Information: Protests shall include the information set forth in FAR 33.104-4 (a)(3).

Failure to submit the required information may result in a delay or dismissal of the protest.

Submission: Agency protests should be submitted electronically to SPE.inquiry@usda.gov and the Contracting Officer.

Timeliness: Protests must be filed within the timeframes specified in FAR 33.104.

mailto:SPE.inquiry@usda.gov

Effect on Award or Performance: Contract awards or performance will be suspended during the protest period unless justified in writing for urgent and compelling reasons or determined to be in the best interest of the Government.

Review Timeline: USDA strives to resolve agency-level protests within 35 business days of receipt.

Election of Forum: By filing a protest with USDA, the protesters agree not to file a protest on the same matter with the Government Accountability Office (GAO) or any other external forum while the agency protest is pending. If such a protest is filed externally, the USDA agency protest will be dismissed.

Questions: Questions regarding this notice or protest procedures should be directed to the Contracting Officer identified in this solicitation.

US Department of Agriculture (USDA)

Statement of Work

USDA Forest Service

Northern Research Station

180 Canfield Street, Morgantown, WV

Contents Project General Information

1.0 Scope of Work

2.0 Contractor Requirements

3.0 Technical Requirements / Tasks ........................................................................................................ Error! Bookmark not defined.

4.0 Government Furnished

5.0 Deliverables / Schedule

6.0 Travel

7.0 Contractor’s Key Personnel

8.0 Security Requirements

Attachment

Project

NRS MORGANTOWN PAVEMENT RESTORATION

General Information

1.0 Scope of Work

Project Contact

Contracting Officer’s Representative (COR) Patrick Meyer 304-919-8674

Patrick.R.Meyer@usda.gov

Background:

This project shall generally consist of, but not limited to the following: providing all labor, materials, tools, equipment, permits, testing, and reports required to crack seal, seal coat, and line paint parking lots of the USDA Northern Research Station Lab and Annex at the 180 Canfield Street, Morgantown, WV location as defined by the drawings and specifications

The intent of this project is to inspect the specified parking lots for areas needing maintenance or repairs to cracks within the asphalt before seal coating and line painting the entire parking lot(s) as originally laid out or as specified in the project drawings.

All work shall be completed within 90 calendar days from receipt of Notice to Proceed.

Care shall be taken so that no damage occurs to parked vehicles, grassy areas, and existing structures.

Waste Materials – all waste material must be removed from the site daily. This USDA facility has no waste / fill pile on campus.

Work Schedule –All work MUST be completed during the evenings with the sealcoating and line painting only taking place on Friday, Saturday, or Sunday. All work must be scheduled with the CO and COR.

Pre-Bid Meeting – All Prospective Bidders are to attend a mandatory pre-bid meeting.

Estimated Quantities:

Seal Coating: 45,950 SF Crack Sealing: 2,000 LF

Striping: 80 stalls, 6 ADA stalls, Hatched Areas All quantities are estimated and shall be field verified.

The following documents are incorporated into the statement of work and can be found as attachments to this solicitation: Specifications & Site Plan

2.0 Contractor Requirements

1. Report to the Contracting Officer, or his/her designated representative, any problem that may arise beyond the scope of this contract.

2. Providing adequate advance notice when using products that may produce noxious fumes or excessive noise that would impact daily operations.

3. Safety. The contractor shall comply with all OSHA standards for employee safety. It is the contractor’s responsibility to ensure its employees are properly trained and equipped for potential hazards.

4. Bidders MUST be registered in the System for Award Management (SAM) prior to award of contract. Website:

www.sam.gov

5. Damage to Contractor’s Property: The Government will not be responsible in any way for damage to the Contractor’s equipment or the Contractor’s employees’ personal belongings brought onto the Government premises during the performance of work and this contract.

6. Any damage to Government Property incurred during the implementation of this contract must be repaired or replaced by the contractor to the satisfaction of the Government representatives.

3.0 Government Furnished

Utilities (water, electric) may be available with the permission of the Government. Coordinate with COR.

4.0 Deliverables / Schedule

All equipment, labor and supplies are to be provided by the contractor that has been awarded the contract.

5.0 Travel

Not Applicable

6.0 Contractor’s Key Personnel

Contractor will be responsible for any personnel that are employed by them working on Federal property.

7.0 Security Requirements

No access to any government owned buildings shall be granted

Attachment

1. Main Building parking lot and driveway map

Site Map

180 Canfield Street, Morgantown, WV Parking Lot hatched

Northern Research Station

NRS Morgantown Pavement Restoration

Specifications

01 10 00 – Summary

01 33 00 – Submittal Procedures

01 50 00 - Temporary Facilities and Controls

01 71 00 – Weed and Disease Prevention

01 74 19 – Construction Waste Management and Disposal

32 01 11 – Pavement Cleaning

32 01 17 – Flexible Paving Repair (Crack Sealing)

32 12 36 – Seal Coats

32 17 23 – Pavement Markings

32 90 00 – Seeding and Mulching

SECTION 011000 - SUMMARY

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Project information.

2. Work covered by Contract Documents.

3. Contractor's use of site and premises.

4. Coordination with occupants.

5. Work restrictions.

6. Specification and Drawing conventions.

1.2 PROJECT INFORMATION

A. Project Identification: NRS Morgantown Pavement Restoration

1. Project Location: 180 Canfield Street, Morgantown, WV

B. Owner: USDA Forest Service – Northern Research Station

1. Site Contact & Contracting Officer’s Representative: Patrick Meyer – Patrick.R.Meyer@usda.gov

1.3 WORK COVERED BY CONTRACT DOCUMENTS

A. The Work of Project is defined by the Contract Documents and consists of the following:

1. Please reference Statement of work and other Contract Documents.

B. Type of Contract:

1. Project will be constructed under a single prime contract.

1.4 CONTRACTOR'S USE OF SITE AND PREMISES

A. Limits on Use of Site:

1. Limit use of Project site to areas immediately in the area of work, unless otherwise approved by COR. Do not disturb portions of Project site beyond areas in which are required to complete the contract work.

2. Driveways, Walkways, and Entrances: Keep driveways, loading areas, and entrances serving premises clear and available to Owner, Owner's employees, and emergency vehicles at all times. Do not use these areas for parking or for storage of materials unless approved by the COR.

B. Condition of Existing Building: Maintain portions of existing building affected by construction operations in a weathertight condition throughout construction period.

Repair damage caused by construction operations.

C. Condition of Existing Grounds: Maintain portions of existing grounds, landscaping, and hardscaping affected by construction operations throughout construction period. Repair damage caused by construction operations.

1.5 COORDINATION WITH OCCUPANTS

A. Full Owner Occupancy: Owner will occupy site and existing building(s) during entire construction period. Cooperate with Owner during construction operations to minimize conflicts and facilitate Owner usage. Perform the Work so as not to interfere with Owner's day-to-day operations. Maintain existing exits unless otherwise indicated.

B. A schedule is to be presented to COR and CO within 10 business days of Award.

C. Notify COR a minimum of two week prior to beginning work.

D. Work must be scheduled in distinct phases according to to preserve access, safety transitions, and parking availability.

1.6 WORK RESTRICTIONS

A. Comply with restrictions on construction operations.

1. Comply with limitations on use of public streets, work on public streets, rights of way, and other requirements of authorities having jurisdiction.

2. At the end of each working day, work area to be cleaned.

B. On-Site Work Hours: Hours of work must be during the evenings and the Sealcoating and Line Painting MUST be completed during Friday, Saturday or Sunday. Permission to work outside these hours can be requested in writing and granted by the COR in writing.

C. Existing Utility Interruptions: Do not interrupt utilities serving facilities occupied by Owner or others unless permitted under the following conditions and then only after providing temporary utility services according to requirements indicated:

1. Notify COR not less than seven days in advance of proposed utility interruptions.

2. Obtain COR written or verbal permission before proceeding with utility interruptions.

D. Noise, Vibration, Dust, and Odors: Coordinate operations that may result in high levels of noise and vibration, dust, odors, or other disruption to Owner occupancy with Owner.

1. Notify COR not less than seven days in advance of proposed disruptive operations.

2. Obtain COR written permission before proceeding with disruptive operations.

1.7 SPECIFICATION AND DRAWING CONVENTIONS

A. Specification Content: The Specifications use certain conventions for the style of language and the intended meaning of certain terms, words, and phrases when used in particular situations. These conventions are as follows:

1. Imperative mood and streamlined language are generally used in the Specifications. The words "shall," "shall be," or "shall comply with," depending on the context, are implied where a colon (:) is used within a sentence or phrase.

2. Text Color: Text used in the Specifications, including units of measure, manufacturer and product names, and other text may appear in multiple colors or underlined as part of a hyperlink; no emphasis is implied by text with these characteristics.

3. Hypertext: Text used in the Specifications may contain hyperlinks. Hyperlinks may allow for access to linked information that is not residing in the Specifications. Unless otherwise indicated, linked information is not part of the Contract Documents.

4. Specification requirements are to be performed by Contractor unless specifically stated otherwise.

B. Division 01 General Requirements: Requirements of Sections in Division 01 apply to the Work of all Sections in the Specifications.

PART 2 - PRODUCTS

A. Reference Section: 32 01 17 – Flexible Paving Repair (Crack Sealing) B. Reference Section: 32 12 36 – Seal Coats C. Reference Section: 32 17 23 – Pavement Markings

END OF SECTION 01 10 00

SECTION 01 33 00 - SUBMITTAL PROCEDURES

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Submittal schedule requirements.

2. Administrative and procedural requirements for submittals.

1.2 DEFINITIONS

A. Approval: Equivalent to “No Exception Taken”.

B. Approved or Approved Equivalent: To possess the same performance qualities and characteristics and fulfill the utilitarian function without any decrease in quality, durability or longevity. For equipment/products defined by the Contractor as "equivalent", substitution requests must be submitted to Contracting Officer’s Representative for consideration and be approved by the COR in writing. Approval shall constitute “No Exception Taken” and shall not be otherwise construed.

C. "No Exception Taken" constitutes that review is for general conformance with the design concept expressed in the Contract Documents for the limited purpose of checking for conformance with information given. Any action is subject to the requirements of the Contract Documents. Contractor is responsible for the dimensions and quantity and will confirm and correlate at the job site, fabrication processes and techniques of construction, coordination of the work with that of all other trades, and the satisfactory performance of the work.

D. Action Submittals: Written and graphic information and physical samples that require CO or COR’s responsive action. Action submittals are those submittals indicated in individual Specification Sections as "action submittals."

E. Informational Submittals: Written and graphic information and physical samples that do not require CO or COR’s responsive action. Submittals may be rejected for not complying with requirements. Informational submittals are those submittals indicated in individual Specification Sections as "informational submittals."

1.3 SUBMITTAL FORMATS

A. Submittal Information: Include the following information in each submittal:

1. Contract Name and Number.

2. Date.

3. Name of Contractor.

4. Name of firm or entity that prepared the submittal

5. Names of subcontractor, manufacturer, and supplier.

6. Category and type of submittal.

7. Submittal Purpose and description.

8. Number and title of Specification Section, with paragraph number and generic name for each of multiple items.

9. Drawing number and detail references, as appropriate.

10. Indication of full or partial completion.

11. Consecutive transmittal number.

12. Submittal and transmittal distribution record.

13. Other necessary identification.

14. Remarks.

1.4 SUBMITTAL PROCEDURES

A. Prepare and submit submittals required by individual Specification Sections as PDF electronic files and as indicated for samples and other physical submittals. Types of submittals are indicated in individual Specification Sections.

B. Submittals shall be transmitted via email to the COR & CO.

C. Identify and incorporate information in each electronic submittal file as follows:

1. Assemble complete submittal package into a single indexed file incorporating submittal requirements of a single Specification Section and transmittal form acceptable to Government with links enabling navigation to each item.

2. Provide means for insertion to permanently record Contractor's review and approval markings and action taken by COR.

D. Coordination: Coordinate preparation and processing of submittals with performance of construction activities

1. Coordinate each submittal with fabrication, purchasing, testing, delivery, other submittals, and related activities that require sequential activity.

2. Submit all submittal items required for each Specification Section concurrently unless partial submittals for portions of the Work are indicated on approved submittal schedule.

3. Submit action submittals and informational submittals required by the same Specification Section as separate packages under separate transmittals.

4. Coordinate transmittal of different types of submittals for related parts of the Work so processing will not be delayed because of need to review submittals concurrently for coordination.

a. Contracting Officer or COR reserves the right to withhold action on a submittal requiring coordination with other submittals until related submittals are received.

E. Processing Time: Allow time for submittal review, including time for resubmittals, as follows. Time for review shall commence on Contracting Officer's and COR’s receipt of submittal. No extension of the Contract Time will be authorized because of failure to transmit submittals enough in advance of the Work to permit processing, including re-submittals

1. Initial Review: Allow 15 days for initial review of each submittal. Allow additional time if coordination with subsequent submittals is required.

Contracting Officer or COR will advise Contractor when a submittal being processed must be delayed for coordination.

2. Intermediate Review: If intermediate submittal is necessary, process intermediate review in same manner as initial submittal.

3. Resubmittal Review: Allow 15 days for review of each resubmittal.

4. Sequential Review: Where sequential review of submittals by Contracting Officer's consultants, Government, or other parties is indicated, allow 21 days for initial review of each submittal.

F. Resubmittals: Make resubmittals in same form and number of copies as initial submittal.

1. Indicate date and content of previous submittal.

2. Indicate date and content of revision in label or title block and clearly indicate extent of revision.

3. Resubmit submittals until they are approved in writing by the CO or COR (in a method acceptable to the specifications or as otherwise described by the CO).

G. Distribution: Furnish copies of final submittals to manufacturers, subcontractors, suppliers, fabricators, installers, authorities having jurisdiction, and others as necessary for performance of construction activities. Show distribution on transmittal forms.

H. Use for Construction: Retain complete copies of submittals on Project site. Use only final action or material submittals that are approved in writing by the Contracting Officer or

COR.

1.5 SUBMITTAL REQUIREMENTS

A. Product Data: Collect information into a single submittal for each element of construction and type of product or equipment.

1. If information must be specially prepared for submittal because standard published data are unsuitable for use, submit as Shop Drawings, not as Product Data.

2. Clearly mark each copy of each submittal to show which products and options are applicable.

3. Include the following information, as applicable:

a. Manufacturer's catalog cuts.

b. Manufacturer's product specifications.

c. Standard color charts.

d. Statement of compliance with specified referenced standards.

e. Testing by recognized testing agency.

f. Application of testing agency labels and seals.

g. Notation of coordination requirements.

h. Availability and delivery time information.

4. Submit Product Data before Shop Drawings, and before or concurrent with Samples.

5. Submit Product Data in PDF electronic file.

B. Shop Drawings: Prepare Project-specific information, drawn accurately to scale. Do not base Shop Drawings on standard printed data.

1. Preparation: Fully illustrate requirements in the Contract Documents. Include the following information, as applicable:

a. Identification of products.

b. Schedules.

c. Compliance with specified standards.

d. Notation of coordination requirements.

e. Notation of dimensions established by field measurement.

f. Relationship and attachment to adjoining construction clearly indicated

2. Submit Shop Drawings in PDF Electronic Format.

C. Design Data/Product Data/Materials Submittals: Prepare and submit written and graphic information indicating compliance with indicated performance and design criteria in individual Specification Sections. Include list of assumptions and summary of loads. Include load diagrams if applicable. Provide name and version of software, if any, used for calculations. Number each page of submittal.

D. Certificates:

1. Certificates and Certifications Submittals: Submit a statement that includes signature of…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .