REV 1 Attachment B1 SOW Supplement.pdf

PDF 214 KB Posted

Attached to
Site Preparation/Timber Stand Improvement Hiawatha NF
Solicitation number
12444624Q0075
Issued by

About this file

This document is a Statement of Work (SOW) Supplement that outlines site preparation and timber stand improvement projects to be performed in the Hiawatha National Forest. The SOW provides detailed prescriptions for each project unit, including the number of acres, location information, and specific treatment requirements such as tree release, pruning, cleaning, and removal of undesirable species. The work is part of a federal contract opportunity with Solicitation Number 12444624Q0075, issued by the U.S. Department of Agriculture Forest Service. The projects involve a range of forest management activities across both the East and West Zones of the Hiawatha National Forest. Key objectives include improving forest health, releasing desirable tree species, and controlling invasive or diseased vegetation. No additional details about the overall contract, such as pricing, response dates, or set-asides, are provided in this SOW Supplement.

View the file

Other files

File Type Posted
REV 1 Attachment A Schedule of Items.docx DOCX document
REV 1 Attachment C2 WZ Maps.pdf PDF
Amendment 0001.pdf PDF
REV 1 Attachment C1 EZ Maps.pdf PDF
Attachment C2 WZ Maps.pdf PDF
Attachment D Wage Determination.pdf PDF
12444624Q0075 HIA TSI.docx DOCX document
Attachment C1 EZ Maps.pdf PDF
Attachment B1 SOW Supplement.pdf PDF
Attachment A Schedule of Items.docx DOCX document
Attachment B Statement of Work.docx DOCX document
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work - Supplement

EAST ZONE Brief Description of Projects:

Unit Acres Rx

1.1

Crown release up to 109 trees per acre (20’X20’). Additionally, remove all bent over ice damaged regeneration that is still alive (< 5” DBH). Regeneration that only has stem breakage do not need to be removed.

1.2 36 Crown release up to 109 trees per acre (20’X20’).

1.3

Crown release up to 109 trees per acre (20’X20’). Additionally, remove all bent over ice damaged regeneration that is still alive (< 5” DBH). Regeneration that only has stem breakage do not need to be removed.

1.4 18 Cut all pin cherry greater than 1 foot tall. Ensure all slash is lying flat on the ground and not hampering or damaging other regeneration.

1.5 18 Cut all pin cherry greater than 1 foot tall. Ensure all slash is lying flat on the ground and not hampering or damaging other regeneration.

1.6 32 Cut all pin cherry greater than 1 foot tall. Ensure all slash is lying flat on the ground and not hampering or damaging other regeneration.

1.7

Release 194 TPA on a 15’X15’ spacing. Spacing can vary up to 50% to select optimal crop trees.

Remove trees less than 5-inch DBH within 5 feet of the bole of the release tree. Additionally, trees crowns which impede or overtop the crown of the release tree should be removed.

1.8

Release 194 TPA on a 15’X15’ spacing. Spacing can vary up to 50% to select optimal crop trees.

Remove trees less than 5-inch DBH within 5 feet of the bole of the release tree. Additionally, trees crowns which impede or overtop the crown of the release tree should be removed.

1.9

Cut all pin cherry greater than 1 foot tall. Ensure all slash is lying flat on the ground and not hampering or damaging other regeneration. Also, release an additional 194 red pine per acre from aspen and red maple.

1.10 63 Cut all pin cherry greater than 1 foot tall. Ensure all slash is lying flat on the ground and not hampering or damaging other regeneration.

1.11 90 Cut all pin cherry greater than 1 foot tall. Ensure all slash is lying flat on the ground and not hampering or damaging other regeneration.

2.1 38 Release 194 trees per acre (15'x15') of white pine and red oak. Prune white pine that have been released.

2.2 58 Release 302 trees per acre (12'x12') of white pine, red pine, paper birch, and red oak. Prune white pine and paper birch that have been released.

2.3 72 Release 194 trees per acre (15'x15') of white pine and red oak. Prune white pine that have been released.

8.1 53 Cut ALL sub merchantable American beech (4 feet tall to 5 inch DBH). Trees should be fully severed from the stump and stumps should not be more than 6 inches tall.

8.2 53 Cut ALL sub merchantable American beech and (4 feet tall to 5 inch DBH). Trees should be fully severed from the stump and stumps should not be more than 6 inches tall.

8.3 104 Cut ALL sub merchantable American beech (4 feet tall to 5 inch DBH). Crown Release hemlock less than 5” DBH up to 109 trees per acre (20’x 20’).

8.4 105 Cut ALL sub merchantable American beech and striped maple (4 feet tall to 5 inch DBH). Trees should be fully severed from the stump and stumps should not be more than 6 inches tall.

8.5

Cut ALL sub-merchantable (4 feet tall to 5" DBH) American beech and cherry with signs of black knot. Trees should be fully severed from the stump. The stump should not be more than 6" tall.

Unit Acres Rx

8.6

8.7

8.8.

knot. Trees should be fully severed from the stump. The stump should not be more than 6" tall.

9.1 16 Remove ALL ironwood greater than 3 feet tall and less than 5” in diameter at breast height throughout the stand.

9.2 33 Cut ALL damaged advanced regeneration between 4 feet tall and 5 inches DBH

9.3 62 Cut ALL damaged advanced regeneration between 4 feet tall and 5 inches DBH

Stands to be Treated

Unit District Compartment Stand

1.1 4 45 98

1.2 4 45 78

1.3 4 45 76

1.4 4 45 40

1.5 4 45 44

1.6 4 36 21

1.7 4 47 01

4 47 59

1.8 4 95 55

1.9 4 95 03

1.10 4 52 77

4 52 75

1.11

4 52 12

4 52 14

4 52 74

4 52 08

2.1 4 45 1

2.2 4 116 14

2.3 4 60 92

8.1 4 16 1

8.2 4 123 32

8.3 4 100 26

8.4 4 20 12

4 20 35

8.5 4 21 18

4 21 17

8.6

4 19 1

4 19 12

4 19 47

8.7 4 33 16

4 33 17

8.8 4 99 41

4 99 50

9.1 4 135 113

9.2 4 73 55

9.3 4 95 90

4 95 1

WEST ZONE Brief Description of Project Units:

Unit Acres Stand Rx

1.1 32.3 3-50-27 Release best quality white pine according to the release guidelines found in the TSI Services contract.

1.2 8.5 3-50-02 Release best quality white pine according to the release guidelines found in the TSI Services contract. Cut all Norway spruce 0.5" - 5" DBH.

1.3 90.1 2-77-11 Release red pine according to the release guidelines found in the TSI Services contract.

1.4 85.9 2-77-11 Release red pine according to the release guidelines found in the TSI Services contract.

1.5 1.3 1-40-01 Release red pine according to the release guidelines found in the TSI Services contract.

1.6

11.1

3-50-50 Release the best quality red oaks according to the release guidelines found in the TSI Services contract. Do not cut any aspen as part of a release treatment.

3.1 3.3 1-79-84 Prune and release the best quality white pine at a 20 foot x 20 foot spacing.

4.1 249 1-108-13 Clean all canopy gaps by cutting balsam fir & hardwoods 0.5 - 5" DBH except for oak, yellow birch, or black cherry, if any found.

4.2 22.6 1-121-50 Clean all canopy gaps by cutting balsam fir & hardwoods 0.5 - 5" DBH except for oak, yellow birch, or black cherry, if any found.

4.3 10.2 1-126-11 Clean all canopy gaps by cutting balsam fir & hardwoods 0.5 - 5" DBH except for oak, yellow birch, or black cherry, if any found.

4.4 21.4 1-128-70 Clean all canopy gaps by cutting balsam fir & hardwoods 0.5 - 5" DBH except for oak, yellow birch, or black cherry, if any found.

4.5 9.2 1-126-49 Clean all canopy gaps by cutting balsam fir & hardwoods 0.5 - 5" DBH except for oak, yellow birch, or black cherry, if any found.

4.6 37.4 1-126-45 Clean all canopy gaps by cutting balsam fir & hardwoods 0.5 - 5" DBH except for oak, yellow birch, or black cherry, if any found.

4.7 26.8 1-64-15 Clean all canopy gaps by cutting balsam fir & hardwoods 0.5 - 5" DBH except for oak, yellow birch, or black cherry, if any found.

4.8 106.0 1-86-6 Clean all canopy gaps by cutting balsam fir & hardwoods 0.5 - 5" DBH except for oak, yellow birch, or black cherry, if any found.

4.9 70.0 1-108-12 Clean all canopy gaps by cutting balsam fir & hardwoods 0.5 - 5" DBH except for oak, yellow birch, or black cherry, if any found.

4.10 76.8 3-39-15 Clean all canopy gaps by cutting balsam fir & hardwoods 0.5 - 5" DBH except for oak, yellow birch, or black cherry, if any found.

4.11 39.5 3-39-15 Clean all canopy gaps by cutting balsam fir & hardwoods 0.5 - 5" DBH except for oak, yellow birch, or black cherry, if any found.

4.12 39.4 3-39-24 Clean all canopy gaps by cutting balsam fir & hardwoods 0.5 - 5" DBH except for oak, yellow birch, or black cherry, if any found.

4.13 40.5 1-143-19 Clean all canopy gaps by cutting balsam fir & hardwoods 0.5 - 5" DBH except for oak, yellow birch, or black cherry, if any found.

4.14 32.4 1-143-26 Clean all canopy gaps by cutting balsam fir & hardwoods 0.5 - 5" DBH except for oak, yellow birch, or black cherry, if any found.

4.15 43.0 3-51-42 Clean all canopy gaps by cutting balsam fir & hardwoods 0.5 - 5" DBH except for oak, yellow birch, or black cherry, if any found.

4.16

1-127-10 for oak, yellow birch, or black cherry, if any found. DO NOT CUT ANY

BUTTERNUT

4.17

1-127-12 for oak, yellow birch, or black cherry, if any found. DO NOT CUT ANY

BUTTERNUT

6.1

22.2

1-127-76 Cut all hardwoods 0.5 - 5" DBH (except black cherry, oak, or serviceberry) and all red maple stump sprouts within the unit. Cut all balsam fir 0.5" - 5"

DBH.

6.2 9.2 2-48-27 Cut all hardwoods 0.5" - 5" DBH (except black cherry, oak, or serviceberry) and all red maple stump sprouts within the unit.

6.3 20.7 3-90-56 Cut all hardwoods 0.5" - 5" DBH (except black cherry, oak, or serviceberry) and all red maple stump sprouts within the unit.

6.4 19.7 3-100-80 Cut all hardwoods (except black cherry, oak, or serviceberry) and conifers (except white pine) 0.5 - 5" DBH and all red maple stump sprouts in the unit.

6.5 35.1 2-42-30 Cut all hardwoods (except black cherry, oak, or serviceberry) and conifers 0.5

- 5" DBH and all red maple stump sprouts in the unit.

6.6 17.0 3-100-48 Cut all hardwoods (except black cherry, oak, or serviceberry) and conifers 0.5

- 5" DBH and all red maple stump sprouts within flagged aspen gaps.

6.7 4.8 3-39-46 Cut all hardwoods (except black cherry, oak, or serviceberry) and conifers 0.5" - 5" DBH and all red maple stump sprouts within the unit.

6.8 29.0 1-108-43

& 46 Cut all hardwoods 0.5" - 5" DBH (except black cherry, oak, or serviceberry) and all red maple stump sprouts within the unit.

6.9 12.7 2-24-18 Cut all hardwoods (except black cherry, oak, or serviceberry) and balsam fir

0.5 - 5" DBH and all red maple stump sprouts in the unit.

6.10

15.0

1-144-45 Cut all hardwoods 0.5 - 5" DBH (except black cherry, oak, or serviceberry) and all red maple stump sprouts within the unit. Cut all balsam fir 0.5" - 5"

DBH.

West Zone Stands to be Treated

Acres District Compartment Stand

1.1 32.3 3 50 27

1.2 8.5 3 50 2

1.3 90.1 2 77 11

1.4 85.9 2 77 11

1.5 1.3 1 40 1

1.6 11.1 3 50 50

3.1 3.3 1 079 84

4.1 249 1 108 13

4.2 22.6 1 121 50

4.3 10.2 1 126 11

4.4 21.4 1 128 70

4.5 9.2 1 126 49

4.6 37.4 1 126 45

4.7 26.8 1 064 15

4.8 106.0 1 086 06

4.9 70.0 1 108 12

4.10 76.8 3 039 15

4.11 39.5 3 039 15

4.12 39.4 3 039 24

4.13 40.5 1 143 19

4.14 32.4 1 143 26

4.15 43.0 3 51 42

4.16 10 1 127 10

4.17 11 1 127 12

6.1 22.2 3 100 80

6.2 9.2 2 48 27

6.3 20.7 3 90 56

6.4 19.7 1 127 76

6.5 35.1 2 42 30

6.6 17.0 3 100 48

6.7 4.8 3 39 46

6.8 29.0 1 108 43 & 46

6.9 12.7 2 24 18

6.10 15.0 1 144 45