C05-Attachment 2-Schedule of Items.pdf

PDF 147 KB Posted

Attached to
ACW (Ava-Cassville-Willow Springs Ranger District, Mark Twain National Forest) Toilet Pumping
Solicitation number
12444527Q0009
Issued by

About this file

This document is a Schedule of Items for a federal contract opportunity for bathroom pumping services at multiple recreation areas within the Mark Twain National Forest in the Ava, Cassville, and Willow Springs areas.

The contract requires pumping and maintenance services for septic tanks across nineteen separate locations, including campgrounds, day-use areas, picnic grounds, and tower sites. Services are needed at facilities such as Cobb Ridge Campground, North Fork Campground, Bar K Recreation Area, Caney Picnic Ground, Noblett Recreation Area, Big Bay Day Use, Shell Knob Recreation Area, Hercules Tower, and Pine View Tower. Tank configurations vary by location, ranging from single 500-gallon tanks to dual 2000-gallon tanks, with total capacities per site ranging from 500 to 4000 gallons. Service frequency requirements vary by location, with most sites requiring two services per year and two locations (Item 1G and 5D) requiring four and five services annually, respectively. The total contract scope encompasses approximately 18,500 gallons of pumping capacity across all sites. The anticipated contract award will be structured as a firm fixed price contract. The document does not specify response deadlines, award dates, or pricing instructions, as it functions as the itemized schedule portion of the solicitation package.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ITEM

NUMBER DESCRIPTION Tanks Services per year max Total Gal Per Site

1A Cobb Ridge Campground Vault Building C Two 500 tanks 2 1000 Gal 1B Cobb Ridge Campground Vault Building E Two 500 tanks 2 1000 Gal 1C Cobb Ridge Shower/Flush Toilets Two 2000 tanks 2 4000 Gal 1D Camp Ridge Day Use Two 500 tanks 2 1000 Gal 1E KC Pavilion Day Use Two 500 tanks 2 1000 Gal 1F Cobb Ridge Campground 1st Host One 500 tank 2 500 Gal 1G Cobb Ridge Campground 2nd Host One 1000 tank 5 1000 Gal 2 Bar K Recreation Area Two 500 tanks 2 1000 Gal 3 Caney Picnic Ground Two 500 tanks 2 1000 Gal 4 Hercules Tower One 500 tank 2 500 Gal

5A North Fork Campground Front Two 500 tanks 2 1000 Gal 5B North Fork Campground Back Two 500 tanks 2 1000 Gal 5C North Fork Day Use Area Two 500 tanks 2 1000 Gal 5D North Fork Camp Host Site One 1000 tank 4 1000 Gal 6 Noblett Recreation Area Two 500 tanks 2 1000 Gal 7 Big Bay Day Use Two 500 tanks 2 1000 Gal 8 Shell Knob Recreation Area Two 500 tanks 2 1000 Gal 9 Pine View Tower One 500 tank 2 500 Gal

SCHEDULE OF ITEMS

Ava Cassville Willow Springs/ Mark Twain NF/Ava

PROJECT TITLE: Bathroom Pumping

WORKPLAN ACQUISITION PLAN/REQUISITION NO: (NUMBER)

Period of Performance (Required for Services and A&E) Anticipated Delivery Date (Required for Supply and Construction)

SCHEDULE OF ITEMS

Award anticipated to be a firm fixed price contract.

Sheet1

File details come from the government source that posted it. Updated .