Attachment 2-Statement of work Specifications.pdf
PDF 133 KB Posted
- Solicitation number
- 12444326Q0080
- Issued by
-
Department of Agriculture Forest Service
About this file
This is a Statement of Work and Specifications document for a fence materials purchase by the Coronado National Forest across four ranger districts (Nogales, Sierra Vista, Santa Catalina, and Safford) in Arizona, dated May 26, 2026.
The vendor must supply and deliver all specified fence materials to the four district addresses, with a requirement to call at least 48 hours prior to delivery to confirm receipt availability. The contract completion timeline is four weeks from issuance. All materials must be ASTM certified and include the following items: T-Posts (T-133, 5.5 feet with 4 clips per post), smooth wire (12.5 gauge, Class 1, 1320 feet per roll), barbed wire (12.5 gauge, 2-point with 4-inch barb spacing, Class 1, 1320 feet per roll), wire stays (42 inches, 9.5 gauge, Class 1, 100 stays per bundle), brace angle iron posts (2.5 inches by 2.5 inches by 1/4 inch by 7 feet), angle iron braces (2 inches by 2 inches by 1/4 inch by 7 feet), and nuts and bolts (1/2 inch by 1.5 inches). The document does not specify quantities for each material or pricing terms.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SF 30 Amendment 1.pdf | ||
| Attachment 1-Schedule Of Items .pdf | ||
| Question and Answer Document Coranando.pdf | ||
| SF 30 Amendment 2.pdf | ||
| Original 1449.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of work/ Specifications
CORONADO GY26 RANGE FENCE MATERIALS PURCHASE
NOGALES, SIERRA VISTA, SANTA CATALINA, AND SAFFORD RANGER DISTRICTS
CORONADO NATIONAL FOREST
MAY 26, 2026
Prepared by:
Chrissy Pearson – Rangeland Management Specialist
Coronado Range GY26 Fence Materials Purchase
NOGALES, SIERRA VISTA, SAFFORD, AND SANTA CATALINA RANGER DISTRICTS
CORONADO NATIONAL FOREST
Scope of Work
General Work Location
Supply and deliver the fence materials to the district addresses above. Call at least 48 hours prior to delivery to be sure someone is available to receive the shipment.
Time Limit The vendor will have (4) four weeks to complete this task from issuance of the contract.
----- End Scope of Work -------
Specifications and Drawings
ASTM Certified T-Post, (T-133) 5.5ft, w/ 4 clips/post Smooth Wire, 12.5 gauge, Class 1 (1320 ft. per roll) Barbed Wire, 12.5 gauge, 2pt, 4 inch barb spacing, Class 1, (1320 ft per roll) Wire Stays, 42in, 9.5 gauge, Class 1, (100 stays per bundle) Brace Angle Iron Post (2.5 in X 2.5 in. X 1/4 in. X 7ft) Angle Iron Braces (2 in. X 2 in. X 1/4 in. X 7 ft) Nuts & Bolts, 1/2 in. X 1.5 in.
----- End Specifications and Drawings -------
| Statement of work/ Specifications |
| Scope of Work |
| General Work Location |
| Time Limit |
| Specifications and Drawings |
File details come from the government source that posted it. Updated .