This document contains Questions and Answers related to Solicitation Number 12444324Q0070 for the demolition and clean-up of two former residences on the Wayne National Forest. The key details are:

The removed brush and small trees from the overgrown work areas can be left on-site and do not need to be chipped. Depressions and footing areas can be regraded without the use of imported fill material. This solicitation is being issued by the USDA Forest Service, Region 9 - Eastern Region for the demolition and clean-up work at the Big Bailey House site on Forest Service property.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Answers 12444324Q0070

1. The work areas are significantly overgrown with brush and small trees which will need to be removed for access. Can the removed vegetation be left onsite? Does the removed vegetation need to be chipped if left onsite?

REMOVED BRUSH AND SMALL TREES CAN BE LEFT ON-SITE. THIS MATERIAL DOES NOT HAVE TO

BE CHIPPED.

2. Can the work areas be graded to fill depressions / footings, or must these be filled with imported fill material?

DEPRESSIONS/FOOTING AREAS CAN BE REGRADED. THE USE OF IMPORTED FILL MATERIAL IS

NOT REQUIRED FOR THESE AREAS.