12444125Q0088 ATTACHMENT 1 Specifications updated.pdf

PDF 355 KB Posted

Attached to
Temporary Portable Steel Logging Bridge 40' Length X Minimum 12' Width, Andrew Pickens Ranger District at Sumter National Forest South Carolina
Solicitation number
12444125Q0088
Issued by

About this file

This document is a solicitation from the USDA Forest Service (Solicitation #12444125Q0088) for a temporary portable logging bridge for the Andrew Pickens Ranger District in Mountain Rest, SC. The required bridge must have a 40-foot total span length, minimum 12-foot total width, and be constructed entirely of metal with a modular panel design. Specific technical requirements include a maximum panel weight of 7,200 pounds, hardware for connecting panels, attachment points for loading/unloading, a minimum 70,000-pound rating per axle, and a minimum 100,000-pound rating per vehicle. The bridge will be used to access timber harvest areas and support natural resource management activities, with the delivery destination specified as 112 Andrew Pickens Circle, Mountain Rest, SC 29664.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TEMPORARY PORTABLE LOGGING BRIDGE - ANDREW PICKENS RANGER DISTRICT

USDA Forest Service solicitation: 12444125Q0088

Description of Requirement (including a list of any attachments) Deliver temporary portable logging bridge within the period of performance to USDA Forest Service, 112 Andrew Pickens Circle, Mountain Rest, SC 29664, meeting or exceeding the minimum requirements below. The bridge will be used to access timber harvest areas and for other natural resource management access as needed on the Andrew Pickens Ranger District.

Required Technical Specifications:

1. 40 foot total span length

2. Minimum 12 foot total width

3. All metal construction

4. Modular panel design to facilitate transport of bridge to site

a. Max weight 7,200 pounds per panel

b. Hardware included for connecting panels together

c. Examples show 3 panels; bridge can consist of more or fewer panels, provided each panel weighs less than 7,000 pounds and the assembled bridge has minimum total width of 12 feet

5. Attachment points / hoist links or equivalent to facilitate loading/unloading

6. Minimum 70,000 pound rating per axle

7. Minimum 100,000 pound rating per vehicle (engineered weight certified)

8. Minimum ¼” steel top and bottom plates, or material and thickness providing equivalent strength

Spec #1; 40 ft length

Spec #4;

at least 12 ft width Spec #2 - Metal Construction

Spec #3;

Modular

Panels

File details come from the government source that posted it. Updated .