ATTACH 2A SOW Bradley and Plum Branch Work Centers.pdf

PDF 245 KB Posted

Attached to
Janitorial Services US Forest Service Long Cane Ranger District Federal contract opportunity
Solicitation number
12444121Q0010
Issued by
Department of Agriculture Forest Service

View the file

Other files for this federal contract opportunity

Other files attached to Janitorial Services US Forest Service Long Cane Ranger District, newest first.
File Type Posted
ATTACH 3A- Pictures.pdf PDF
SF 1449 Cont. 12444121Q0010Clauses and Provisions.docx DOCX document
ATTACH 4dol wage rate.pdf PDF
SF1449.doc DOC document
ATTACH 2 SOW Long Cane Office.pdf PDF
Attachment 5 Experience Questionairre.docx DOCX document
ATTACH 3 Frequency Schedule.docx DOCX document
Attach 1 Schedule of Items.xlsx XLSX spreadsheet

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 2

STATEMENT OF WORK

Bradley and Plum Branch Work Centers Janitorial

100. GENERAL.

110. SCOPE. Except for items listed under Government Furnished Property the contractor shall furnish all labor, equipment, supervision, transportation, operating supplies, and incidentals in the performance of work required for janitorial services at the USDA Forest Service, Bradley Work Center (EWC), 120 Bradley Work Road, Bradley, SC 29819 (Greenwood County) and USDA Forest Service, Edgefield Work Center (EWC), 1013 Plum Branch Road, Edgefield, SC 29824 (Edgefield County). All performance must be in accordance with the terms, specifications, and provisions of this contract. All cleaning supplies used for this contract will be in accordance with the Sustainable Acquisition Policy (FAR 23.1).

120. BUILDING DESCRIPTION. For the Bradley Work Center, there are two buildings with a gross occupancy square footage of 1000 feet to be cleaned. The main office building is a two-story structure with two (2) entrance, four (4) offices, and one (1) restroom with shower. The “Annex” building is a one-story structure with one (1) entrance, one (1) office, and two (2) restrooms.

For the Plum Branch Work Center, there are two buildings with a gross occupancy square footage of 600 feet to be cleaned. The main office building is a one-story structure with one entrance, one (1) office, and two (2) restrooms with showers. The Office Annex is a one-story structure with one (1) entrance, one (1) office, and one (1) restroom.

130. DEFINITIONS TECHNICAL. As used throughout this contract, the following terms shall have the meaning set forth below.

131. Clean. "Clean" shall be defined as free of dirt, dust, spots, streaks, stains, smudges, litter, debris, and other residue.

132. Sustainable acquisitions. Products that are energy-efficient, water-efficient, bio-based, environmentally preferable, non-ozone depleting, and products made with recovered material.

133. Disinfect. Cleaning in order to destroy any harmful microorganisms by application of an approved chemical agent.

134. Frequency of Service.

134-1 Annual. Services performed once during a 12-month period. These services must be scheduled with the COR in advance.

134-2 Semi-Annual. Services performed twice during a 12-month period at 160 to 200 calendar day intervals. These services must be scheduled with the COR in advance.

134-3 Quarterly. Services performed four (4) times during each 12-month period of the contract at intervals of 160 to 200 calendar days. These services must be scheduled with the COR in advance.

134-4 Monthly Services performed once every standard calendar month during business hours (i.e. 12 services).

134-5 Weekly. Services performed once each standard calendar week during business hours (i.e. 52 services).

134-6 Bi-weekly. Services performed twice each standard calendar week during business hours (i.e. 104 services).

134-7 As-Needed. These are services that are provided in as-needed. Services outside the scope of this contract must be approved in writing by the Contracting Officer (CO) prior to any services being performed. If unsure if the services being requested are outside the scope of the contract, it is the Contractor’s responsibility to ask the COR and/or CO for further clarification.

140. GOVERNMENT-FURNISHED PROPERTY.

141. The government shall make available to the contractor the Government-furnished property described in this contract. The contractor shall be liable for all loss or damage of such delivered Government-Furnished Property until completion and final acceptance of work required under this contract. If the Government fails to make timely delivery of such Government-Furnished Property suitable for its intended use and upon written request from the contractor, the Contracting Officer shall make an equitable adjustment of contract delivery of performance dates or contract price, or both, pursuant to the “changes” clause of the FAR 52.212-4.

142. The Forest Service shall furnish the following:

142-1. Dumpster. The Contractor will dispose of the trash and refuse in the dumpster located in the immediate vicinity or as directed by the COR. Dumpster doors shall be closed after each use.

142-2. Utilities. Water and electricity will be provided to operate equipment as necessary to complete these services.

142-3. Storage Closet. The Government will furnish an unsecured area for storage of Contractor furnished supplies and equipment. The Contractor shall maintain this closet to ensure it is safe, clean, and organized. No hazardous materials are to be stored in these facilities.

142-4. Keys. Keys will be provided by the COR. It is the Contractor’s responsibility to keep keys in a safe location and return keys as required by the COR. If the Contractor fails to return keys within two weeks of end of contract or upon determination that keys have been lost, the Government reserves the rights to change all door locks and withhold said expenses from the Contractor’s pay.

142-5. OFFICE/RESTROOM SUPPLIES. Supplies required to be furnished by the Government include but are not limited to the following:

142-5a. Plastic Trash Can Liners/Bags. Trash liners/bags shall be suitable for the type and need of trash receptacle.

142-5b. Toilet Tissues. Toilet tissue must be no less than two-ply tissue.

142-5c. Paper Towels. Paper towels shall be bi- or tri-fold paper suitable for the bathroom dispensers.

142-5d. Hand Soap. Liquid anti-bacterial soap for installed dispensers and/or hand size push/pump liquid anti-bacterial soap when installed dispensers are non-operational.

142-5e. Disinfectant Bar/Strainer. Disinfectant bars/strainers shall be installed in all urinals and changed on an as-needed basis to ensure sanitized conditions are maintained.

200 - CONTRACTOR FURNISHED PROPERTY

201. GENERAL. Except for those items or services specifically stated to be Government furnished, the contractor shall furnish everything (equipment, materials, supplies, incidentals, etc.)

required to perform the tasks identified in this contract.

201-1. Cleaning supplies. The contractor will provide all cleaning supplies necessary to complete this janitorial project that is in accordance with industry standards. These supplies include but are not limited to cleaning chemicals and equipment to apply such cleaning chemicals. Bio-preferred products shall be considered.

202. A minimum two-week supply of restroom supplies shall be kept on site.

300 – SUPPLY SPECIFICATIONS

310 – BIO-BASED/BIO-PREFERRED PRODUCTS

The Contractor shall utilize sustainable materials for this contract as is adequately and financially feasible. The bio-based supplies and materials shall be of a type and quality that conform to applicable federal specifications and standards. All supplies and materials to be used in the performance of work described herein are subject to the approval of the Contracting Officer Representative (COR). The following bio-based products may be used in this contract (this list is not all inclusive): all-purpose cleaners, degreasers/cleaners, deodorizers, floor finishers, disinfectant sanitizers, glass cleaners, and bathroom cleaners). USDA’s Bio-Preferred program can be found at www.biopreferred.gov.

320. RECYCLED PRODUCTS. 100 percent of all paper products procured (toilet tissue and paper towels) shall contain recycled materials. The content shall meet the specifications shown on the following website: http://www.epa.gov/epaoswer/non-hw/procure/backgrnd.htm )

330. MANDATORY SOURCES OF SUPPLY OR SERVICE REQUIREMENT

Certain supplies to be provided under this contract must use mandatory sources (FAR 52.208-9).

One of the mandatory sources for Bio-Based and Bio-Preferred products can be found at the GSA Bio-Preferred website: www.gsa.gov/portal/content/105368.

340. Material Safety Data Sheets. Prior to the starting date of the contract, the Contractor shall submit to the COR a list giving the name of the manufacturer, the brand name, and Material Safety Data Sheets with the intended use of each of the materials the Contractor proposes to use in the performance of the work. Contractor shall not use any materials which the COR determines to the unsuitable for said purpose, or harmful to the surfaces to which it is to be applied. Any material which the COR suspects of not meeting safety standards shall be tested by a recognized testing laboratory at the Contractor’s expense.

400 – ADMINISTRATIVE

410. WORK SCHEDULE. All work, except stripping and waxing, will be done during normal working hours, 8:00 A.M. – 4:30 P.M., Mondays through Fridays; federal buildings are closed on weekends. The contractor shall submit an annual schedule for services and any revisions to the key personnel roster to the COR for approval at the pre-performance conference; the schedule shall include, but exclusive of, approximate cleaning times and dates and how many people should be expected to clean. The contractor shall be allowed 30 days to adjust work schedules based on inspections, use, traffic, special requirements identified in PWS, and minimum frequencies of changes as discussed in writing with the COR, as appropriate. This second work schedule shall be submitted to the CO for approval within 10 days after the first contract month period. The contractor shall provide the work schedule to the COR and not deviate from the approved schedule without prior approval from the CO or COR. Any permanent changes to the schedule must be submitted 10 days before implementation and receive COR approval before the Government will allow the proposed changes. The COR’s contact information will be provided to the Contractor at the pre-performance meeting.

420. FEDERAL HOLIDAYS. Federal buildings will be closed during federal holidays.

http://www.biopreferred.gov/ http://www.epa.gov/epaoswer/non-hw/procure/backgrnd.htm http://www.gsa.gov/portal/content/105368

New Year’s Day - 1 January Martin Luther King Day - 3rd Monday in January Washington’s Birthday - 3rd Monday in February Memorial Day - last Monday in May Independence Day - 4 July Labor Day - 1st Monday in September Columbus Day - 2nd Monday in October Veteran’s Day - 11 November Thanksgiving Day - 4th Thursday in November Christmas Day - 25 December

If these holidays fall on Saturday, the preceding Friday will be observed. If these holidays fall on Sunday, the following Monday will be observed. If a holiday falls on a scheduled service day, the Contractor will be responsible for rescheduling services for the first day post the holiday observance.

430. FACILITY CLOSURES. Work scheduled but not accomplished because of facility closure due to weather, or actual alert, will be accomplished as soon as possible after reopening the facility.

440. CONDUCT. All work under this contract shall be performed in a skillful and professional manner. The Contractor shall be responsible for maintaining satisfactory standards of employee competency, conduct, appearance and integrity, and shall be responsible for taking such disciplinary action with respect to the employee (s) as may be necessary. The Contractor shall prohibit his/her employees from disturbing papers on desks, opening desk drawers or cabinets, or using telephones or office equipment provided for official Government use. The Contracting Officer may, in writing, require the Contractor to remove from the work any employee the Contracting Officer deems incompetent, careless, or otherwise objectionable, for theft, possession and/or removal of materials, supplies, equipment, or any Government-owned property. Contractor personnel may not smoke on Government premises. Contractor personnel may not use any Government telephone without prior approval of the COR.

450. SAFETY. The Contractor shall display the appropriate caution signs when cleaning floors or any other surface that might pose a risk to injury for any personnel that are present. Any fire hazards, conditions, and items in need of repair shall be reported to the COR immediately.

460. PHYSICAL SECURITY. The contractor shall be responsible for securing premises upon completion of each service. The Contractor shall ensure that all lights shall be turned off after each room or area has been serviced (unless occupied). Water faucets or valves shall be turned off after the required usage has been accomplished. Mechanical equipment controls for heating, ventilation, and air-conditioning system will not be adjusted by the cleaning crew worker(s).

The facility is not to be left unsecured at any time, including the period when work is being performed. All unnecessary lights are to be turned off. When contractor does stripping and waxing a Government representative will be on site for security purposes.

470. SIGNING IN/OUT. On a daily basis, Contractor will be required to sign in and out to obtain and return any necessary keys to interior offices. Log in-out sheet will be provided by the Government.

480. LOST/FOUND ARTICLES. Turn in lost and found articles to the COR noting where and when found.

490. INTERRUPT OR DELAY OF PERFORMANCE. The Contractor shall notify the COR of any conditions that may interrupt or delay performance under this PWS such as locked offices/facilities, occupied rooms, adverse weather condition, and/or any other conditions.

Refusal of entry by tenant shall be documented and excuses Contractor from servicing that area for that cleaning cycle only. Repeated refusal should be brought to the attention of Facility Manager.

500. INSPECTION AND ACCEPTANCE. Inspection of work performed under this contract will be made by the Contracting Officer’s Representative or the designated inspector as the work progresses at such intervals as are necessary to insure compliance with the contract specifications and provisions. Upon completion of the work, the COR shall make an overall inspection of the work completed. If the work is not accepted by the COR, the contractor shall complete any remedial work required for acceptance.

501. Inspection Methods.

501-1. After Service. This method requires the COR to inspect the service each time it occurs. Any deficiency shall be documented and the contractor shall re-perform the service, if appropriate, at no increase in contract amount.

501-2. Periodic Inspections. This method requires the COR to employ a “spot check” style of evaluation based on the contractor’s cleaning schedule. Any deficiency shall be documented and the contractor shall re-perform the service, if appropriate, at no increase in contract amount.

501-3. Customer Complaints. The COR will receive and investigate complaints. The COR shall be responsible for initially validating customer complaint. The Contracting Officer shall make the final determination of the validity of customer complaint(s) in cases of disagreement with the COR and the contractor. Any validated customer complaint shall be documented and the contractor shall re-perform the service, if appropriate, at no increase in contract amount.

502. Performance Evaluation Meeting. The Contractor may be required to meet with the CO or COR during the first month of the contract. Meetings shall be as often as necessary thereafter as determined by either party. The meetings shall focus on Contractor’s performance and actual or potential problems. A mutual good faith effort shall be made by all parties to resolve all issues. The written minutes of these meetings shall be signed by the parties to the discussion. Should the Contractor not concur with the minutes, the Contractor shall so state any areas of non-concurrence in writing to the Contracting Officer within seven work days of receipt of the minutes.

600. CLEANING.

601. Cleaning Schedule. See Appendix A for cleaning schedule. Weekly cleaning schedule will apply to all entrances, reception area, hallways, offices, conference room, restrooms, and common areas. Dust horizontal surfaces of desks, credenza's, tables, filing cabinets, etc.

610. FLOOR MAINTENANCE.

611. General. For all operations where furniture and equipment must be moved, no chairs, wastepaper baskets or other similar items shall be stacked on desks, tables or window sills.

Upon completion of work, all furniture and equipment must be returned to its original position.

611-1. Baseboards, walls, stair risers, furniture and equipment shall not be splashed, disfigured or damaged during these operations.

611-2. All tools and equipment shall be neatly stored in the assigned storage areas. All waxed surfaces must be maintained so as to provide safe anti-slip walking conditions.

612. Sweeping and Damp Mopping. After sweeping and damp mopping operations, all floors shall be clean and free of dirt streaks; no dirt shall be left in corners, behind doors, or stair landing treads. Entrances and other assigned areas shall be swept clean of all dirt and trash. No dirt shall be left where sweepings were picked up. There shall be no dirt, trash or foreign matter under desks, tables, or chairs.

613. Wet Mopping and Scrubbing. The floors shall be thoroughly swept to remove visible dirt and debris; remove wads of gum, tar and similar substances from the floor surface. On completion of the mopping and scrubbing, the floors shall be clean and free of dirt, water streaks, mop marks, string, etc.; properly rinsed, and dry-mopped to present an overall appearance of cleanliness. All surfaces shall be dry and corners and cracks clean after the wet mopping or scrubbing. When scrubbing is designated, it shall be performed by machine or by hand with a brush.

614. Floor Finishing. The job of floor finishing includes the cleaning and applying of finish to vinyl, linoleum, parquet and ceramic tile floor surfaces.

614-1. Sweeping. Sweep floors thoroughly. Remove all gum and adhesive materials.

614-2. Stripping. Remove all old finish or wax from floors, using a concentrated solution of a liquid cleaner. Cleaner is to be applied with a mop, and scrubbed with an electrical polishing machine with scrub brush or a medium grade scrubbing pad. Extremely stubborn spots, gum, rust, burns, etc., shall be removed by hand with a scouring pad dipped in the cleaning solution. Corners and other areas that the polishing machine cannot reach shall be scrubbed and thoroughly cleaned by hand. Care shall be exercised so that baseboards, walls, and furniture shall not be splashed or marred. Cleaning solution shall be taken up with a mop or a water pickup and the floor rinsed twice with clean water to remove all traces of cleaning solution. Do not use excessive amounts of water; use only enough water as required for good rinsing. The Contracting Officer’s Representative shall be notified at least one (1) day prior to and after completion of all waxing.

614-3. Finishing. Apply a minimum of three coats of floor finish, allowing sufficient drying time between each coat. The last coat only should be applied up to but not touching the baseboard. All other coats should be applied to within four inches of the baseboard.

NOTE: Should there be more than eight hours delay before applying finish after the floor has been cleaned or between coats, the areas must again be cleaned to remove surface dirt and scuff marks before applying finish.

614-4. Periodic Spray Buffing. Sweep floor thoroughly. Use a damp mop to remove any spillages. Spray buff floor, using floor polishing machine, synthetic fiber pad and spray equipment containing 50% water and 50% floor finish of the same type as on the floor.

620. MISCELLANEOUS (as applicable):

621. Carpet. After each thorough vacuuming, all carpet shall be clean, free from dust balls, dirt and other debris.

622. Parquet Floors. Two-step process – (1) Dust with treated mop. (2) Wet mop using wax as per contract.

623. Elevator Floors (non-applicable).

624. Ceramic Tile Flooring. (Foyer): Two-step process – (1) vacuum total floor area. (2) Mop with solution approved by COR.

625. Toilets. Special attention shall be given to floors around urinals and commodes for elimination of odors and stains and to provide a uniformly clean appearance throughout.

626. Drinking fountains. Thoroughly clean and sanitize all nozzles, drain plates, and excess flow receptor. Remove all standing liquids, keep free of trash, ink, coffee grounds, stains, etc., and nozzles and drains free from encrustation.

630. DUSTING. Dust shall be removed directly from the areas on which it lays by the most effective means – appropriately treated dusting cloths, vacuum tools, etc. The following conditions shall exist after the completion of each dusting task:

631. There shall be no dust streaks.

632. Corners, crevices, molding, and ledges shall be free of all dust.

633. There shall be no oils, spots, or smudges on dusted surfaces caused by dusting tools.

640. DAMP WASHING. This task consists of using a clean damp cloth or sponge to remove all dirt, spots, streaks, and smudges from walls, glass, and other specified surfaces and then drying to provide a polished appearance. The wetting solution shall contain an appropriate cleaning agent. When damp wiping in toilet areas, a multi-purpose (disinfectant-deodorizer) cleaner shall be used.

650. BRIGHT METAL POLISHING. Bright metal polishing may be performed by damp-wiping with a suitable cloth if a polished appearance is obtained. However, if a polished appearance cannot be produced, the Contracting Officer’s Representative shall be contacted for direction as to the use of an appropriate metal polish.

660. GLASS CLEANING. After each washing operation, all glass shall be clean and free of dirt, grime, streaks, excessive moisture and cloudiness.

661. Window sashes, sills, woodwork about interior glass and other surroundings shall be thoroughly wiped free of drippings and other watermarks.

662. Cleaners shall use pads to protect window sills when standing on or placing cleaning materials on them. All such pads and/or cloths necessary to protect Government property shall be furnished by the contractor.

663. Windows which require cleaning on both sides will have the inside and outside cleaning performed on the same day.

670. PORCELAIN WARE CLEANING. Porcelain fixtures (drinking fountains, washbasins, urinals, toilets, etc.) shall be clean and bright; with no dust, spots, stains, rust, green mold, encrustation, or excess moisture.

671. Walls and floors adjacent to fixtures shall be free of spots, drippings, and watermarks.

680. SPOT CLEANING. Following this cleaning operation, smudges, marks, or spots shall have been removed from the designated areas without causing unsightly discoloration.

690. RESTROOM CLEANING AND SERVICING. Restroom cleaning shall consist of emptying trash receptacles and replace with plastic liner, sweeping floors, damp wiping towel dispensers, towel trash receptacles, mirrors, and doors, cleaning washbasins, water closets, showers and urinals; and mop entire floor area with a pine oil type disinfectant. It also shall include checking and replenishing towels, toilet tissue, and soap dispensers. Wall surfaces and stall partitions are to be spot-wiped weekly. Toilet servicing is defined as checking and filling dispenser for towels, toilet tissues and soap with Government-furnished towels, toilet tissues and soap. Wash toilet seats, check under lips of bowls and urinals and shower stalls for scale deposits, and clean thoroughly. Dilution of liquid hand soap product is not allowed. Remove all trash to the trash dumpster.

691. Tile grout (floors and walls) are to be scrubbed, mechanical or hand, in order to clean grout.

Solution will be provided by contractor and approved by Contracting Officer’s Representative.

692. Door handles, partition handles, and light switches are to be cleaned and disinfected daily.

Walls and partitions are to be spot cleaned daily to remove smudges and graffiti.

693. Restroom Supplies. Contractor shall ensure restrooms are stocked sufficiently so any provided supplies including toilet tissue, paper towels, and hand soap do not run out. Supplies shall be stored in designated areas provided by COR. Extra paper supplies may only be left out at the discretion of the COR.

700. MISCELLANEOUS. Other tasks shall be performed as indicated.

701. Carpet

701-1. Bonnet Cleaning 701-2. Extraction

702. Hard Surface Floors

702-1. Burnishing 702-2. Top Scrub and Refinish (Wax) 702-3. Strip and Wax

703. Contractor will ensure that their vacuum cleaner and buffers are in working order at all times. Wet mop head will be replaced every three months. Wet mop head will be washed out and hung up to dry daily on outside facilities.

704. Contractor will ensure adequately trained personnel are available to take over for periods of absence due to vacation and sick leave.

705. Waste baskets will be emptied and wiped clean weekly.

706. Outside trash dumpster doors shall be closed after use. Any debris dropped between building and dumpsters shall be picked up by Contractor Personnel.

APPENDIX A - Custodial Service Workload Standards

Cleaning shall be performed once a week (weekly) at the Bradley Work Center. All cleaning shall be completed on Tuesday of that week. If a holiday falls on that Tuesday, the work shall be completed the Monday before the holiday.

Quarterly services (i.e. scrubbing/stripping of the floors) shall be performed initially when the base period begins in October 2019. The remaining 2 quarterly services will be performed January 2020 and April 2020. For the option periods, quarterly services will be performed in June, September, December and March.

Services that are to be performed three (3) times a year (i.e. shampoo carpet) shall be performed initially when the base period begins in October 2019. The remaining service will be performed February 2020. For the option periods, these services will be performed in June, October, and February.

CUSTODIAL SERVICES WORKLOAD STANDARDS

Bradley Work Center

Main Office Building

SWEEP FLOORS Weekly MOP FLOORS Weekly BUFF FLOORS Weekly SCRUB/STRIP FLOORS AND RECOAT 4 x Year VACUUM CARPET Weekly SHAMPOO CARPET 3 x Year CLEAN WALK-OFF MATS Weekly

TRASH COLLECTION/REMOVAL

(Centralized Locations) Weekly

REST ROOMS (All tasks/services) Weekly

- RESUPPLY REST ROOMS

- CLEAN DRINKING FOUNTAIN

- CLEAN WALLS/PARTITIONS

- SWEEP/DAMP MOP FLOORS

- CLEAN/DISINFECT REST ROOMS

- DESCALE TOILETS & URINALS

- REMOVE TRASH

CLEAN INTERIOR WINDOWS As needed/but no less than twice monthly

DUST SURFACES, DISPLAYS, AND

COUNTERS Weekly

KITCHEN AREA (FLOORS,

APPLIANCES, AND ALL SURFACES) Weekly

APPENDIX B - Custodial Service Workload Standards

Cleaning shall be performed once a week (weekly) at the Plum Branch Work Center. All cleaning shall be completed on either Friday or Monday of that week. If a holiday falls on Friday, the work shall be completed the Thursday before the holiday. If the holiday falls on a Monday, the work shall be completed on the Tuesday after the holiday.

Quarterly services (i.e. scrubbing/stripping of the floors) shall be performed initially when the base period begins in October 2019. The remaining 2 quarterly services will be performed January 2020 and April 2020. For the option periods, quarterly services will be performed in June, September, December and March.

Services that are to be performed three (3) times a year (i.e. shampoo carpet) shall be performed initially when the base period begins in October 2019. The remaining service will be performed February 2020. For the option periods, these services will be performed in June, October, and February.

CUSTODIAL SERVICES WORKLOAD STANDARDS

Plum Branch Work Center

Main Office Building and Annex

SWEEP FLOORS Weekly MOP FLOORS Weekly BUFF FLOORS Weekly SCRUB/STRIP FLOORS AND RECOAT 4 x Year VACUUM CARPET Weekly SHAMPOO CARPET 3 x Year CLEAN WALK-OFF MATS Weekly

TRASH COLLECTION/REMOVAL

(Centralized Locations) Weekly

REST ROOMS (All tasks/services) Weekly

- RESUPPLY REST ROOMS

- CLEAN DRINKING FOUNTAIN

- CLEAN WALLS/PARTITIONS

- SWEEP/DAMP MOP FLOORS

- CLEAN/DISINFECT REST ROOMS

- DESCALE TOILETS & URINALS

- REMOVE TRASH

CLEAN INTERIOR WINDOWS As needed/but no less than twice monthly

DUST SURFACES, DISPLAYS, AND

COUNTERS Weekly

KITCHEN AREA (FLOORS,

APPLIANCES, AND ALL SURFACES) Weekly

APPENDIX C - Estimated Square Footages and Cleaning Level for Bradley

There are two buildings with a gross occupancy square footage of 1000 feet to be cleaned. The main office building is a two-story structure with two (2) entrance, four (4) offices, and one (1) restroom with shower. The “Annex” building is a one-story structure with one (1) entrance, one

(1) office, and two (2) restrooms. Approximately five (5) individuals work in the one building.

APPENDIX D - Estimated Square Footages and Cleaning Level for Plum Branch

There are two buildings with a gross occupancy square footage of 600 feet to be cleaned. The main office building is a one-story structure with one (1) entrance, one (1) office, and two (2) restrooms with showers. The “Annex” building is a one-story structure with one (1) entrance, one (1) office, and one (1) restroom. Approximately 3 individuals work in the two (2) buildings.

File details come from the government source that posted it. Updated .