This is a Questions and Answers document for Solicitation 12444027Q0005 for janitorial services at the Homochitto Ranger District Office and Bude Work Center in Louisiana. The solicitation is issued by the USDA Forest Service and has a submission deadline of November 12, 2026, at 9:00 AM Eastern Time. Offerors must submit completed SF-1449, Schedule of Items, Past Performance Questionnaire (Attachment C04_04), and a dated quote with UEI via email to richard.kandrach@usda.gov with copies to marilyn.etheridge@usda.gov and stephanie.laruffa@usda.gov in standard PDF format. The performance start date is December 1, 2026, and all NACI background clearances must be completed before work begins; no interim key access is available while investigations are pending.

The contract is for weekly janitorial services at both facilities, including vacuuming, sweeping, mopping, cleaning restrooms (2-3 toilets per restroom), taking out garbage, and wiping down kitchenette areas and microwaves. Services may be performed after 5:00 PM and any hours on weekends. The contractor must transport all supplies and equipment off-site after each cleaning as no on-site storage is available. Each year's cost on the Schedule of Items represents a firm fixed price for all weekly services at both locations; all five contract periods must be priced with a total at the bottom. Contractors are permitted to subcontract, including using subcontractors for most or all onsite cleaning tasks, and subcontractor past performance will be considered in evaluation. The solicitation includes FAR 52.222-62 (EO 13706 Paid Sick Leave), and contractors must adhere to all federal, state, and local laws regarding insurance. Contractors will receive a 24-48 hour cure/rework window to correct first-time non-recurring deficiencies before daily rate deductions are assessed. This is a new requirement with no incumbent contractor.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Janitorial Services, Homochitto Ranger District LA Q&A

Solicitation 12444027Q0005 – the most current version will be posted and supersede the prior Q&A

Question 1 - Fri 11/6/2026 02:29AM Q1: Hours of Operation & Permissible Working Window (PWS Para 4 vs. Para 14.B): PWS Paragraph 4 establishes normal business hours as Monday through Friday from 6:00 AM to 5:00 PM CT (requiring service outside these hours), whereas PWS Paragraph 14.B references normal business hours as 0730–1600. Could the Government confirm the exact permitted time window during which janitorial staff may access both facilities (Homochitto Ranger District Office and Bude Work Center) during weekday evenings and over weekends?

A1: Yes they can work after office hours. Example after 5:00 pm and also can work any hours on the weekends.

Q2: Supply & Equipment On-Site Storage (PWS Para 11 vs. Para 14.A): PWS Paragraph 11 states that the Government will not provide space/storage for contractor materials or equipment. Conversely, PWS Paragraph 14.A specifies rules for keeping janitor closets clean and properly storing chemicals/combustibles. Please clarify whether secured janitor closets are available on-site at both locations for staging non-combustible cleaning tools and biobased products between weekly service visits, or if all equipment and supplies must be transported off-site after each cleaning.

A2: There is no supply closet for them for supplies or equipment available. All supplies and equipment will need to be transported off-site after each cleaning.

Q3: Background Clearance Processing & Performance Start Date (PWS Para 9 & 14.B): PWS Paragraph 9 notes that interim keys and entry codes will be issued during the period between starting work and receiving an adjudicated NACI background investigation / Lincpass credential. Please confirm whether contractor personnel may commence work on the December 1, 2026 performance start date under interim key authorization once initial identity proofing documentation is submitted, pending final NACI adjudication.

A3: No. All clearance will need to be done and completed before work begins.

Q4: Deficiency Rework Opportunities vs. Invoice Deductions (PWS Para 23.6, 24, & 26.1): PWS Paragraph 24 indicates that nonconforming work is generally not subject to re-performance and will result in direct price deductions. However, PWS Paragraphs

23.6 and 26.1 state that the COR may afford the contractor an opportunity to rework deficient areas within two days of notification.

Will contractors be granted a mandatory 24- to 48-hour cure/rework window to correct first-time non-recurring deficiencies prior to the assessment of daily rate deductions?

A4: Yes, we will allow a 24-48 hour cure/rework to correct first-time non-recurring deficiencies prior to assessment of daily rate deductions.

Q5: Biobased Product Approval & Proposal Submission Requirements (PWS Para 5 & 20.4): PWS Paragraph 20.4 lists post-award submittal requirements, including a proposed biobased product list, SDS/MSDS sheets, and Product Use Guides. Please confirm whether these product submittals are required strictly post-award prior to work commencement, or if a preliminary chemical/SDS list must be included directly within the initial quotation package due on November 12, 2026.

A5: preliminary, submit with your offer

Q6: Past Performance Questionnaire Submission Protocol (Attachment C04_04): Regarding Attachment C04_04 (Experience Questionnaire), please clarify whether offerors should complete and submit the form directly within their offer package, or if reference evaluators must submit completed questionnaires directly to the Contracting Office via email prior to the closing deadline.

A6: submit with your offer

Q7: Incumbent Contractor: Could you please confirm whether there is a current incumbent for this contract? If so, we would appreciate it if you could share the associated Purchase Order number and the total contract value.

A7: this is a new requirement

Question 2 - Fri 11/6/2026 04:13AM Q1: Offer submission: please confirm the exact email address(es) and any file-format limits for submitting the complete offer (SF- 1449, completed Schedule of Items, Past Performance Questionnaire, and dated quote with UEI).

A1: TO: richard.kandrach@usda.gov & CC: marilyn.etheridge@usda.gov & stephanie.laruffa@usda.gov submit in standard PDF

Q2: Due date: SF-1449 Block 8 and SAM.gov list 11/12/2026 0900 ET, but the Schedule of Items page appears to reference 11/05/2026 0900 ET. Please confirm the controlling due date and time zone.

A2: the correct due date is on the SF1449 11/12/2026 0900 AM ET

Q3: Is there a questions cutoff earlier than the offer due date?

A3: Prior to deadline mailto:richard.kandrach@usda.gov mailto:marilyn.etheridge@usda.gov mailto:stephanie.laruffa@usda.gov

Q4: May we schedule a brief walkthrough of the Homochitto Ranger District Office and the Bude Work Center before the due date?

If so, who should we contact?

A4: marilyn.etheridge@usda.gov 601-384-5876 ext 167

Q5: FAR 52.222-62 (EO 13706 Paid Sick Leave) appears unchecked. Please confirm whether it applies, and which Health & Welfare rate from WD 2015-5173 to use for pricing.

A5: yes it applies, this was not checked in error

Q6: Please confirm each year's COST cell on the Schedule of Items is a firm fixed price for all weekly services at both buildings for that period, and that all five periods must be priced.

A6: each cell on the Schedule of Items is a dollar value per year for both work locations at firm-fixed-price and yes they must be priced with a total at the bottom

Q7: Is interim access (key/code) available so performance can start around December 1, 2026 while NACI investigations are pending?

A7: No all investigations need to be completed before work can begin or we hand out any keys or codes.

Q8: Are there minimum insurance limits we should plan for at award (general liability, workers' compensation, auto)?

A8: adhere to federal, state, local laws and regulations

Question 3 - Fri 11/6/2026 06:09AM Q1: Please confirm the email address(es) to which quotations should be submitted by November 12, 2026, 9:00 AM ET A1: TO: richard.kandrach@usda.gov & CC: marilyn.etheridge@usda.gov & stephanie.laruffa@usda.gov

Q2: FAR 52.219-14 appears with an unchecked box in the clause list. Please confirm no limitations-on-subcontracting clause or self-performance percentage applies to this acquisition. Relatedly, which health and welfare rate applies — $5.92, or the EO 13706 rate of $5.42?

A2: An unchecked box or unchecked status for FAR 52.219-14 (Limitations on Subcontracting) in a solicitation's clause checklist generally means that the clause does not apply to that specific contract or opportunity

Q3: May the Past Performance Experience Questionnaire include relevant projects performed by our proposed janitorial subcontractor, and will subcontractor past performance be considered in the evaluation?

A3: yes, include past performance

Question 4 - Fri 11/6/2026 12:48PM

Q1: Is this prime/subcontractor performance arrangement permitted under this solicitation, including use of a subcontractor for most or all onsite cleaning tasks?

A1: yes it is

Q2: Does FAR 52.219-14 (Limitations on Subcontracting), or any applicable deviation or other subcontracting restriction, apply? If so, how should we apply the requirement to this contract?

A2: can subcontract

Q3: If a limitation applies, may a similarly situated small-business subcontractor perform onsite cleaning, and what specific small-business status would make a subcontractor similarly situated for this set-aside?

A3: yes

Q4: Must the prime contractor provide its own onsite cleaning staff or onsite supervisor, or may the subcontractor supply these personnel under B Clean’s oversight?

A4: up to Small Business vendor that wins this award.

Question 5 - Mon 11/09/2026 @ 03:00AM Q1: Please send the Performance Requirements Standards Summary Tables (daily, bi-weekly, weekly, monthly, semi-annual, annual) referenced in PWS paragraph 24. Are any periodic tasks beyond the weekly list required?

A1: Weekly & all documents located at: https://sam.gov/workspace/contract/opp/00c5dd423425455caa5222c1b215f7b9/view mailto:marilyn.etheridge@usda.gov mailto:richard.kandrach@usda.gov mailto:marilyn.etheridge@usda.gov mailto:stephanie.laruffa@usda.gov https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.acquisition.gov%2Ffar%2F52.219-14&data=05%7C02%7CRichard.Kandrach%40usda.gov%7C2bcbe5d836b247e08a5508df3c2e6d2a%7Ced5b36e701ee4ebc867ee03cfa0d4697%7C1%7C0%7C639295842235651892%7CUnknown%7CTWFpbGZsb3d8eyJFbXB0eU1hcGkiOnRydWUsIlYiOiIwLjAuMDAwMCIsIlAiOiJXaW4zMiIsIkFOIjoiTWFpbCIsIldUIjoyfQ%3D%3D%7C0%7C%7C%7C&sdata=0OfSF1iVvhB9h1SaO%2FmtYV0ysVxHkDH0GDWsAjfXha0%3D&reserved=0

Q2: How many restrooms are in each building, and about how many square feet are carpet versus hard floor?

A2: 2 or 3 toilets in each restroom

Q3: How should the quote be submitted (email address or portal), and what is the questions deadline?

A3: richard.kandrach@usda.gov NLT 11/12/2026 by 0900hrs AM ET

Q4: The SOI shows solicitation dates 10/30 to 11/5. Please confirm the due date is Thursday, 11/12 at 9:00 AM Eastern.

A4: 11/12/2026 NLT 0900hrs AM ET

Q5: Is a site visit available? Who is the current contractor, and what is the current monthly price?

A5: This is a new requirement & contact marilyn.etheridge@usda.gov for a site visit

Question 6 - Mon 11/9/2026 05:26 AM

Q1: Cleaning hours: Is there an update on the permitted cleaning window at both buildings? The PWS lists business hours as both 6:00 a.m.–5:00 p.m. and 7:30 a.m.–4:00 p.m. Central. Would evening or weekend cleaning be acceptable?

A1: Yes they can work after office hours. Example after 5:00 pm and also can work any hours on the weekends.

Q2: Supply storage: Is there an update on whether a secure janitor closet is available at either location, or should we plan to remove all equipment and cleaning supplies after each visit?

A2: There is no supply closet for them for supplies or equipment available. All supplies and equipment will need to be transported off-site after each cleaning.

Q3: Background checks and start date: Can staff begin work on December 1 using interim keys/access codes while their background investigations are pending? What steps must be completed before interim access is approved?

A3: all investigations need to be completed before work can begin or we hand out any keys or codes.

Q4: Additional cleaning tasks: We understand the scheduled service is once weekly at each building. Section 24 also references daily, monthly, semiannual, and annual performance summary tables. Are there additional periodic tasks beyond the weekly task list, such as carpet extraction, floor stripping/waxing, or window washing? If so, could you provide the applicable task and frequency tables?

A4: There is no additional cleaning tasks. Just vacuuming, sweeping, mopping, cleaning bathrooms, taking up garbage and disposing of it in the correct trash bins and wiping down kitchenette area and microwave. Basic cleaning. No waxing or stripping, no window washing. Just a weekly cleaning.

Q5: Rework and deductions: Could you clarify when a contractor may correct a deficiency before a deduction is applied? Also, Section 26 lists deduction categories totaling 110%. What percentages and calculation method should apply to this weekly service?

A5: Yes, we will allow a 24-48 hour cure/rework to correct first-time non-recurring deficiencies prior to assessment of daily rate deductions.