Q and A Bolar Flat Courtesy Dock and Gangway Repair.docx

DOCX document 295 KB Posted

Attached to
Warm Springs Ranger District-Bolar Flat Courtesy Dock and Gangway Repair
Solicitation number
12443923Q0027
Issued by

View the file

Other files

File Type Posted
A-2 Wage Determination.pdf PDF
12443923Q0027.pdf PDF
A-1 GovtProvidedTechnicalProposalForms.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bolar Flat Courtesy Dock and Gangway Repair Questions and Answers from Pre-Bid Meeting - Wednesday, April 19, 2023

Q- How much does the lake level fluctuate?

A- About 20-25’ annually

Q- Is there any known damage to the collapsed gangway section?

A- A diver that did an inspection last year said that there was a bent joint where the wheels attach at the end of the gangway. In addition a bent steel member at the beginning of the collapsed gangway section was observed during the pre-bid meeting.

Q- How much of the concrete decking on the collapsed gangway section is damaged?

A- Unknown. Assume for the sake of a proposal that a quarter of the concrete deck panels will need to be repaired or replaced.

Q- Is there someplace on site to keep the gangway while repairing?

A- Yes

Q- Does the Corps of Engineers notify when they are releasing water from the dam?

A- They typically put out general notification of May and June pulse dates but not if pulsing is needed after that image1.jpeg