This is a Questions and Answers document from the USDA Forest Service addressing inquiries from potential bidders on a Job Corps facility electrical project.
The acquisition is structured as a Total Small Business Set-Aside under NAICS Code 238210 with a small business size standard of $19 million. All responsible sources may submit quotations. Key project requirements include demolition and replacement of transformers, with the contractor bearing replacement costs while coordinating with Bristol, Tennessee Essential Services (BTS) utility company. An existing pole-mounted overhead transformer near the gym will be removed per electrical drawings (Sub Sheet ED102, Note D2), with the pole remaining to route utility service to a new upsized pad-mounted transformer. Bidders must reference FAR 52.225-9 regarding Buy American construction material requirements and must bid only items as specified in the Statement of Work and Plans/Drawings without additions or substitutions. Coordination requirements are detailed in SOW Section 1.04 Administrative Requirements, Part B, with BTS identified as the utility company representative for all necessary coordination activities.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Item Question USDA FS Response
1 Who is allowed to bid on this project?
The applicable North American Industry Classification Standard Code is 238210 The small business size standard is $19 million This acquisition is a Total Small Business Set-Aside.
All responsible sources may submit a quotation which will be considered by the agency.
2 The drawings show us to demo the transformer but that is usually done by the utility.
The transformer is owned by the Job Corps – you can work with the utility for the replacement, but the costs would be the responsibility of the contractor for that replacement.
Please refer to the Specifications/SOW 1.04 Administrative Requirements, B: Coordination -for items that will need to be coordinated Utility Company representative BTS (Bristol, Tennessee Essential Services)
3 The pole near the gym has an overhead transformer for the new size, is that staying or going?
See plans/drawings On Sub Sheet ED102 – Note D2 – Coordinate with electrical power company to remove existing pole mounted transformer. Pole to remain to route utility service to new upsized pad mounted transformer to be supplied. Sub Sheet E-102 – Coordinate with Utility to Provide primary down existing pole to new pad mounted transformer. Please refer to the Specifications/SOW 1.04 Administrative Requirements, B: Coordination - for items that will need to be coordinated Utility Company representative BTS (Bristol, Tennessee Essential Services)
4 The person on site is wanting an ATS at the cafeteria, is that being considered? No, bid items as listed in the SOW and Plans/Drawings.
5 The specs have checked for Buy America but we don’t have a sheet showing requirements, how do we proceed? Please refer to FAR 52.225-9 Buy American-Construction Materials
6 The person at the facility said the Gym generator has never been used and to mention that before we priced a new one. Bid items as listed in the SOW and Plans/Drawings.
Sheet1