Att 1_Group 5 Schedule of Items 2023revised.pdf
PDF 165 KB Posted
- Attached to
- 12441923Q0078 - RFCA Pre Demolition Abatement
- Solicitation number
- 12441923Q0078
- Issued by
-
Department of Agriculture Forest Service
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A06_RFQ_12441923Q0078v2_Updated5262023.pdf | ||
| Midewin Site Visit QA_Final.pdf | ||
| Midewin Site Visit sign-in.pdf | ||
| A06_RFQ_12441923Q0078 v1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Midewin National Tallgrass Prairie May 30, 2023
Group 5 Pre-Demolition Abatement Page 1 of 2
PART I - THE SCHEDULE
SECTION A –ITEMS
Pre-Demolition Abatement Contract
Group 5
SUMMARY SCHEDULE OF ITEMS
Item No./Title Description Qty Total Cost
1. Asbestos Analysis/Certification
Provide ACM inspection performed and signed by an Illinois Licensed ACM inspector to satisfy State of Illinois requirements prior to demolition.
1 (includes 18 buildings plus walkways)
2. Abatement of special waste materials from buildings in Group 5 in preparation for demolition
Remove and dispose/recycle off-site :
ACM ROOFING, SIDING,
FLOOR TILE and other ACM identified by the inspection in line item 1. Also include all PCB ballasts, fluorescent and mercury bulbs. Remove, Recycle and or dispose all misc. debris in and around buildings as needed in order to complete hazardous material disposal.
Footprint of 18 buildings total approx. 27,222 square feet PLUS 750 linear feet of transite covered walkways
GRAND TOTAL
Detailed breakdown of Item 2 above.
GROUP 5
Building Footprint
SQFT
Comments TOTAL cost
5-1 Fulminate Service Magazine 183 -
5-2 Fulminate Heater House 183 -
5-3 Fulminate Dry House 304 -
5-4 Fulminate Screen & Blend 1,831 Additional transite wall around perimeter
Midewin National Tallgrass Prairie May 30, 2023
Group 5 Pre-Demolition Abatement Page 2 of 2
5-5 Primer Loading 5,286 Interior transite ceiling
5-6 Delay Loading 4,354 Interior transite ceiling
5-7 Powerhouse 1,452 1.5 story height
5-8 Change House 7,534 Partial floor tile
5-10 Black Powder Dry House 304 -
5-11 Black Powder Htr House 183 -
5-12 Black Powder Service Mag 183 -
5-13 Primer Dry House 808 -
5-16 Jumble & Jolt Fuse Test 1,087 -
5-20 Change House 1,560 -
5-29 B Clock house 200 -
5-30 Vacuum Pump Houses (5 each) 32 -
5-31 Booster Storage Magazine 582 -
5-32 Unloading Ramp & Deck 0.00
Building 5-32 can be deleted, no special wastes have been identified there.
NOT IN
CONTRACT
750 Lin. Ft.
Covered Walkways - While some are full 3-sided transite walkways, others are a single wall beneath the roof overhang at the perimeter of the building (such as Building 5-6), still others have transite roofs with metal panel side walls. All transite is to be removed and costs are to be included in either the walkway item or with the building adjacent to the walkway, but not both. 4,500
Typically ,2 walls and roof are transite
All Structures
TOTAL FOOTPRINT
SQUARE FOOTAGE 30,694