Att 1_Group 5 Schedule of Items 2023revised.pdf

PDF 165 KB Posted

Attached to
12441923Q0078 - RFCA Pre Demolition Abatement
Solicitation number
12441923Q0078
Issued by

View the file

Other files

File Type Posted
A06_RFQ_12441923Q0078v2_Updated5262023.pdf PDF
Midewin Site Visit QA_Final.pdf PDF
Midewin Site Visit sign-in.pdf PDF
A06_RFQ_12441923Q0078 v1.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Midewin National Tallgrass Prairie May 30, 2023

Group 5 Pre-Demolition Abatement Page 1 of 2

PART I - THE SCHEDULE

SECTION A –ITEMS

Pre-Demolition Abatement Contract

Group 5

SUMMARY SCHEDULE OF ITEMS

Item No./Title Description Qty Total Cost

1. Asbestos Analysis/Certification

Provide ACM inspection performed and signed by an Illinois Licensed ACM inspector to satisfy State of Illinois requirements prior to demolition.

1 (includes 18 buildings plus walkways)

2. Abatement of special waste materials from buildings in Group 5 in preparation for demolition

Remove and dispose/recycle off-site :

ACM ROOFING, SIDING,

FLOOR TILE and other ACM identified by the inspection in line item 1. Also include all PCB ballasts, fluorescent and mercury bulbs. Remove, Recycle and or dispose all misc. debris in and around buildings as needed in order to complete hazardous material disposal.

Footprint of 18 buildings total approx. 27,222 square feet PLUS 750 linear feet of transite covered walkways

GRAND TOTAL

Detailed breakdown of Item 2 above.

GROUP 5

Building Footprint

SQFT

Comments TOTAL cost

5-1 Fulminate Service Magazine 183 -

5-2 Fulminate Heater House 183 -

5-3 Fulminate Dry House 304 -

5-4 Fulminate Screen & Blend 1,831 Additional transite wall around perimeter

Midewin National Tallgrass Prairie May 30, 2023

Group 5 Pre-Demolition Abatement Page 2 of 2

5-5 Primer Loading 5,286 Interior transite ceiling

5-6 Delay Loading 4,354 Interior transite ceiling

5-7 Powerhouse 1,452 1.5 story height

5-8 Change House 7,534 Partial floor tile

5-10 Black Powder Dry House 304 -

5-11 Black Powder Htr House 183 -

5-12 Black Powder Service Mag 183 -

5-13 Primer Dry House 808 -

5-16 Jumble & Jolt Fuse Test 1,087 -

5-20 Change House 1,560 -

5-29 B Clock house 200 -

5-30 Vacuum Pump Houses (5 each) 32 -

5-31 Booster Storage Magazine 582 -

5-32 Unloading Ramp & Deck 0.00

Building 5-32 can be deleted, no special wastes have been identified there.

NOT IN

CONTRACT

750 Lin. Ft.

Covered Walkways - While some are full 3-sided transite walkways, others are a single wall beneath the roof overhang at the perimeter of the building (such as Building 5-6), still others have transite roofs with metal panel side walls. All transite is to be removed and costs are to be included in either the walkway item or with the building adjacent to the walkway, but not both. 4,500

Typically ,2 walls and roof are transite

All Structures

TOTAL FOOTPRINT

SQUARE FOOTAGE 30,694