This document is a Performance Work Statement (PWS) for an epoxy flooring project at the US Forest Service's National Technology and Development Program (NTDP) facility in San Dimas, CA. The PWS outlines the requirement to replace approximately 1,100 sq ft of existing flooring in three office/work areas with epoxy flooring.
The contractor will be responsible for removing the existing flooring, sealing any cracks or imperfections, and applying epoxy flooring systems tailored for the intended use of each area. This includes a solid color system for an office, a decorative vinyl chip system for another office, and a slip-resistant pigmented system for a workspace area. The contractor must submit a project plan within 5 days of contract award and provide weekly status reports. The government will provide electricity, water, and sanitary facilities, and will inspect and evaluate the contractor's performance against the stated standards. The PWS is related to a Request for Quote (RFQ) solicitation for this epoxy flooring project.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Solicitation Questions With Answers.pdf | ||
| Epoxy Flooring RFQ.pdf | ||
| Attachment 2 Specifications.pdf | ||
| Attachment 3 Wage Determination_05242024.pdf | ||
| Attachment 4 Past Performance Questionnaire.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
US Department of Agriculture (USDA)
Performance Work Statement
Project Title San Dimas Epoxy Flooring Project
General Information
1.0 Background and Purpose
The US Forest Service's National Technology and Development Program (NTDP) facility, located in San Dimas, CA, has a requirement to replace approximately 1,100 sq ft of existing flooring with epoxy flooring as follows:
· T-10 carpeted office approx.34'x11'
· T-17 carpeted office approx.24'/4"x16'
· D-3 Pubs room concrete flooring approx. 16’/2”x18’/9”) converted to Epoxy flooring, transforming these rooms to Laboratories and work shops helping extend the facilities capacity for Research and Development.
2.0 Definitions
CO: Contracting Officer COR: Contracting Officer Representative CS: Contract Specialist TDP: National Technology & Development Program POC: Point of contact
Contractor Requirements
3.0 Technical Requirements / Tasks
· The contractors shall be responsible for the removal and cleanup of all old/existing floor covering as well as the sealing of any cracks or breaks and correction to any floor imperfections or deformities in preparation to Epoxy slurry applications. Along with all floors, all 3 areas will need Epoxy applications to be applied 6" up ALL perimeter walls as a cove base. All applications shall have a moisture mitigating primer as well as an application of moisture barrier.
· For Interior office space T-17, the contractor shall apply an application similar or equivalent to: a solid color, seamless flooring system consisting of 100% solids epoxy designed for coating industrial and commercial floors. A durable urethane topcoat ensures excellent wear characteristics, making it a great system for varying areas from light manufacturing to clean rooms. (Color: Grey) To be approved by the COR.
· For Interior office space T-10, the contractor shall apply an application similar or equivalent to: a seamless, decorative flooring system consisting of 100% solids epoxy body coats with decorative vinyl chip broadcasts. A durable urethane topcoat ensures excellent wear and chemical resistance. Available in standard and custom color blends in both micro and macro sizes. (Color: Oyster Shell) To be approved by the COR.
· For Interior office space D-3 the contractor shall apply an application similar or equivalent to: Shop Floor, a seamless, slip resistant pigmented flooring system consisting of 100% solids epoxy and natural quartz aggregates. Easy to maintain and durable, Shop Floor that is ideal for industrial flooring applications and features a chemical, UV, and wear resistant urethane topcoat. “This area will need to be to endure Heavy Equipment Traffic such as (“Skid steers, Forklifts, Pallet jacks, etc.”) (Color: Grey). To be approved by the COR.
4.0 Deliverable / Schedule
Key Deliverables Table
| Item No. |
| Deliverable |
| Objective |
| Due |
| 1 |
| Proposed Project Plan |
| Defining the responsibilities, timeline, risks and milestones of contract objectives. |
| No later than five (5) business days after contract award |
| 2 |
| Weekly Status Report |
| Report documenting tasks & issues weekly. |
| Weekly, every Thursday, by 3:00 PM PST until the contract expires |
5.0 Government Furnished
· Electricity (120V Outlets), water (On Site water Fountains), and sanitary facilities (1 Designated restroom, that contractor shall be responsible to clean up behind themselves after each use) at no cost to the contractor.
6.0 Travel
· To/From the work site, travel expenses are the responsibility of the contractor. No other travel is anticipated.
7.0 Contractor’s Key Personnel
· Experienced field personnel are expected. Contractor shall provide the name and contact of a on-site
POC.
8.0 Security Requirements
· All contractor personnel must sign in at the front desk and wear visible USDA Visitor Identification.
· Adhere to CDC guidelines for face coverings and other health and safety protocols.
· NTDP Center Access hours will be as follows: M-F 7:30A – 4:30P Excluding Holidays.
9.0 Performance Requirement Measures
· NTDP Center Access Hours will be as follows: M-F 07:30AM - 4:30PM, excluding holidays.
· The Government will measure the contractor’s performance for work critical to the mission essential items.
· Below is an example of Performance Requirement Measure and Surveillance:
| Performance Objective |
| Required Task or Deliverable |
| Performance Standard |
| Method of Surveillance |
| Positive/Negative Incentive |
% for NOT meeting the Task
Ensure Epoxy applications meet 3.0 of this contract’s standards for all 3 designated areas.
Ensure all Epoxy applications are properly layered to meet each locations intended use. Defining the responsibilities, timeline, risks and milestones of contract objectives No later than five (5) business days after contract award.
Report documenting tasks & issues weekly. Weekly, every Thursday, by 3:00 PM PST until the contract expires Epoxy application to be cured, clean, safe, sanitary and able to be fully utilized and be accessed by Government 45 days after contract award.
. 3= Average. 4= Above average. 5= Exceptional.
| Periodic inspections, review of logs, and monitoring reports by the COR or designated Government representative. A Timely submission of all respective do dates for all stated reporting. |
| Performance evaluations based on adherence to standards, with potential for contract renewal based on satisfactory performance. 1-5 table: 1= Unsatisfactory. 2= Below average. 3= Average. 4= Above average. 5= Exceptional. |