Attachment_2_-_IDIQ_Specification.pdf
PDF 548 KB Posted
- Solicitation number
- 12414619Q0009
About this file
ATTACHMENT 2 - IDIQ Contract Specification
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
12414619Q009 - Attachment 2
Specifications for Wildlife Opening Management – Mowing and Disking
Wildlife Opening Mowing Wildlife openings and access roads are to be mowed with a tractor and heavy duty mower, such as a bush hog. Wildlife Opening sizes vary between 0.5 and 12 acres.
Mowing shall be performed between October 1 and November 15 with all work completed no later than November 15 of each year.
Most of the openings are currently vegetated with shrubs and herbaceous vegetation, with some sapling trees. There may be downed trees in the openings or access roads, which will require pushing with a tractor or bucking up with a chainsaw and moving to the edge.
Disturbance of vegetation outside the area shall be minimized. Any standing timber outside the area shall not be disturbed. Movement of large amounts of soil will not be acceptable.
Access The contractor shall protect all trails, roads, ditches, fences and other improvements in the project area from any damage resulting from operations.
Roads and trails shall be kept free of logs, slash, and debris. Any road, trail, or structure used by the contractor that is damaged by their operation shall promptly be repaired by them. The contractor will clear downed trees and debris from the access road. This clearing may be accomplished with the tractor or chainsaws.
Debris and downed trees must be removed from the road and pushed to the side of the road. The contractor will mow the road into the wildlife opening.
Equipment Requirements Tractors must be equipped with Roll Over Protection System (ROPS). Tractors and implements must be washed and clean prior to moving onto Forest Service lands to prevent the spread of non-native invasive plants, such as Cogongrass.
Tractors and implements must be of sufficient size and horse power to conduct heavy duty mowing and disking of shrubs and small saplings.
Contractors are encouraged to visit the sites prior to submitting bids.
Note: The number of acres to be treated is contingent upon funding.
This is an Indefinite Delivery/Indefinite Quantity (IDIQ) Requirements contract for a base and 4 optional years. There is no guarantee for this contract. Acres treated will be dependent upon funding and treatment need/ground conditions each year.
Year 1 Mowing – approximately 60 acres*
Option Year 1, Option Year 2, Option Year 3 and Option Year 4 are Dependent upon funding, but each year is expected to be in the 40-70 acre range*
Maps of Bankhead Wildlife Openings are available at the District Office or upon request. Specific maps for each task order issued will be prepared for the successful bidder/contractor.
2B
8D
249A1
102G
204A
5F
254O
249O
107Q
L
0C108I
WI
NS
265B
104D
234WE
279D
101A
121B
148A
236G
254E
234A
103Q
249G
203D
A1
278J
263I
J
249F 274A
A275
213K
R
279A
105B
257B
103I
9B
262C
293B
3J
106A
5V
4C
119D
213D
202B
2G
254Q
255B2
107B
124C
3N
103D
262F
L
5B
3D
7B
269A
103C
279E 258A
236I
207A
240B
246D
237F
106D
124A6
J
255Y
2C
279F
265A
2B
255A1
V
5F
262N
109A9
124A1
147C
A1
207B
124F
245P
0E
8A
A2
254D
257I
245E
203A
A
257E
A
108C
254J
109P
A
P
WINS 327
126I
125C
258C
109C
223C
J4
109A3
252E
236A
258E
123A
124H
255G 210B
148C
108F
5G
265D
123I
268B
109E
5A
228A1
298A
135A5
3G
M
268E
8B
210D
5F
236B
108K1
205A
237A
3A
113H
109N
3A
118B
258F
5A
121C
6H
245T
264E 255I
124J3
107C
9V
229G
263J
245O
240A
F
265E
C
229C
D
K
235A 256A
E
8I
257G
247A2
G
269C
262K
9E
237G
124F4
264G
120B
202D
3H
249C
104A
210A
249F3
121G 125A
L
6D
5D
9A
121E
121K
125M
3F
104M
2C
255A3
128B
P1
G
213R
6L
135G 244A
6E
255D
125F
237K
142A
203F1
109B2
253E
269B
236D 279B
124J2
203C
246V 246P
D
269J
9L
262D
264B
262G
109A2
135D
3F
245M
213I
124B3
237D
142H
245R
264C
298B
B
F
121I
E
6C
B107P
125J
G
269I
249U
233B
8C
T
106B
3B
A
9L
109M1
9A
109K
3F
109G
R
244C
109O
6W
245U
G
135A
3D
0F
121L
249F2
268A1
107B1
213L
208Q
121A
7A
4A
121H
R1
236F
255S
102B
U
C2
WINS 14
108G
118A
7A
135E
228F
102I
124A3
3E
254K
255V
3V
148B
5B
5A
WINS 43
104D1
8C
124B
242A
B
M
202C
234X
FH 40
286A
WINS
8B
249B
234EA
8C
123G
C
5A
268A
262A
262J
H
B
WINS
WINS76
3F
221205
135C
254S
215G
WINS 56
239A
WINS15
9A
WI
NS
91 123 E
WINS
254A
229B
244B
109A
228N
246N
WINS
121D
WI
NS
B
FH 5
228B
FH
FH 4
FH 7
WINS 61
WINS 3149
SH 243
WI
NS
FH
208WEST
WINS 99
208EA
FRAN 38
WINS 24
WINS 63
FH 41
WINS 6
FH 9
WINS 29
WI
NS
WINS 4
FH 6
SH
WINS 25
SH 195
FH 2
FH 49
WI
NS
US 278
FH
Bankhead National Forest Wildlife Openings
Vicinity MapÜ
0 2.5 51.25 Miles
1:181,842
Legend BNF_WLO_sALL Wilderness BlkWarriorWMA BasicOwnership RangerDistrict jabc; 6/19
Sipsey Wilderness
Double Springs
| Attachment 2 - WLOMgmt_ContractSpecs_2019 V1 |
| Specifications for Wildlife Opening Management – Mowing and Disking |
| Wildlife Opening Mowing |
| Access |
WLO_AllOpenings_IDIQMap_6282019
File details come from the government source that posted it.