C05 Amendment 02 Powell Duplex.pdf
PDF 504 KB Posted
- Solicitation number
- 1240LU27Q0001
- Issued by
-
Department of Agriculture Forest Service
About this file
Amendment 02 to Solicitation 1240LU27Q0001 - Powell Duplex Improvements
This document is an amendment to a federal solicitation issued by the USDA Forest Service for construction improvements to Powell Duplex on the Nez Perce-Clearwater National Forest. Amendment 002, effective November 20, 2026, extends the offer due date from December 1, 2026 at 5:00 p.m. PST to December 11, 2026 at 5:00 p.m. PST. The contracting office is USDA-FS CSA Intermountain 9, located in Ogden, Utah. The period of performance is January 18, 2027 through April 1, 2028, with FOB Destination. The amendment includes 19 questions and answers addressing technical clarifications regarding the project specifications, plans, and construction requirements.
Key project clarifications include: plans should be plotted on 11x17 pages with the contractor responsible for final dimensions; metal roof panels may be substituted if they meet specification 074113 requirements (24-gauge steel, 18-inch width, 1-3/8-inch seam, Kynar finish); structural insulated panels (SIPs) must be from a Structural Insulated Panel Association (SIPA) member meeting FrameGuard performance standards; the duplex contains only one wood stove and chimney to be installed in Unit B, Living Room 120, with the stove owner-furnished and the chimney contractor-installed; interior work may proceed during winter months after roof replacement, with all work completed by November 30, 2027; SIP ceilings require 1/2-inch Type X gypsum board while other drywall requires 5/8-inch Type X; and new water closets should be priced in Base Item 0001AF Plumbing. The amendment notes that additional amendments will follow with revised specifications and further questions and answers.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
1240LU27Q0001
x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
40LU
OGDEN UT 84401-2310
324 25TH ST
USDA-FS CSA INTERMOUNTAIN 9
GAOA11/20/20260002
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
10/14/2026
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Solicitation 1240LU27Q0001, Powell Duplex Improvements, Nez Perce - Clearwater National
Forest, is amended as follows:
See Attachment 1 Solicitation, Pg 1, SF-1442, 13. ADDITIONAL SOLICITATION REQUIREMENTS, change due date and time from December 1, 2026 at 5:00 p.m. to December 11, 2026 at 5:00 p.m. PST.
Attached document "Amendment 02 Photos Powell Duplex 2027" is provided for informational purposes only.
Another Amendment will be posted with additional Questions/Answers, revised SOI, and
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
WESLEY R. DUDLEY
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 7CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
1240LU27Q0001/0002
revised Specifications.
All other terms and conditions remain unchanged.
FOB: Destination
Period of Performance: 01/18/2027 to 04/01/2028
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
Amendment 02 Powell Duplex Improvements
November 20, 2026
Solicitation 1240LU27Q0001, Powell Duplex Improvements, Nez Perce - Clearwater National Forest, is amended as follows:
The following questions and answers are being provided for informational or clarification purposes only.
Q1. The plans provided with the solicitation are not plotted to scale and on the wrong sheet size.
This makes it difficult to scale dimensions from the plans for quantity take-offs. Are you able to replot so the scale on the plans is accurate and redistributed? If not, Mosaic should be able to do this.
A1: Plans should be plotted on 11x17 pages. To scale for takeoff quantities, however final purchase dimensions are the responsibility of the contractor. Drawings should be reasonably close.
Q2: Are photos, a condition assessment, or destructive investigation results available showing the extent of the SIP panel and structural damage? Is the manufacturer, thickness, and specification of the existing 1994 SIP panels known, so replacement panels can be matched?
A2: The photos for the recent condition are attached in the document Amendment 02 Photos Powell Duplex 2027. The evaluation report will be posted with the next amendment.
Q3: The General Demolition Notes on Sheet A100 reference hazardous materials abatement drawings. Has a hazardous materials survey been completed for this building, and if so, can it be provided? Is any abatement work part of this contract?
A3: There were no hazardous materials used in the construction of these buildings. The building was constructed in 1991, and we do not anticipate any in the building.
Q4: Given the seasonal limitations noted in Technical Data (h), will the Government allow interior work to proceed during the winter months, with exterior roofing and SIP panel work scheduled for the 2027 construction season, as long as all work is completed by November 30, 2027?
A4: Yes, Interior work is expected to proceed during the winter months after the roof is replaced.
The site has power, water, and sewer available once the ceiling is repaired.
Q5: Can you verify the covered entry will have 5/8” sheathing on the roof and not a SIP panel?
A5: Drawing A401 Call Out 5 shows the porch roof at the low eave is a Plywood soffit not a SIP.
Q6: Do you have interior and exterior photos of the building you can share for bidders?
A6: The photos for the recent condition are included in attached document Amendment 02 Photos Powell Duplex 2027.
November 20, 2026
Q7: Can the exterior metal wainscoting be salvaged and replaced for use as siding on the new SIP wall?
A7: Yes
Q8: Room Finish Schedule on A701, West Wall calls out 01 paint, should this be P1?
A8: Yes, it should read P1
Q9: Should bidders anticipate mold remediation in their bids? If so, can you provide a quantity for bidding purposes? Or will this be a modification to the contract if discovered?
A9: If a differing site condition is encountered, it will be handled under the awarded contract terms and conditions.
Q10: Are there bathrooms available for work crews onsite or do we need to provide a port-a-potty?
A10: Water may be turned on to the buildings and Toilets could be available; however, roofing work may interrupt service.
Q11: Plans are not plotted to scale, sheet size is 8.5x11. Can the plans be plotted to pdf at actual size and to scale for take-off quantities?
A11: Plans should be plotted on 11x17 pages. To scale for takeoff quantities, however final purchase dimensions are the responsibility of the contractor. Drawings should be reasonably close.
Q12: Second chimney: The solicitation describes a woodstove chimney on each side of the duplex, but Roof Plan A103 shows only one. Does a second chimney require a new cricket and flashing, or will it be removed and the roof opening patched?
A12: There will be only one new Chimney at this time.
Q13: Site visit information: Could the Government share any roof measurements, photos, or notes collected during the October 29 site visit? Our quantities are currently scaled from the drawings, and field measurements would help improve pricing accuracy.
A13: The photos for the recent condition are included in the attached document Amendment 02 Photos Powell Duplex 2027.
November 20, 2026
Q14: Panel substitution: The basis of design is PAC-CLAD Redi-Roof Standing Seam. Would the Forest Service accept an equivalent panel with 24-gauge steel, 18-inch width, a 1-3/8-inch seam, and a Kynar finish, provided all roofing materials come from one manufacturer and meet the remaining specifications?
A14: Yes, the substitution matches Specification 074113 Page 4
See Below
2.02 METAL ROOF PANELS
A. Architectural Standing Seam Metal Roofing: Provide complete engineered system complying with specified requirements and capable of remaining weathertight while withstanding anticipated movement of substrate and thermally induced movement of roofing system.
B. Provide factory-formed metal roof panels designed to be installed by lapping and interconnecting raised side edges of adjacent panels with joint type indicated and mechanically attaching panels to supports using concealed clips in side laps. Include clips, cleats, pressure plates and accessories required for a weathertight installation.
1. Minimum 24 gauge thick, precoated steel sheet.
2. Standing Seam, Smooth Panel, 1 3/8" seam height.
3. Slope rating: rated for use down to 3":12"
4. Panel Widths: 18 inches.
5. Concealed fastener system.
6. Roof panels to be continuous single panels, unspliced on each side of the edge.
7. Finish: Kynar 500 or Hylar 5000 Fluorocarbon coating with a film thickness of 0.70 to
0.90 mi over a 0.25 to 0.3 mil prime coat to provide a total dry film thickness of 0.95 to 1.25 mil, to meet AAMA 621. Bottom side shall be coated with a primer with a dry film thickness of 0.25 mil. Finish shall conform to all tests for adhesions, flexibility and longevity as specified by Kynar 500 or Hylar 5000 finish supplier.
8. Color: To be chosen from manufacturer's full range of colors.
9. UL Classification: UL-580 Class 90 wind uplift
10. Fire Rating: UL-790 Class A C. Trim: Same material, thickness and finish as exterior sheets, brake formed to required profile.
Q15: Frame Guard is a proprietary, trademarked product of R-Control/Big Sky, not a generic performance requirement. The section appears to have been adapted from a manufacturer's guide spec. Please confirm that equal SIPs meeting the performance criteria of 06 1219 (OSB per PS 2, Exposure 1, Structural I, 24/16 span rating; EPS per ASTM C578 Type XI; 6-1/2" walls and 10- 1/4" roof) are acceptable without Frame Guard. If insect or moisture protection of the OSB is actually required, please state the performance standard so all manufacturers can bid to it.
A15: The main requirements in the specifications (06 1219-1 1.06 Quality Assurance) is that the manufacturer to be a Member of Structural Insulated Panel Association (SIPA). The FrameGuard trademark coating is a high standard per the testing AWPA E1 and ASTM D3273. If
November 20, 2026 the substitution can provide information that their application meets the same level of compliance as noted in the specification (it is required to meet or exceed FrameGuard). Note:
FrameGuard's testing for comparison-Score a 7.0 and higher out of 10 for AWPA E1 and a 10 out of 10 for ASTM D3273. An approved equal will be considered.
Q16: Wood Siding (Spec 07 4623 vs. Drawings A103, A201, A401) The specification calls for 5/4x8 rabbeted bevel Western Red Cedar, Clear Vertical Grain. The drawings call for "wood lap siding to match existing profile and exposure – painted color P1," and General Note 2 on A201 states all exposed wood is to be painted. Since the siding will be painted, will a wood lap siding that matches the existing profile and exposure be accepted in lieu of Clear Vertical Grain cedar? If CVG cedar is required, please confirm.
A16: Yes, if the wood siding matches existing profile and exposure, painted to match. However, it must be exterior grade, resistant to water, and adverse weather conditions.
Q17: Wood Stove (Spec 10 3100 vs. Mechanical M201) Specification 10 3100 has the contractor furnishing wood stoves. M201 Key Note 3 states the wood stove is owner-furnished and owner-installed, with the contractor furnishing and installing the Class A chimney. M201 shows a new stove pipe in Living Room 120 only, and A103 shows one chimney. Please confirm:
a. Is the wood stove owner-furnished, or is the contractor to furnish it?
b. Is there only one stove/chimney location (Unit B, Living Room 120)? A701 shows a PT1 stove board in Living Room 102 as well, but no stove or chimney is shown for Unit A.
A17 a: The wood stove to be installed will be owner furnished.
A17 b: There is only one wood stove and chimney to be installed in the duplex and that is in room 120 as shown on A101, A103, M201, Drawing 1 in 701 Door Finish Schedule should not have flooring tile for a chimney in room 102 in Unit A.
Q18: Gypsum Board: A104 calls for 1/2" Type X on the SIP ceilings; Spec 09 2116 calls for 5/8" Type X. Which governs?
A18: The SIP Ceilings should be covered in ½” Type X Gypsum Board and indicated in the plans. All other Drywall should be 5/8” Type X Gypsum board. Section 09 2116 Gypsum Board Assemblies, Part 2 Products, 2.01 Gypsum Board Assemblies, E. Ceiling Board: Special sag-resistant type.
1. Application: Ceilings unless otherwise indicated.
2. Core Type: Type X.
3. Thickness: 5/8 inch.
4. Edges: Tapered.
November 20, 2026
Q19: Plumbing: The plumbing key notes state "include work in bid alternate," but the Schedule of Items has only one option (0002AA Interior Painting). Should the new water closets be priced in Base Item 0001AF Plumbing?
A19: That is correct, the new water closets should be in the Base Item 0001AF Plumbing.