C04 Attachment 3 - Specifications Powell Duplex.pdf

PDF 1 MB Posted

Attached to
GAOA Powell Duplex Improvements, Nez Perce - Clearwater National Forest
Solicitation number
1240LU27Q0001
Issued by

About this file

This is a project manual and specifications document for the GAOA Powell Duplex Improvements project on the Nez Perce-Clearwater National Forest. The specifications outline comprehensive construction requirements for removing and replacing the existing roof, water-damaged Structural Insulated Panels (SIPs), and structural members in an existing residential duplex. Key construction elements include rough carpentry framing using Douglas Fir-Larch lumber (No. 2 grade for concealed applications, Clear grade for exposed applications), structural insulated panels with 6.5-inch walls and 10.25-inch roofs using oriented strand board and expanded polystyrene insulation, thermal insulation with rigid foam board perimeter insulation and R-21 batt insulation at exterior walls, weather barriers using DuPont Tyvek HomeWrap with seam tape, metal roof panels, wood siding, sheet metal flashing and trim, steel residential doors with hardware, gypsum board assemblies, resilient flooring and carpeting, painting and coatings, plumbing fixtures, HVAC components including heaters, and LED lighting systems.

The specifications mandate all electronic document submittals in PDF format, with a preconstruction meeting required after Notice of Award attended by the USFS Contracting Officer, general contractor, and major subcontractors. Progress meetings are required at maximum bi-monthly intervals. RFI responses must be provided within ten calendar days, and submittals for review allow fifteen days excluding delivery time. Construction waste management is emphasized, requiring contractors to minimize landfill disposal and maximize recycling and reuse of materials including aluminum and plastic containers, cardboard, wood pallets, clean dimensional wood, concrete, metals, glass, gypsum drywall, plastic sheeting, and rigid foam insulation. The project requires compliance with USFS operational continuity with forty-eight-hour advance notification for major operations. All contractors must maintain site security, provide temporary utilities and sanitary facilities, implement dust and erosion control measures, and comply with federal, state, and local regulations regarding construction waste disposal. The small business set-aside acquisition uses the 236118 NAICS code with a size standard of $45 million.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT MANUAL FOR:

GAOA POWELL DUPLEX

IMPROVEMENTS

Volume 1of 1

Date: July 19, 2024

100% CD Specifications

ARCHITECT

MOSAIC ARCHITECTURE, P.C.

317 North Cruse Ave, Suite 201

Helena, Montana 59601 www.mosaicarch.com

28621 / USFS Powell Duplex Improvements

00 0110 - 1 Table of Contents

SECTION 00 0110

TABLE OF CONTENTS

PROCUREMENT AND CONTRACTING REQUIREMENTS

1.01 DIVISION 00 -- PROCUREMENT AND CONTRACTING REQUIREMENTS

SPECIFICATIONS

2.01 DIVISION 01 -- GENERAL REQUIREMENTS

A. 01 3000 - Administrative Requirements

B. 01 5000 - Temporary Facilities and Controls

C. 01 7000 - Execution and Closeout Requirements

D. 01 7419 - Construction Waste Management and Disposal

2.02 DIVISION 02 -- EXISTING CONDITIONS

A. 02 4100 - Demolition

B. 02 4113 Selective Site Demolition

2.03 DIVISION 06 -- WOOD, PLASTICS, AND COMPOSITES

A. 06 1000 - Rough Carpentry

B. 06 1219 - Structural Insulated Panels

C. 06 2000 - Finish Carpentry

2.04 DIVISION 07 -- THERMAL AND MOISTURE PROTECTION

A. 07 2100 - Thermal Insulation

B. 07 2500 - Weather Barriers

C. 07 4113 - Metal Roof Panels

D. 07 4623 - Wood Siding

E. 07 6200 - Sheet Metal Flashing and Trim

F. 07 9200 - Joint Sealants

2.05 DIVISION 08 -- OPENINGS

A. 08 1118 - Residential Steel Doors

B. 08 7100 - Door Hardware

2.06 DIVISION 09 -- FINISHES

A. 09 2116 - Gypsum Board Assemblies

B. 09 6516.23 - Resilient Flooring

C. 09 6816 - Sheet Carpeting

D. 09 9000 - Painting and Coating

2.07 DIVISION 10 -- SPECIALTIES

A. 10 3100 - Manufactured Fireplaces

2.08 DIVISION 22 -- PLUMBING

A. 22 0000 - General Requirements of Plumbing and HVAC

B. 22 0500 - General Provision of Plumbing and HVAC

C. 22 4100 - Plumbing Fixtures

2.09 DIVISION 23 -- HEATING, VENTILATING, AND AIR-CONDITIONING (HVAC)

A. 23 8231 Heaters

2.10 DIVISION 26 -- ELECTRICAL

A. 26 0010 - General Electrical Requirements

00 0110 - 2 Table of Contents

B. 26 0505 - Selective Demolition for Electrical

C. 26 0519 - Low-Voltage Electrical Power Conductors and Cables

D. 26 0533 - Raceways and Boxes for Electrical Systems

E. 26 2726 - Wiring Devices

F. 26 5110 LED Lighting

01 3000 - 1 Administrative Requirements

PART 1 GENERAL

1.01 SECTION INCLUDES

SECTION 01 3000

ADMINISTRATIVE REQUIREMENTS

A. Electronic document submittals.

B. Preconstruction meeting.

C. Progress meetings.

D. Construction progress schedule.

E. Submittals for review, information, and project closeout.

F. Requests for Interpretation (RFI) procedures.

PART 2 PRODUCTS - NOT USED

PART 3 EXECUTION

3.01 ELECTRONIC DOCUMENT SUBMITTAL

A. All documents transmitted for purposes of administration of the contract are to be in electronic (PDF) format.

1. Besides submittals for review, information, and closeout, this procedure applies to requests for information (RFI's) progress documentation, contract modification documents (e.g. supplementary instructions, change proposals, change orders), applications for payment, field reports and meeting minutes, and any other document any participant wishes to make part of the project record.

3.02 PRECONSTRUCTION MEETING

A. USFS Contracting Officer will schedule a meeting after Notice of Award.

B. Attendance Required:

1. USFS Contracting Officer

2. General Contractor.

3. All major sub-contractors.

C. Agenda:

1. Execution of USFS Contracting Officer-General Contractor Agreement.

2. Submission of executed bonds and insurance certificates.

3. Distribution of Contract Documents.

4. Submission of list of subcontractors, list of products, schedule of values, and progress schedule.

5. Designation of personnel representing the parties to Contract and <1|A/E|>.

6. Procedures and processing of field decisions, submittals, substitutions, applications for payments, proposal request, Change Orders, and Contract closeout procedures.

7. Scheduling.

D. Contractor will record minutes and distribute copies within seven days after meeting to participates, with one copy to Owner, participants, and those affected by decisions made.

3.03 PROGRESS MEETINGS

A. Schedule and administer meetings throughout progress of the work at maximum bi-monthly intervals.

B. Attendance Required:

1. General Contractor.

2. USFS Contracting Officer.

3. General Contractor's superintendent.

4. Major subcontractors.

C. Agenda:

1. Review minutes of previous meetings.

01 3000 - 2 Administrative Requirements

2. Review of work progress.

3. Field observations, problems, and decisions.

4. Identification of problems that impede, or will impede, planned progress.

5. Review of submittals schedule and status of submittals.

6. Maintenance of progress schedule.

7. Corrective measures to regain projected schedules.

8. Planned progress during succeeding work period.

9. Maintenance of quality and work standards.

10. Effect of proposed changes on progress schedule and coordination.

11. Other business relating to work.

D. Record minutes and distribute copies within two days after meeting to participants, with two copies to USFS Contracting Officer, participants, and those affected by decisions made.

3.04 CONSTRUCTION PROGRESS SCHEDULE - SEE SECTION 01 3216

A. If preliminary schedule requires revision after review, submit revised schedule within 10 days.

B. Within 20 days after review of preliminary schedule, submit draft of proposed complete schedule for review.

C. Within 10 days after joint review, submit complete schedule.

3.05 REQUESTS FOR INTERPRETATION (RFI)

A. Definition: A request seeking one of the following:

1. An interpretation, amplification, or clarification of some requirement of Contract

Documents arising from inability to determine from them the exact material, process, or system to be installed; or when the elements of construction are required to occupy the same space (interference); or when an item of work is described differently at more than one place in Contract Documents.

B. Whenever possible, request clarifications at the next appropriate project progress meeting, with response entered into meeting minutes, rendering unnecessary the issuance of a formal RFI.

C. Preparation: Prepare an RFI immediately upon discovery of a need for interpretation of Contract Documents. Failure to submit a RFI in a timely manner is not a legitimate cause for claiming additional costs or delays in execution of the work.

1. Prepare a separate RFI for each specific item.

2. Prepare using software provided by the Electronic Document Submittal Service.

D. Content: Include identifiers necessary for tracking the status of each RFI, and information necessary to provide an actionable response.

1. Official Project name and number, and any additional required identifiers established in

Contract Documents.

2. USFS Contracting Officer's, and General Contractor's names.

E. RFI Log: Prepare and maintain a tabular log of RFIs for the duration of the project.

1. Indicate current status of every RFI. Update log promptly and on a regular basis.

2. Note dates of when each request is made, and when a response is received.

3. Highlight items requiring priority or expedited response.

F. Review Time: USFS Contracting Officer will respond and return RFIs to General Contractor within 10 calendar days of receipt. For the purpose of establishing the start of the mandated response period, RFIs received after 12:00 noon will be considered as having been received on the following regular working day.

3.06 SUBMITTAL SCHEDULE

A. Submit to USFS Contracting Officer for review a schedule for submittals in tabular format.

1. Coordinate with General Contractor's construction schedule and schedule of values.

3.07 SUBMITTALS FOR REVIEW

A. When the following are specified in individual sections, submit them for review:

01 3000 - 3 Administrative Requirements

1. Product data.

2. Shop drawings.

3. Samples for selection.

4. Samples for verification.

B. Submit to COR and third party inspector for review for the limited purpose of checking for compliance with information given and the design concept expressed in Contract Documents.

C. Samples will be reviewed for aesthetic, color, or finish selection.

D. After review, provide copies and distribute in accordance with SUBMITTAL PROCEDURES article below and for record documents purposes described in Section 01 7800 - Closeout Submittals.

3.08 SUBMITTALS FOR INFORMATION

A. When the following are specified in individual sections, submit them for information:

1. Design data.

2. Certificates.

3. Test reports.

4. Inspection reports.

5. Manufacturer's field reports.

6. Other types indicated.

B. Submit for third party inspector's knowledge or for USFS Contracting Officer.

3.09 SUBMITTALS FOR PROJECT CLOSEOUT

A. Submit Correction Punch List for Substantial Completion.

B. Submit Final Correction Punch List for Substantial Completion.

C. When the following are specified in individual sections, submit them at project closeout in compliance with requirements of Section 01 7800 - Closeout Submittals:

1. Project record documents.

2. Operation and maintenance data.

3. Warranties.

4. Bonds.

5. Other types as indicated.

D. Submit for USFS Contracting Officer's benefit during and after project completion.

3.10 SUBMITTAL PROCEDURES

A. Shop Drawing Procedures:

1. Prepare accurate, drawn-to-scale, original shop drawing documentation by interpreting the

Contract Documents and coordinating related work.

2. Generic, non-project-specific information submitted as shop drawings do not meet the requirements for shop drawings.

B. Transmit each submittal with a copy of approved submittal form.

C. Transmit each submittal with approved form.

D. Sequentially number the transmittal form. Revise submittals with original number and a sequential alphabetic suffix.

E. Identify Project, Contractor, Subcontractor or supplier, pertinent drawings and detail number, and specification section number, as appropriate on each copy.

F. Apply Contractor's stamp, signed or initialed certifying that review, approval, verification of products required, field dimensions, adjacent construction work, and coordination of information is in accordance with the requirements of the work and contract documents.

G. Schedule submittals to expedite the project, and coordinate submission of related items.

H. For each submittal for review, allow 15 days excluding delivery time to and from the contractor.

01 3000 - 4 Administrative Requirements

I. Identify variations from contract documents and product or system limitations that may be detrimental to successful performance of the complete work.

J. When revised for resubmission, identify all changes made since previous submission.

K. Distribute reviewed submittals as appropriate. Instruct parties to promptly report any inability to comply with requirements.

L. Submittals not requested will not be recognized or processed.

3.11 SUBMITTAL REVIEW

A. Submittals for Review: USFS Contracting Officer will review each submittal, and approve, or take other appropriate action.

B. Submittals for Information: USFS Contracting Officer will acknowledge receipt and review. See below for actions to be taken.

C. The USFS Contracting Officer may elect to forward submittals to a third party inspector. In these cases:

1. Third party inspector shall take actions on items submitted for review. Actions shall be:

a. "Approved", or language with same legal meaning.

b. "Approved as Noted, Resubmission not required", or language with same legal meaning.

1) At General Contractor's option, submit corrected item, with review notations acknowledged and incorporated.

c. "Approved as Noted, Resubmit for Record", or language with same legal meaning.

d. "Rejected" revise and resubmit items complying with requirements of Contract

Documents:

END OF SECTION

01 5000 - 1 Temporary Facilities and Controls

SECTION 01 5000

TEMPORARY FACILITIES AND CONTROLS

PART 1 GENERAL

1.01 SECTION INCLUDES

A. Temporary utilities.

B. Temporary telecommunications services.

C. Temporary sanitary facilities.

D. Temporary Controls: Barriers, enclosures, and fencing.

E. Security requirements.

F. Waste removal facilities and services.

G. Field offices.

1.02 TEMPORARY UTILITIES

A. USFS Contracting Officer will provide the following:

1. Electrical power, consisting of connection to existing facilities for basic construction operations. This does not include power for any on-site temporary living facilities for construction personnel. Electrical power provided by the USFS is also NOT to be used for temporary heating. All temporary heating system and energy source to be provide by the General Contractor.

2. Water supply, consisting of connection to existing facilities.

B. Use trigger-operated nozzles for water hoses, to avoid waste of water.

1.03 TELECOMMUNICATIONS SERVICES

A. Provide, maintain, and pay for telecommunications services to field office at time of project mobilization.

1.04 TEMPORARY SANITARY FACILITIES

A. Provide and maintain required facilities and enclosures. Provide at time of project mobilization.

B. Maintain daily in clean and sanitary condition.

1.05 BARRIERS

A. Provide barriers to prevent unauthorized entry to construction areas, to prevent access to areas that could be hazardous to workers, USFS employees on site, or the public, to allow for owner's use of site and to protect existing facilities and adjacent properties from damage from construction operations and demolition.

B. Protect non-owned vehicular traffic, stored materials, site, and structures from damage.

1.06 FENCING

A. Construction: General Contractor's option to define area of work.

1.07 EXTERIOR ENCLOSURES

A. Provide temporary insulated weather tight closure of exterior openings to accommodate acceptable working conditions and protection for Products, to allow for temporary heating and maintenance of required ambient temperatures identified in individual specification sections, and to prevent entry of unauthorized persons. Provide access doors with self-closing hardware and locks.

1.08 SECURITY - SEE SECTION 01 3553

A. Provide security and facilities to protect Work, existing facilities, and USFS Contracting Officer's operations from unauthorized entry, vandalism, or theft.

1.09 VEHICULAR ACCESS AND PARKING

A. Coordinate access and haul routes with governing authorities and USFS Contracting Officer.

B. Provide and maintain access to fire hydrants, free of obstructions.

01 5000 - 2 Temporary Facilities and Controls

C. Provide means of removing mud from vehicle wheels before entering streets.

D. Provide and define temporary parking areas to accommodate construction personnel. Locate parking as designated by the USFS Contracting Officer.

1.10 WASTE REMOVAL

A. Provide waste removal facilities and services as required to maintain the site in clean and orderly condition.

B. Provide containers with lids. Remove trash from site periodically.

C. If materials to be recycled or re-used on the project must be stored on-site, provide suitable non-combustible containers; locate containers holding flammable material outside the structure unless otherwise approved by the authorities having jurisdiction.

D. Open free-fall chutes are not permitted. Terminate closed chutes into appropriate containers with lids.

PART 2 PRODUCTS - NOT USED

PART 3 EXECUTION - NOT USED

Execution and Closeout Requirements

01 7000 - 1

SECTION 01 7000

EXECUTION AND CLOSEOUT REQUIREMENTS

1.01 SECTION INCLUDES

A. Examination, preparation, and general installation procedures.

B. Pre-installation meetings.

C. Cutting and patching.

D. Surveying for laying out the work.

E. Cleaning and protection.

F. Starting of systems and equipment.

G. Demonstration and instruction of USFS Contracting Officer personnel.

H. Closeout procedures, including General Contractor's Correction Punch List, except payment procedures.

I. General requirements for maintenance service.

1.02 SUBMITTALS

A. See Section 01 3000 - Administrative Requirements, for submittal procedures.

B. Survey work: Submit name, address, and telephone number of Surveyor before starting survey work.

1. On request, submit documentation verifying accuracy of survey work.

2. Submit a copy of site drawing signed by the Land Surveyor, that the elevations and locations of the work are in compliance with Contract Documents.

3. Submit surveys and survey logs for the project record.

C. Cutting and Patching: Submit written request in advance of cutting or alteration that affects:

1. Structural integrity of any element of Project.

2. Integrity of weather exposed or moisture resistant element.

3. Efficiency, maintenance, or safety of any operational element.

4. Visual qualities of sight exposed elements.

5. Work of USFS Contracting Officer or separate Contractor.

1.03 QUALIFICATIONS

A. For surveying work, employ a land surveyor registered in the State in which the Project is located and acceptable to USFS Contracting Officer. Submit evidence of surveyor's Errors and Omissions insurance coverage in the form of an Insurance Certificate. Employ only individual(s) trained and experienced in collecting and recording accurate data relevant to ongoing construction activities,

1.04 PROJECT CONDITIONS

A. USFS will continue to utilize the site during construction. Construction operations must be coordinated with USFS site usage. All major delivery operations and operations requiring large on-site equipment must be coordinated with USFS on site staff to avoid disruption of USFS operations. Provide minimum 48-hour advance notification for such major operations.

B. Grade site to drain. Maintain excavations free of water. Provide, operate, and maintain pumping equipment.

C. Protect site from puddling or running water. Provide water barriers as required to protect site from soil erosion.

D. Ventilate enclosed areas to assist cure of materials, to dissipate humidity, and to prevent accumulation of dust, fumes, vapors, or gases.

E. Dust Control: Execute work by methods to minimize raising dust from construction operations.

Provide positive means to prevent air-borne dust from dispersing into atmosphere and over adjacent property.

Execution and Closeout

01 7000 - 2

F. Erosion and Sediment Control: Plan and execute work by methods to control surface drainage from cuts and fills, from borrow and waste disposal areas. Prevent erosion and sedimentation.

1. Minimize amount of bare soil exposed at one time.

2. Provide temporary measures such as berms, dikes, and drains, to prevent water flow.

3. Construct fill and waste areas by selective placement to avoid erosive surface silts or clays.

4. Periodically inspect earthwork to detect evidence of erosion and sedimentation; promptly apply corrective measures.

G. Noise Control: Provide methods, means, and facilities to minimize noise produced by construction operations.

H. Pest and Rodent Control: Provide methods, means, and facilities to prevent pests and insects from damaging the work.

I. Pollution Control: Provide methods, means, and facilities to prevent contamination of soil, water, and atmosphere from discharge of noxious, toxic substances, and pollutants produced by construction operations. Comply with federal, state, and local regulations.

1.05 COORDINATION

A. Coordinate scheduling, submittals, and work of the various sections of the Project Manual to ensure efficient and orderly sequence of installation of interdependent construction elements, with provisions for accommodating items installed later.

B. Notify affected utility companies and comply with their requirements.

C. Verify that utility requirements and characteristics of new operating equipment are compatible with building utilities. Coordinate work of various sections having interdependent responsibilities for installing, connecting to, and placing in service, such equipment.

D. Coordinate space requirements, supports, and installation of mechanical and electrical work that are indicated diagrammatically on drawings. Follow routing indicated for pipes, ducts, and conduit, as closely as practicable; place runs parallel with lines of building. Utilize spaces efficiently to maximize accessibility for other installations, for maintenance, and for repairs.

E. In finished areas except as otherwise indicated, conceal pipes, ducts, and wiring within the construction. Coordinate locations of fixtures and outlets with finish elements.

F. Coordinate completion and clean-up of work of separate sections.

G. After USFS occupancy of premises, coordinate access to site for correction of defective work and work not in accordance with Contract Documents, to minimize disruption of USFS activities.

PART 2 PRODUCTS

2.01 PATCHING MATERIALS

A. New Materials: As specified in product sections; match existing products and work for patching and extending work.

B. Type and Quality of Existing Products: Determine by inspecting and testing products where necessary, referring to existing work as a standard.

C. Product Substitution: For any proposed change in materials, submit request for substitution described in Section 01 6000 - Product Requirements.

PART 3 EXECUTION

3.01 EXAMINATION

A. Verify that existing site conditions and substrate surfaces are acceptable for subsequent work.

Start of work means acceptance of existing conditions.

B. Verify that existing substrate is capable of structural support or attachment of new work being applied or attached.

C. Examine and verify specific conditions described in individual specification sections.

Execution and Closeout

01 7000 - 3

D. Take field measurements before confirming product orders or beginning fabrication, to minimize waste due to over-ordering or misfabrication.

E. Verify that utility services are available, of the correct characteristics, and in the correct locations.

F. Prior to Cutting: Examine existing conditions prior to commencing work, including elements subject to damage or movement during cutting and patching. After uncovering existing work, assess conditions affecting performance of work. Beginning of cutting or patching means acceptance of existing conditions.

3.02 PREPARATION

A. Clean substrate surfaces prior to applying next material or substance.

B. Seal cracks or openings of substrate prior to applying next material or substance.

C. Apply manufacturer required or recommended substrate primer, sealer, or conditioner prior to applying any new material or substance in contact or bond.

3.03 LAYING OUT THE WORK

A. Verify locations of survey control points prior to starting work.

B. Promptly notify COR and third party inspector of any discrepancies discovered.

C. Protect survey control points prior to starting site work; preserve permanent reference points during construction.

D. Promptly report to COR and third party inspector the loss or destruction of any reference point or relocation required because of changes in grades or other reasons.

E. Replace dislocated survey control points based on original survey control. Make no changes without prior written notice to COR and third party inspector.

F. Utilize recognized engineering survey practices.

G. Establish elevations, lines and levels. Locate and lay out by instrumentation and similar appropriate means:

1. Site improvements including pavements; stakes for grading, fill and topsoil placement;

utility locations, slopes, and invert elevations.

2. Grid or axis for structures.

3. Building foundation, column locations, ground floor elevations.

H. Periodically verify layouts by same means.

I. Maintain a complete and accurate log of control and survey work as it progresses.

3.04 GENERAL INSTALLATION REQUIREMENTS

A. Install products as specified in individual sections, in accordance with manufacturer's instructions and recommendations, and so as to avoid waste due to necessity for replacement.

B. Make vertical elements plumb and horizontal elements level, unless otherwise indicated.

C. Install equipment and fittings plumb and level, neatly aligned with adjacent vertical and horizontal lines, unless otherwise indicated.

D. Make consistent texture on surfaces, with seamless transitions, unless otherwise indicated.

E. Make neat transitions between different surfaces, maintaining texture and appearance.

3.05 CUTTING AND PATCHING

A. Whenever possible, execute the work by methods that avoid cutting or patching.

B. Perform whatever cutting and patching is necessary to:

1. Complete the work.

2. Fit products together to integrate with other work.

3. Provide openings for penetration of mechanical, electrical, and other services.

4. Match work that has been cut to adjacent work.

5. Repair areas adjacent to cuts to required condition.

Execution and Closeout

01 7000 - 4

6. Repair new work damaged by subsequent work.

7. Remove samples of installed work for testing when requested.

8. Remove and replace defective and non-complying work.

C. Execute work by methods that avoid damage to other work and that will provide appropriate surfaces to receive patching and finishing. In existing work, minimize damage and restore to original condition.

D. Employ original installer to perform cutting for weather exposed and moisture resistant elements, and sight exposed surfaces.

E. Cut rigid materials using masonry saw or core drill. Pneumatic tools not allowed without prior approval.

F. Restore work with new products in accordance with requirements of Contract Documents.

G. Fit work air tight to pipes, sleeves, ducts, conduit, and other penetrations through surfaces.

H. At penetrations of fire rated walls, partitions, ceiling, or floor construction, completely seal voids with fire rated material in accordance with Section 07 8400, to full thickness of the penetrated element.

I. Patching:

1. Finish patched surfaces to match finish that existed prior to patching. On continuous surfaces, refinish to nearest intersection or natural break. For an assembly, refinish entire unit.

2. Match color, texture, and appearance.

3. Repair patched surfaces that are damaged, lifted, discolored, or showing other imperfections due to patching work. If defects are due to condition of substrate, repair substrate prior to repairing finish.

3.06 PROGRESS CLEANING

A. Maintain areas free of waste materials, debris, and rubbish. Maintain site in a clean and orderly condition.

B. Remove debris and rubbish from pipe chases, plenums, attics, crawl spaces, and other closed or remote spaces, prior to enclosing the space.

C. Broom and vacuum clean interior areas prior to start of surface finishing, and continue cleaning to eliminate dust.

D. Collect and remove waste materials, debris, and trash/rubbish from site periodically and dispose off-site; do not burn or bury.

3.07 PROTECTION OF INSTALLED WORK

A. Protect installed work from damage by construction operations.

B. Provide special protection where specified in individual specification sections.

C. Provide temporary and removable protection for installed products. Control activity in immediate work area to prevent damage.

D. Provide protective coverings at walls, projections, jambs, sills, and soffits of openings.

E. Protect finished floors, stairs, and other surfaces from traffic, dirt, wear, damage, or movement of heavy objects, by protecting with durable sheet materials.

F. Prohibit traffic or storage upon waterproofed or roofed surfaces. If traffic or activity is necessary, obtain recommendations for protection from waterproofing or roofing material manufacturer.

G. Remove protective coverings when no longer needed; reuse or recycle coverings if possible.

3.08 SYSTEM STARTUP

A. Coordinate schedule for start-up of various equipment and systems with USFS Contracting Officer.

Execution and Closeout

01 7000 - 5

B. Verify that each piece of equipment or system has been checked for proper lubrication, drive rotation, belt tension, control sequence, and for conditions that may cause damage.

C. Verify tests, meter readings, and specified electrical characteristics agree with those required by the equipment or system manufacturer.

D. Verify that wiring and support components for equipment are complete and tested.

E. Execute start-up under supervision of applicable General Contractor personnel and USFS Contracting Officer and manufacturer's representative in accordance with manufacturers' instructions.

F. Submit a written report that equipment or system has been properly installed and is functioning correctly.

3.09 DEMONSTRATION AND INSTRUCTION

A. Demonstrate start-up, operation, control, adjustment, trouble-shooting, servicing, maintenance, and shutdown of each item of equipment at scheduled time, at equipment location.

B. For equipment or systems requiring seasonal operation, perform demonstration for other season within six months.

C. Provide a qualified person who is knowledgeable about the Project to perform demonstration and instruction of Owner's personnel.

3.10 ADJUSTING

A. Adjust operating products and equipment to ensure smooth and unhindered operation.

3.11 FINAL CLEANING

A. Use cleaning materials that are nonhazardous.

B. Clean interior and exterior glass, surfaces exposed to view; remove temporary labels, stains and foreign substances, polish transparent and glossy surfaces, vacuum carpeted and soft surfaces.

C. Remove all labels that are not permanent. Do not paint or otherwise cover fire test labels or nameplates on mechanical and electrical equipment.

D. Clean equipment and fixtures to a sanitary condition with cleaning materials appropriate to the surface and material being cleaned.

E. Clean filters of operating equipment.

F. Clean debris from roofs, gutters, downspouts, scuppers, overflow drains, area drains, and drainage systems.

G. Clean site; sweep paved areas, rake clean landscaped surfaces.

H. Remove waste, surplus materials, trash/rubbish, and construction facilities from the site;

dispose of in legal manner; do not burn or bury.

3.12 CLOSEOUT PROCEDURES

A. Accompany USFS Contracting Officer on preliminary inspection to determine items to be listed for completion or correction in the General Contractor's Correction Punch List for General Contractor's Notice of Substantial Completion.

B. Notify USFS Contracting Officer when work is considered ready for USFS Contracting Officer's Substantial Completion inspection.

C. Submit written certification containing General Contractor's Correction Punch List, that Contract Documents have been reviewed, work has been inspected, and that work is complete in accordance with Contract Documents and ready for USFS Contracting Officer's Substantial Completion inspection.

D. Conduct Substantial Completion inspection and create Final Correction Punch List containing USFS Contracting Officer's and General Contractor's comprehensive list of items identified to be completed or corrected and submit to USFS Contracting Officer.

Execution and Closeout

01 7000 - 6

E. Correct items of work listed in Final Correction Punch List and comply with requirements for access to USFS Contracting Officer-occupied areas.

F. Notify USFS Contracting Officer when work is considered finally complete and ready for USFS Contracting Officer's Substantial Completion final inspection.

G. Complete items of work determined by USFS Contracting Officer listed in executed Certificate of Substantial Completion.

3.13 MAINTENANCE

A. Provide service and maintenance of components indicated in specification sections.

B. Maintenance Period: As indicated in specification sections or, if not indicated, not less than one year from the Date of Substantial Completion or the length of the specified warranty, whichever is longer.

C. Examine system components at a frequency consistent with reliable operation. Clean, adjust, and lubricate as required.

D. Include systematic examination, adjustment, and lubrication of components. Repair or replace parts whenever required. Use parts produced by the manufacturer of the original component.

E. Maintenance service shall not be assigned or transferred to any agent or subcontractor without prior written consent of the USFS Contracting Officer.

Construction Waste Management and Disposal

01 7419 - 1

SECTION 01 7419

CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL

PART 1 GENERAL

1.01 WASTE MANAGEMENT REQUIREMENTS

A. USFS Contracting Officer requires that this project generate the least amount of trash and waste possible.

B. Employ processes that ensure the generation of as little waste as possible due to error, poor planning, breakage, mishandling, contamination, or other factors.

C. Minimize trash/waste disposal in landfills; reuse, salvage, or recycle as much waste as economically feasible.

D. Required Recycling, Salvage, and Reuse: The following may not be disposed of in landfills or by incineration:

1. Aluminum and plastic beverage containers.

2. Corrugated cardboard.

3. Wood pallets.

4. Clean dimensional wood: May be used as blocking or furring.

5. Land clearing debris, including brush, branches, logs, and stumps; see Section 31 1000 -

Site Clearing for use options.

6. Concrete: May be crushed and used as riprap, aggregate, sub-base material, or fill.

7. Metals, including packaging banding, metal studs, sheet metal, structural steel, piping, reinforcing bars, door frames, and other items made of steel, iron, galvanized steel, stainless steel, aluminum, copper, zinc, lead, brass, and bronze.

8. Glass.

9. Gypsum drywall and plaster.

10. Plastic buckets.

11. Plastic sheeting.

12. Rigid foam insulation.

E. General Contractor shall develop and follow a Waste Management Plan designed to implement these requirements.

F. Methods of trash/waste disposal that are not acceptable are:

1. Burning on the project site.

2. Burying on the project site.

3. Dumping or burying on other property, public or private.

4. Other illegal dumping or burying.

G. Regulatory Requirements: General Contractor is responsible for knowing and complying with regulatory requirements, including but not limited to Federal, state and local requirements, pertaining to legal disposal of all construction and demolition waste materials.

1.02 DEFINITIONS

A. Clean: Untreated and unpainted; not contaminated with oils, solvents, caulk, or the like.

B. Construction and Demolition Waste: Solid wastes typically including building materials, packaging, trash, debris, and rubble resulting from construction, remodeling, repair and demolition operations.

C. Hazardous: Exhibiting the characteristics of hazardous substances, i.e., ignitibility, corrosivity, toxicity or reactivity.

D. Nonhazardous: Exhibiting none of the characteristics of hazardous substances, i.e., ignitibility, corrosivity, toxicity, or reactivity.

E. Nontoxic: Neither immediately poisonous to humans nor poisonous after a long period of exposure.

F. Recyclable: The ability of a product or material to be recovered at the end of its life cycle and remanufactured into a new product for reuse by others.

Construction Waste Management

01 7419 - 2

G. Recycle: To remove a waste material from the project site to another site for remanufacture into a new product for reuse by others.

H. Recycling: The process of sorting, cleansing, treating and reconstituting solid waste and other discarded materials for the purpose of using the altered form. Recycling does not include burning, incinerating, or thermally destroying waste.

I. Return: To give back reusable items or unused products to vendors for credit.

J. Reuse: To reuse a construction waste material in some manner on the project site.

K. Salvage: To remove a waste material from the project site to another site for resale or reuse by others.

L. Sediment: Soil and other debris that has been eroded and transported by storm or well production run-off water.

M. Source Separation: The act of keeping different types of waste materials separate beginning from the first time they become waste.

N. Toxic: Poisonous to humans either immediately or after a long period of exposure.

O. Trash: Any product or material unable to be reused, returned, recycled, or salvaged.

P. Waste: Extra material or material that has reached the end of its useful life in its intended use.

Waste includes salvageable, returnable, recyclable, and reusable material.

1.03 SUBMITTALS

A. See Section 01 3000 - Administrative Requirements, for submittal procedures.

B. Waste Management Plan: Include the following information:

1. Analysis of the trash and waste projected to be generated during the entire project construction cycle, including types and quantities.

2. Landfill Options: The name, address, and telephone number of the landfill(s) where trash/waste will be disposed of, the applicable landfill tipping fee(s), and the projected cost of disposing of all project trash/waste in the landfill(s).

3. Landfill Alternatives: List all waste materials that will be diverted from landfills by reuse, salvage, or recycling.

4. Meetings: Describe regular meetings to be held to address waste prevention, reduction, recycling, salvage, reuse, and disposal.

5. Materials Handling Procedures: Describe the means by which materials to be diverted from landfills will be protected from contamination and prepared for acceptance by designated facilities; include separation procedures for recyclables, storage, and packaging.

6. Transportation: Identify the destination and means of transportation of materials to be recycled; i.e. whether materials will be site-separated and self-hauled to designated centers, or whether mixed materials will be collected by a waste hauler.

PART 2 - NOT USED

PART 3 EXECUTION

3.01 WASTE MANAGEMENT PROCEDURES

A. See Section 01 3000 for additional requirements for project meetings, reports, submittal procedures, and project documentation.

B. See Section 01 5000 for additional requirements related to trash/waste collection and removal facilities and services.

C. See Section 01 6000 for waste prevention requirements related to delivery, storage, and handling.

D. See Section 01 7000 for trash/waste prevention procedures related to demolition, cutting and patching, installation, protection, and cleaning.

Construction Waste Management

01 7419 - 3

3.02 WASTE MANAGEMENT PLAN IMPLEMENTATION

A. Manager: Designate an on-site person or persons responsible for instructing workers and overseeing and documenting results of the Waste Management Plan.

B. Communication: Distribute copies of the Waste Management Plan to job site foreman, each subcontractor, USFS Contracting Officer, and third party inspector.

C. Instruction: Provide on-site instruction of appropriate separation, handling, and recycling, salvage, reuse, and return methods to be used by all parties at the appropriate stages of the project.

D. Meetings: Discuss trash/waste management goals and issues at project meetings.

1. Prebid meeting.

2. Preconstruction meeting.

3. Regular job-site meetings.

E. Facilities: Provide specific facilities for separation and storage of materials for recycling, salvage, reuse, return, and trash disposal, for use by all contractors and installers.

1. Provide containers as required.

2. Provide adequate space for pick-up and delivery and convenience to subcontractors.

3. Keep recycling and trash/waste bin areas neat and clean and clearly marked in order to avoid contamination of materials.

F. Hazardous Wastes: Separate, store, and dispose of hazardous wastes according to applicable regulations.

G. Recycling: Separate, store, protect, and handle at the site identified recyclable waste products in order to prevent contamination of materials and to maximize recyclability of identified materials. Arrange for timely pickups from the site or deliveries to recycling facility in order to prevent contamination of recyclable materials.

H. Reuse of Materials On-Site: Set aside, sort, and protect separated products in preparation for reuse.

I. Salvage: Set aside, sort, and protect products to be salvaged for reuse off-site.

This page intentionally left blank

02 4100 - 1 Demolition

SECTION 02 4100

DEMOLITION

PART 1 GENERAL

1.01 SECTION INCLUDES

A. Building demolition excluding removal of hazardous materials and toxic substances.

B. Selective demolition of building elements for alteration purposes.

1.02 RELATED REQUIREMENTS

A. Section 01 1000 - Summary: Limitations on General Contractor's use of site and premises.

B. Section 01 5000 - Temporary Facilities and Controls: Site fences, security, protective barriers, and waste removal.

C. Section 01 7000 - Execution and Closeout Requirements: Project conditions; protection of bench marks, survey control points, and existing construction to remain; reinstallation of removed products; temporary bracing and shoring.

1.03 REFERENCE STANDARDS

1.04 SUBMITTALS

A. See Section 01 3000 - Administrative Requirements for submittal procedures.

B. Site Plan: Indicate:

1. Areas for temporary construction and field offices.

C. Demolition Plan: Submit demolition plan as required by OSHA and local AHJs.

1. Indicate extent of demolition, removal sequencing, bracing and shoring, and location and construction of barricades and fences.

2. Demolition firm qualifications.

PART 3 EXECUTION

2.01 GENERAL PROCEDURES AND PROJECT CONDITIONS

A. Comply with applicable codes and regulations for demolition operations and safety of adjacent structures and the public.

1. Obtain required permits.

2. Take precautions to prevent catastrophic or uncontrolled collapse of structures to be removed; do not allow worker or public access within range of potential collapse of unstable structures.

3. Provide, erect, and maintain temporary barriers and security devices.

4. Conduct operations to minimize effects on and interference with adjacent structures and occupants.

5. Do not close or obstruct roadways or sidewalks without permits from authority having jurisdiction.

6. Conduct operations to minimize obstruction of public and private entrances and exits. Do not obstruct required exits at any time. Protect persons using entrances and exits from removal operations.

7. Obtain written permission from owners of adjacent properties when demolition equipment will traverse, infringe upon, or limit access to their property.

B. Do not begin removal until receipt of notification to proceed from USFS Contracting Officer.

C. Do not begin removal until built elements to be salvaged or relocated have been removed.

D. Protect existing structures and other elements to remain in place and not removed.

1. Provide bracing and shoring.

2. Prevent movement or settlement of adjacent structures.

3. Stop work immediately if adjacent structures appear to be in danger.

E. Hazardous Materials:

02 4100 - 2 Demolition

1. If hazardous materials are discovered during removal operations, stop work and notify COR and third party inspector; hazardous materials include regulated asbestos containing materials, lead, PCBs, and mercury.

F. Perform demolition in a manner that maximizes salvage and recycling of materials.

1. Dismantle existing construction and separate materials.

2. Set aside reusable, recyclable, and salvageable materials; store and deliver to collection point or point of reuse.

2.02 SELECTIVE DEMOLITION FOR ALTERATIONS

A. Existing construction and utilities indicated on drawings are based on casual field observation and existing record documents only.

1. Verify construction and utility arrangements are as indicated.

2. Report discrepancies to COR and third party inspector before disturbing existing installation.

3. Beginning of demolition work constitutes acceptance of existing conditions that would be apparent upon examination prior to starting demolition.

B. Remove existing work as indicated and required to accomplish new work.

1. Remove items indicated on drawings.

C. Services including, but not limited to, HVAC, Plumbing, Fire Protection, Electrical, and Telecommunications: Remove existing systems and equipment as indicated.

1. Maintain existing active systems to remain in operation, and maintain access to equipment and operational components.

2. Where existing active systems serve occupied facilities but are to be replaced with new services, maintain existing systems in service until new systems are complete and ready for service.

3. Verify that abandoned services serve only abandoned facilities before removal.

4. Remove abandoned pipe, ducts, conduits, and equipment, including those above accessible ceilings. Remove back to source of supply where possible, otherwise cap stub and tag with identification.

D. Protect existing work to remain.

1. Prevent movement of structure. Provide shoring and bracing as required.

2. Perform cutting to accomplish removal work neatly and as specified for cutting new work.

3. Repair adjacent construction and finishes damaged during removal work.

4. Patch to match new work.

2.03 DEBRIS AND WASTE REMOVAL

A. Remove debris, junk, and trash from site.

B. Leave site in clean condition, ready for subsequent work.

C. Clean up spillage and wind-blown debris from public and private lands.

06 1000 - 1 Rough Carpentry

SECTION 06 1000

ROUGH CARPENTRY

PART 1 GENERAL

1.01 SECTION INCLUDES

A. Structural dimension lumber framing.

B. Rough opening framing for doors, windows, and roof openings.

C. Sheathing.

D. Subflooring.

E. Underlayment.

F. Preservative treated wood materials.

G. Miscellaneous framing and sheathing.

H. Concealed wood blocking, nailers, and supports.

1.02 RELATED REQUIREMENTS

A. Section 06 1500 - Wood Decking.

B. Section 06 1733 - Wood I-Joists.

C. Section 06 1753 - Shop-Fabricated Wood Trusses.

D. Section 06 1800 - Glued-Laminated Construction.

E. Section 07 2500 - Weather Barriers: Air barrier over sheathing.

F. Section 07 6200 - Sheet Metal Flashing and Trim: Sill flashings.

1.03 REFERENCE STANDARDS

A. ANSI A208.1 - American National Standard for Particleboard; 2009.

B. AWC (WFCM) - Wood Frame Construction Manual for One- and Two-Family Dwellings; 2015.

C. ASTM A153/A153M - Standard Specification for Zinc Coating (Hot-Dip) on Iron and Steel Hardware; 2016a.

D. ASTM E84 - Standard Test Method for Surface Burning Characteristics of Building Materials;

2018b.

E. AWPA U1 - Use Category System: User Specification for Treated Wood; 2017.

F. PS 1 - Structural Plywood; 2009.

G. PS 20 - American Softwood Lumber Standard; 2015.

H. WWPA G-5 - Western Lumber Grading Rules; 2017.

1.04 SUBMITTALS

A. See Section 01 3000 - Administrative Requirements, for submittal procedures.

B. Product Data: Provide technical data on wood preservative materials.

C. Manufacturer's Certificate: Certify that wood products supplied for rough carpentry meet or exceed specified requirements.

1.05 DELIVERY, STORAGE, AND HANDLING

A. General: Cover wood products to protect against moisture. Support stacked products to prevent deformation and to allow air circulation.

PART 2 PRODUCTS

2.01 GENERAL REQUIREMENTS

A. Dimension Lumber: Comply with PS 20 and requirements of specified grading agencies.

1. Species: Douglas Fir-Larch, unless otherwise indicated.

06 1000 - 2 Rough Carpentry

2. If no species is specified, provide any species graded by the agency specified; if no grading agency is specified, provide lumber graded by any grading agency meeting the specified requirements.

3. Grading Agency: Any grading agency whose rules are approved by the Board of Review, American Lumber Standard Committee (www.alsc.org) and who provides grading service for the species and grade specified; provide lumber stamped with grade mark unless otherwise indicated.

4. Lumber of other species or grades is acceptable provided structural and appearance characteristics are equivalent to or better than products specified.

B. Lumber fabricated from old growth timber is not permitted.

2.02 DIMENSION LUMBER FOR CONCEALED APPLICATIONS

A. Grading Agency: Western Wood Products Association; WWPA G-5.

B. Sizes: Nominal sizes as indicated on drawings, S4S.

C. Moisture Content: S-dry or MC19.

D. Stud Framing (2 by 2 through 2 by 6 ):

1. Species: Douglas Fir-Larch.

2. Grade: As indicated on drawings.

E. Joist, Rafter, and Small Beam Framing (2 by 6 through 4 by 16 ):

1. Species: Douglas Fir-Larch.

2. Grade: As indicated on drawings.

F. Miscellaneous Framing, Blocking, Nailers, Grounds, and Furring:

1. Lumber: S4S, No. 2 or Standard Grade.

2. Boards: Standard or No. 3.

2.03 EXPOSED DIMENSION LUMBER

A. Submit manufacturer's certificate that products meet or exceed specified requirements, in lieu of grade stamping.

B. Grading Agency: Western Wood Products Association; WWPA G-5.

C. Sizes: Nominal sizes as indicated on drawings.

D. Surfacing: S4S.

E. Moisture Content: S-dry or MC19.

F. Stud Framing (2 by 2 through 2 by 6 ):

1. Species: Douglas Fir.

2. Grade: Clear.

G. Joist, Rafter, and Small Beam Framing (2 by 6 through 4 by 16 ):

1. Species: Douglas Fir.

2. Grade: As indicated on the drawings.

2.04 TIMBERS FOR CONCEALED APPLICATIONS

A. Grading Agency: Western Wood Products Association; WWPA G-5.

B. Sizes: Nominal sizes as indicated on drawings, S4S.

C. Moisture Content: S-dry (23 percent maximum).

D. Beams and Posts 5 inches and over in thickness:

1. Species: Douglas Fir-Larch.

2. Grade: As indicated on drawings.

2.05 EXPOSED TIMBERS

A. Submit manufacturer's certificate that products meet or exceed specified requirements, in lieu of grade stamping.

B. Moisture Content: Kiln-dry (20 percent maximum).

06 1000 - 3 Rough Carpentry

C. Surfacing: S4S.

D. Species: Douglas Fir.

E. Grade: Architectural.

2.06 CONSTRUCTION PANELS

A. Subflooring: APA PRP-108/APA PRP-108, Form B455: rated Sheathing.

1. Exposure Class: Exposure 1.

2. Span Rating: As indicated on drawings.

3. Thickness: As indicated on drawings.

B. Roof Sheathing: APA PRP-108/APA PRPR-108, Form B455, Rated Sheathing, Exposure 1, and as follows:

1. Span rating: As indicated on drawings.

2. Thickness: As indicated on drawings.

C. Wall Sheathing: APA PRP-108/APA PRP-108, FORM B455 Rated Sheathing, Exposure 1, and as follows:

1. Span rating: As indicated on drawings.

2. Thickness: As indicated on drawings.

D. Communications and Electrical Room Mounting Boards: PS 1 A-D plywood, or medium density fiberboard; 3/4 inch thick; flame spread index of 25 or less, smoke developed index of 450 or less, when tested in accordance with ASTM E84.

E. Other Applications:

1. Plywood Concealed From View But Located Within Exterior Enclosure: PS 1, C-C

Plugged or better, Exterior grade.

2. Plywood Exposed to View But Not Exposed to Weather: PS 1, A-D, or better.

3. Other Locations: PS 1, C-D Plugged or better.

2.07 ACCESSORIES

A. Fasteners and Anchors:

1. Provide fabricated post bases, column caps, beam seats, etc as indicated in drawings.

2. Metal and Finish: Hot-dipped galvanized steel complying with ASTM A153/A153M for high humidity and preservative-treated wood locations, unfinished steel elsewhere.

3. Anchors: As indicated on drawings.

B. Joist Hangers: Hot dipped galvanized steel, sized to suit framing conditions.