Washakie Roadwork Site Visit Info.pdf

PDF 1 MB Posted

Attached to
UNITED STATES FOREST SERVICE, ROCKY MOUNTAIN REGION 2, ROAD AND BRIDGE CONSTRUCTION SERVICES MATOC
Solicitation number
1240LU24R0013
Issued by

About this file

This document appears to be an information packet about roadwork for the Washakie Ranger District in the Shoshone National Forest. The scope of work includes roadway reconditioning, removal and replacement of existing culverts, installation of new culverts, placement and compaction of aggregate, and maintenance and reconstruction of drainage features on several forest service roads. The work is estimated to span approximately 33.5 miles across 8 different forest service roads. Specific activities include placing tons of compacted aggregate, removing and replacing culverts, and cleaning existing culverts. This roadwork appears to be tied to a federal contract opportunity, Solicitation Number 1240LU24R0013, for an Indefinite Delivery-Indefinite Quantity (IDIQ), Multiple Award Task Order Contract (MATOC) for road and bridge construction services for the USFS Rocky Mountain Region (Region 2). The MATOC solicitation is expected to be issued in late July 2024 as a total small business set-aside, with a minimum of 10 individual MATOC contracts expected to be awarded.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Washakie LRT Roadwork Maps:

Forest: Shoshone National Forest

District: Washakie Ranger District

Project Name: Washakie Road Work 2024

Scope:

Roadway reconditioning existing roads, removal and replacement of existing culverts, installation of new culverts, placement and compaction of aggregate, and maintenance and reconstruction of drainage features.

General Summary of Work:

NFSR 300 Louis Lake Road 19.7 miles of roadway reconditioning Level III NFSR 300 from end of pavement at Junction 302/300 (Mile 0.0) to pavement at parking area at Junction 300/HWY 28 South Pass. Place 250 tons of compacted aggregate. Remove and replace 1 existing culvert.

Install 3 new culverts. Clean 13 existing culverts.

NFSR 302 Roaring Fork Road 3.7 miles of roadway reconditioning Level III NFSR 302 from end of pavement at Junction 302/300 (Mile 0.0) to end of road (Mile 2.6), plus campground loop, plus trailhead parking loop (Mile 3.7). Place 78 tons of compacted aggregate. Install one culvert.

Clean 5 existing culverts.

NFSR 307 Fiddler Lake Road 0.9 miles of roadway reconditioning Level III NFSR 307 from Junction 300/307 to end of road, plus campground loop, plus boat dock spur. Clean 2 existing culverts.

NFSR 308 Louis Lake Access Road 1.4 miles of roadway reconditioning Level III NFSR 308 from Junction 300/308 to end of road, plus campground loop, plus boat dock spur. Clean 2 existing culverts. Place 30 tons of compacted aggregate on slumping section of road.

NFSR 300.2E Little Popo Agie Campground: Re-establish 2 rolling dips. Place 50 tons of compacted aggregate on rocky section of campground road.

NFSR 326 Limestone Road (Ed Young Rd): 6.7 miles of roadway reconditioning Level III NFSR 326 from HWY 28 (Mile 0.0) to Junction 326/352. Clean 6 culverts.

NFSR 327 Wild Iris Road: 0.8 miles of roadway reconditioning Level III NFSR 327 from Junction 326/327 (Mile 0.0) to Wild Iris Parking Area (Mile 0.7). Remove 2 abandoned culverts at Mile 0.3 and 0.4.

NFSR 351 Fairfield: 0.3 miles of roadway reconditioning Level III NFSR 326 from HWY 131/NFSR 300 (Mile 0.0) to Parking Area (Mile 0.3).

Place 100 tons of compacted aggregate. Install two culverts at Mile 0.03 and 0.12.