This document contains details about a pre-solicitation for an Indefinite Delivery-Indefinite Quantity (IDIQ), Multiple Award Task Order Contract (MATOC) for road and bridge construction and related services issued by the United States Forest Service (USFS), Intermountain Region (Region 4). The solicitation will be issued as a total small business set-aside with a minimum of 10 individual contract awards. The contract will have a 2-year base period and three 1-year option periods for a total of 5 years. Task orders will range from $2,000 to $3,000,000 with a $50,000,000 shared ceiling limit. The selection process will be conducted in accordance with FAR Part 15 source selection procedures. Seed projects will be included in the proposal package and used for price evaluation, with the intent that they will be issued as the first task orders. Site visit information for 5 seed projects is provided, including locations, dates, and high-level project descriptions. The solicitation is anticipated to be available on SAM.gov in fall 2024.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
R4 Road and Bridge - Brief Seed Project Descriptions
Charleston Jarbidge
The project consists of removing the existing Charleston-Jarbidge Road Bridge and installing a 128” x 83” corrugated metal pipe-arch culvert in the same location. Public vehicle access must be maintained during the entire project, so a rock ford and road approaches shall be constructed and maintained just upstream of the existing bridge prior to the bridge removal.
Location: Charleston, NV
Latitude, Longitude: 41.7038, -115.483787
Site Visit Date and Time: 10/9/24 at 12:00 pm (PT)
Cove Mountain Reroute and Reconstruction
The project consists of two road reroutes, road decommissioning, road reconditioning, constructing rolling dips, placement of aggregate surface coarse and a culvert installation.
Location: Pinto, UT
Latitude, Longitude: 37.5547, -113.52722
Site Visit Date and Time: 10/17/24 at 1:00 pm (MT)
North Fritz Creek Culver Replacement
The project consists of removing a 4’ diameter corrugated metal pipe and replacing it with 16’- 4” span bottomless box culvert.
Location: Dubois, ID
Latitude/ Longitude: 44.4134, -112.7376
Site Visit Date and Time: 10/16/24 at 10:00 am MT
Upper Green River Corridor
The project includes road reconditioning, culvert replacement and placement of government furnished aggregate surfacing on 3 miles road.
Location: Cora, WY
Latitude, Longitude: 43.22171, -110.008137
Site Visit Date and Time: 10/10/24 at 1:00 pm (MT)
Causey Reservoir Parking Lots and Boat Ramp
The project includes reconstructing 2 parking lots and constructing a new boat ramp.
Location: Huntsville, UT
Latitude/ Longitude: 41.29705, -111.584918
Site Visit Date and Time: 10/15/24 at 1:00 pm (MT)